TSTF-493 Revision 3 Letter from ITSB Changing CLIIP Milestone Completion Target Dates
ML080660678
Person / Time
Site: Technical Specifications Task Force
Issue date: 03/17/2008
From: Robert Elliott
NRC/NRR/ADRO/DIRS/ITSB
To:
Technical Specifications Task Force
Schulten C. S., NRR/DIRS, 415-1192
References
TAC MD8023
Download: ML080660678 (3)


Text

March 17, 2007

Technical Specifications Task Force

11921 Rockville Pike

Suite 100

Rockville, MD 20852

Dear Sirs:

The Technical Specification Task Force (TSTF) submitted Revision 3 of TSTF-493, "Clarify

Application of Setpoint Methodology for LSSS Functions" to the Nuclear Regulatory

Commission (NRC) by letter dated January 18, 2008. This revision to TSTF-493 responded to

the NRC staff requests for additional information on TSTF-493, Revision 2 provided in writing on

July 25, 2007. The changes outlined in TSTF-493 Rev. 3 pertain to technical specifications

requirements to ensure compliance with 10 CFR 50.36(d)(1)(ii)(A) for limiting safety system settings for automatic protective devices related to variables having significant safety functions.

Limiting safety system settings are currently defined in the Standard Technical Specifications and Bases for Babcock & Wilcox Plants (NUREG-1430), Combustion Engineering Plants (NUREG-1432), General Electric Plants (NUREG-1433 and NUREG-1434) and Westinghouse

Plants (NUREG-1431).

In consideration of the NRC intention to have a more disciplined review process for TSTFs, the

NRC staff is closing out its review of TSTF-493, Rev. 2 due to exceeding the milestone

response by 45 days. As part of the action to permanently close out TAC MD5249, the NRC

staff has issued TAC MD8023 for all new charges and set milestones target completion dates

for the Federal Register Notification for Comment and Notice of Availability to be June 13, 2008

and September 12, 2008, respectfully.

If you have any questions related to this issue or action please contact Carl Schulten at (301)

415-1192 or e-mail css1@nrc.gov.

Sincerely,

/RA/ Robert B. Elliott, Chief

Technical Specifications Branch

Division of Inspection and Regional Support

Office of Nuclear Reactor Regulation

cc: J. Messina, BWROG B. Yates, PWROG/W

David Bice, PWROG/CE

Reene' Gambrell, PWROG/B&W B. Mann, EXCEL

Technical Specifications Task Force March 17, 2008 11921 Rockville Pike

Suite 100

Rockville, MD 20852

Dear Sirs:

The Technical Specification Task Force (TSTF) submitted Revision 3 of TSTF-493, "Clarify

Application of Setpoint Methodology for LSSS Functions" to the Nuclear Regulatory

Commission (NRC) by letter dated January 18, 2008. This revision to TSTF-493 responded to

the NRC staff requests for additional information on TSTF-493, Revision 2 provided in writing on

July 25, 2007. The changes outlined in TSTF-493 Rev. 3 pertain to technical specifications requirements to ensure compliance with 10 CFR 50.36(d)(1)(ii)(A) for limiting safety system settings for automatic protective devices related to variables having significant safety functions.

Limiting safety system settings are currently defined in the Standard Technical Specifications and Bases for Babcock & Wilcox Plants (NUREG-1430), Combustion Engineering Plants (NUREG-1432), General Electric Plants (NUREG-1433 and NUREG-1434) and Westinghouse

Plants (NUREG-1431).

In consideration of the NRC intention to have a more disciplined review process for TSTFs, the

NRC staff is closing out its review of TSTF-493, Rev. 2 due to exceeding the milestone

response by 45 days. As part of the action to permanently close out TAC MD5249, the NRC

staff has issued TAC MD8023 for all new charges and set milestones target completion dates

for the Federal Register Notification for Comment and Notice of Availability to be June 13, 2008

and September 12, 2008, respectfully.

If you have any questions related to this issue or action please contact Carl Schulten at (301)

415-1192 or e-mail css1@nrc.gov.

Sincerely,

/RA/ Robert B. Elliott, Chief

Technical Specifications Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation

cc: J. Messina, BWROG B. Yates, PWROG/W

David Bice, PWROG/CE

Reene' Gambrell, PWROG/B&W B. Mann, EXCEL DISTRIBUTION

ITSB R/F RidsNrrDirs S. Pannier D. Roth J. A. Nakoski M. C. Barillas

ADAMS ACCESSION NUMBER: ML080660678 OFFICE DIRS/NRR BC/DIRS/NRR

NAME CSchulten RElliott

DATE 03/12/2008 03/17/2008 OFFICIAL RECORD COPY Technical Specifications Task Force Mailing List

cc:

Technical Specifications Task Force 11921 Rockville Pike

Suite 100 Rockville, MD 20852 Telephone: 301-984-4400 E-mail: tstf@excelservices.com

George G. (Bert) Yates

AmerenUE Callaway Plant

P.O. Box 620

Fulton, MO 65251

Telephone: 314-225-1702

E-mail: gyates@ameren.com

John Messina

First Energy Nuclear Operating Company

76 South Main Street

Mail Stop: Akron-GO-14

Akron, OH 44308

Telephone: 330-384-5878

E-mail: jmessina@firstenergycorp.com

David Bice

Entergy N-GSB64 1448 SR 333

Russellville, AR 72802

Telephone: 479-858-5338

E-mail: dbice@entergy.com

Reene' V. Gambrell

Duke Energy

Mailcode: ON03RC

7800 Rochester Highway

Seneca, SC 29672

Telephone: 864-885-3364

E-mail: RVGambrell@duke-energy.com Donald R. Hoffman EXCEL Services Corporation

11921 Rockville Pike, Suite 100

Rockville, MD 20852

Telephone: 301-984-4400

E-mail: donaldh@excelservices.com Brian Mann EXCEL Services Corporation

11921 Rockville Pike, Suite 100

Rockville, MD 20852

Telephone: 301-984-4400

E-mail: brianm@excelservices.com