ML062860327
| ML062860327 | |
| Person / Time | |
|---|---|
| Site: | Dresden, Zion |
| Issue date: | 10/11/2006 |
| From: | Jamnes Cameron NRC/RGN-III/DNMS/DB |
| To: | Crane C Exelon Generation Co, Exelon Nuclear |
| References | |
| IP 36801, IP 37801, IP 40801, IP 60801, IP 62801, IP 71801, IP 83750, IP 84750, IP 86750 | |
| Download: ML062860327 (4) | |
Text
October 11, 2006Mr. Christopher M. CranePresident and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
DRESDEN UNIT 1 AND ZION STATION MASTER INSPECTION PLANS -FISCAL YEAR (FY) 2007
Dear Mr. Crane:
In accordance with NRC Manual Chapter 2561, "Decommissioning Power Reactor InspectionProgram," the NRC Region III staff and management have developed Master Inspection Plans(MIP) for the Dresden Unit 1 and Zion Stations. The plans are based on your current performance and schedule of significant decommissioning activities planned for the sites for October 2006 through September 2007 (FY2007). The plans outline how we intend to focus our Regional inspection resources to address significant ongoing decommissioning activities. Because the FY2007 MIP is based, in part, on your proposed schedule of significantdecommissioning activities for FY2007, the plan and the focus of NRC inspection activities maychange to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY2007 MIP remains current, we request that you keep the Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the DresdenUnit 1 and Zion Station's FY2007 MIPs. We currently project the Region will conduct one inspection at Dresden Unit 1 during FY2006.The inspection will be conducted following the completion of the Unit 1 spent fuel pool drainingactivities and during the processing of the water in the 102 Tank. The following is a list of the inspection procedures we expect to use during our inspection. The specific procedures used during the inspection will depend on the specific decommissioning activities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant. InspectionProcedureInspection Procedure TitleIP 36801Organization, Management and Cost Controls IP 71801 Decommissioning Performance and Status Review IP 84750Radioactive Waste Treatment, and Effluent and Environmental Monitoring C. Crane-2-It is our expectation that we will conduct two onsite inspections at Zion during FY2007. Thefollowing is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioningactivities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant. InspectionProcedureInspection Procedure TitleIP 36801Organization, Management and Cost Controls IP 37801Safety Reviews, Design Changes, and Modifications IP 40801Self-Assessment, Auditing, and Corrective Action IP 60801Spent Fuel Pool Safety IP 62801Maintenance and SurveillanceIP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750Solid Radioactive Waste Management and Transportation of Radioactive MaterialsIn accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system(ADAMS). The NRC's document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding these inspection plans. If youhave questions, please contact Mr. William Snell of my staff at (630) 829-9871.Sincerely,/RA/Jamnes L. Cameron, ChiefDecommissioning BranchDocket Nos. 050-0010; 050-0295; 050-0304License Nos. DPR-2; DPR-39; DPR-48cc:Daren Perrero, Illinois Emergency Management Agency, Division of Nuclear Safety State Senator Garrett State Senator Geo-Karis C. Crane-2-It is our expectation that we will conduct two onsite inspections at Zion during FY2007. Thefollowing is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioningactivities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant. InspectionProcedureInspection Procedure TitleIP 36801Organization, Management and Cost Controls IP 37801Safety Reviews, Design Changes, and Modifications IP 40801Self-Assessment, Auditing, and Corrective Action IP 60801Spent Fuel Pool Safety IP 62801Maintenance and SurveillanceIP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750Solid Radioactive Waste Management and Transportation of Radioactive MaterialsIn accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system(ADAMS). The NRC's document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding these inspection plans. If youhave questions, please contact Mr. William Snell of my staff at (630) 829-9871.Sincerely,/RA/Jamnes L. Cameron, Chief Decommissioning BranchDocket Nos. 050-0010; 050-0295; 050-0304License Nos. DPR-2; DPR-39; DPR-48cc:Daren Perrero, Illinois Emergency Management Agency, Division of Nuclear Safety State Senator Garrett State Senator Geo-KarisDISTRIBUTION
- See next pageDOCUMENT NAME:E:\Filenet\ML062860327.wpdX Publicly Available G Non-Publicly Available G SensitiveX Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIRIIIRIIINAMEPJLee:mbWGSnellJLCameronDATE10/05/0610/11/0610/11/06OFFICIAL RECORD COPY C. Crane-3-DISTRIBUTION