ML080670032

From kanterella
Revision as of 14:02, 12 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Status Report and Proposed Schedule for FitzPatrick License Renewal at Full Committee Meeting on March 6, 2008
ML080670032
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/19/2008
From: Hammer C
Advisory Committee on Reactor Safeguards
To:
Advisory Committee on Reactor Safeguards
Hammer C G
References
Download: ML080670032 (11)


Text

Feb ruary 19 , 20 08 M E M OR A N D U M TO: A C R S M e mb e rsF R OM:

C h a rl e s G. H a mme r, S e n i o r S ta ff E n gi n e e r /R A/

React or Saf ety Branch, ACRS SU BJE CT:

TRAN SM ITT AL OF STATUS R EP ORT AN D PR OPOSE D SC HE DU LE FO R FIT ZPAT RICK LICENSE RENEW AL AT FULL CO M M IT T EE M EE TING ON M AR CH 6, 200 8 Th e fu l l C o mm i t t e e w i l l m e e t o n M a r c h 6 , 2 0 0 8 a n d r e v i e w t h e F i t z P a t r i c k l i c e n s e r e n e w a l. To prep are f or th is mee tin g, a S tatus R epo rt an d P ropo sed S che dul e a re a ttach ed.The fi n a l s a fety e v a l u a ti o n r e p o rt (S E R) for th e F i tz P a tr i ck l i ce n se r e n e w a l w a s tr a n sm i tt e d t o y o u d u ri n g th e F e b ru a ry 7-9 , 2 0 0 8 A C R S me e ti n g. A l so , th e fol l o w i n g ma te ri a l w a s se n t p ri o r to t h e S e p t e mb e r 5 , 2 0 0 7 S u b c o mm i t t e e m e e t i n g: 1.

FitzPatrick License Renew al Appli cat ion (LRA)2.

S ta ff's S E R w i th Op e n I te ms 3.

S ta ff's o n si te A u d i t S u mma ry R e p o rt 4.

R e gi o n I's L R A I n sp e ct i o n R e p o rt S ta tu s R e p o rt I f you ha ve an y q ue st ion s, ple as e c on t ac t eit he r M ait r i Ba ne r j ee (3 01) 415-69 73 (m xb@nr c.g ov)o r me a t (3 0 1) 4 1 5-7 3 6 3 (cgh@n rc.go v).cc:

F. G ill espieS. D u ra i sw a myC. Sa ntosM. B ane rjeeC. Br o wn

A DVISO RY COM MI T T EE ON REA CT OR SA FEG UA RDSR E V IE W O F L IC E N S E R E N E WA L OFFITZPA T RICK NUCLEA R POW ER PLA NTMA RC H 6, 2 008ROCKVI LLE, M A RYLA ND- STA TUS RE PO RT -PURPOSE T he purpo se of this session is to review the License Renewal Application (LRA) f or Jam es A.F i tz P a tr i ck N u cl e a r P o w e r P l a n t (J A F N P P) a n d t h e a ss o ci a te d fi n a l S a fety E v a l u a ti o n R e p o rt (SER) dated Febr uary 2008. T he f ull Com mit tee wi ll hear presen tat ions by and hold di scu ssi ons w ith rep rese ntati v es of the staff an d E ntergy N ucl ear Operati ons , Inc. The Li cen se Re new al S ubc ommitte e p rev io usl y met to d is cus s th is ap pl ic ati on and the dra f t S ER w ith op en ite ms on S epte mber 5, 2 007.BA CKGRO UND JAFNPP is l ocat ed appro xi ma tely sev en miles nort heast of Oswego , New York. Th e NRC is sue d th e J AF NP P con structi on permi t on M ay 20 , 19 70, and the op erati ng l ic ens e o n Octobe r 17 , 19 74. JA FN PP i s o f a M ark 1, GE 4, boi li ng w ater reac tor d esi gn. GE sup pl ie d th e nuc le ar s team sup pl y sy stem a nd Sto ne and W ebs ter o rigi nal ly de si gned and co nstru cted the bal anc e o f the pl ant. The JAF NP P li cen sed po w er o utpu t i s 2 536 megaw atts thermal w ith a gross e le ctri cal ou tput of app rox ima tel y 88 1 me gaw atts el ectri c. The c urren t facil ity op erati ng li cen se f or J AF NP P ex pi res at mi dni ght Octobe r 17 , 20 14.D IS C U S S ION B y l e tt e r d a te d J u l y 3 1 , 2 0 0 6 , E n te rgy N u cl e a r Op e ra ti o n s, I n c. (E N O o r th e a p p l i ca n t)sub mitted the LR A (Re f eren ce 1) i n a cco rdan ce w ith Titl e 1 0, P art 5 4, o f the Co de of F ede ral Re gul ati ons , "R e qui re me n ts for R e n e w a l o f Op e ra ti n g L i ce n se s for N u cl e a r P o w e r P l a n ts." ENO re q uest s renewal of the JAFNPP operat ing li cense f or an additional 20 y ears. Th e NRC st a ff h a s p re p a re d a S a fety E v a l u a ti o n R e p o rt (R e fere n ce 2) to s u mma ri z e t h e r e su l ts o f i ts safety rev ie w of the LR A f or c ompl ia nce w ith Titl e 1 0, P art 5 4, "R equi rements for Re new al of Operati ng Li cen ses for Nu cl ear Po w er P la nts," of the Co de of F ede ral R egu la tio ns (10 CF R Pa rt 54) an d th e gui dan ce in the N UR EG-18 00, Re v is io n 1 , "S tand ard Re v ie w P la n for Re v ie w of Li cen se Re new al A ppl ic ati ons for Nu cl ear Po w er P la nts" (SR P-L R), date d Se ptembe r 20 05.The a ppl ic ant state d th at i t ha d n ot i den tifie d a ny Tech ni cal S pec ifica tio n (TS) cha nges n e ce ss a ry t o s u p p o rt i ss u a n ce o f th e r e n e w e d o p e ra ti n g l i ce n se. T he staf f used the f ollow ing Inte rim Staf f Guidance (ISG) in the FitzPatrick LRA review: Nick el-all oy co m po ne nt s in th e r ea ct or co ola nt pr es su r e bo un da r y (LR-ISG-19B) an d C orros io n o f dry w el l she ll i n M ark I co ntai nmen ts (LR-ISG-20 06-0 1).The S ER pre sen ts th e s tatus of the sta f f's rev ie w of the F itz Pa tric k LRA. The S ER di scu sse s tw o o p e n i te ms w h i ch w e re o p e n a t th e t i me o f th e S e p te mb e r 5 , 2 0 0 7 S u b co mmi tt e e me e ti n g. As di scu sse d b el ow , the sta f f ha s s ubs equen tly cl ose d th ese OIs. The S ER co ntai ns: no con f irma tory i tems w hi ch must b e re sol v ed before the staff ca n ma ke a f in al de termin ati on on the LR A, three pro pos ed li cen se con di tio ns, and 25 co mmitments.

S U MMA R Y OF OP E N I T E MS A s a r e s u l t o f i t s r e v i e w o f t h e L R A , i n c l u d i n g a d d i t i o n a l i n fo r ma t i o n s u b mi t t e d t h r o u gh Jun e 2 0, 2 007 , the sta f f ha d e arl ie r i den tifie d th e fol lo w in g tw o o pen i tems (OIs).

A n i tem w as co n si d e re d o p e n i f, i n t h e s ta ff's ju d gem e n t i t d i d n o t me e t a l l a p p l i ca b l e r e gul a to ry requi rements at the time of the i ssu anc e o f the S ER w ith Ope n Ite ms. The sta f f as si gned a uni que i den tify in g numbe r to eac h OI. As di scu sse d b el ow , al l OIs ha v e b een cl ose d b y the s t a ff.OI 4.2.1-1: (S ER S ecti on 4.2.1 - Re acto r V ess el N eutro n F lu enc e)The s taff rev ie w ed GE-NE-B1 100 732-01 repo rt on an al y si s o f the 12 0 ca psu le remo v ed at 0 13.4 ef f ect iv e f ull power y ears (EFPYs) of operat ion submit ted by the applicant to det erm ine if cal cul ati on of f lu enc e v al ues w ere in ac cord anc e w ith the gui dan ce of RG 1.1 90, "Ca lc ul ati ona l a n d D o s i m e t r y M e t h o d s f o r D e t e r m i n i n g P r e s s u r e V e s s e l N e u t r o n F l u e n c e." T h e s t a ff dete rmin ed that the GE-NE-B1 100 732-01 repo rt di d n ot c onform to RG 1.190. The app li can t had sta ted at th e ti me th at i t w oul d s ubmi t a new flue nce ca lc ul ati on to th e s taff for rev ie w w hen compl ete. Thi s i tem w as id enti f ie d a s OI 4.2.1-1 i n th e s taff S ER W ith Ope n Ite ms i ssu ed on Jul y 31 , 20 07.The a ppl ic ant, in i ts N ov embe r 5, 200 7, re spo nse to OI 4.2.1-1, s ubmi tted a s ummary of a new ana ly si s for i ts d etermi nati on of max imu m pre ssu re v ess el ne utron flue nce. The sta f f rev ie w ed the app li can t's n ew ca lc ul ated v al ues an d foun d th e n ew ca lc ul ati on acc epta bl e a s i t ad here d w i th t h e gu i d a n ce o f R G 1.1 9 0. Th e s ta ff h a d d e te rmi n e d t h a t th e o ri gi n a l v a l u e s th a t w e re sub mitted i n L RA rema in bo und ed by the ne w ca lc ul ated v al ues; the refore, OI 4.2

.1-1 is cl ose d.The s taff's ev al uati on of thi s i tem i s d etai le d i n S ER S ecti on 4.0.A s n o te d i n t h e s ta ff's S E R w i th Op e n I te ms i ss u e d J u l y 3 1 , 2 0 0 7 , for OI 4.2.1-1 , th e a p p l i ca n t's reac tor p ress ure v ess el ne utron flue nce ev al uati on f or th e p eri od of ex tend ed ope rati on imp acte d th e s taff's rev ie w of oth er i tems i n L RA S ecti on 4.2.2.As state d i n th e s taff's S ER w ith Ope n Ite ms i ssu ed Jul y 31 , 20 07, the staff ha d foun d in f ormati on sub mitted for the foll ow in g TLAA sec tio ns of the LR A acc epta bl e p end in g resol uti on o f OI 4.2.1-1. N o w t h a t OI 4.2.1-1 i s re so l v e d a n d c l o se d , th e s ta ff fi n d s th e fol l o w i n g s u b-OI s (sOIs) cl ose d:sOI 4.2.2-1: (S ER S ecti on 4.2.2 - Pre ssu re-Tempera ture Li mits)T he staf f's revi ew of P-T li mit s w as based on the applicant's orig inal fluenc e v alues in LR A Se cti on 4.2.1. The se ori gina l v al ues ha d b een pre v io usl y found ac cep tabl e a s doc umen ted in the pre v io usl y i ssu ed SE R w ith Ope n Ite ms da ted Jul y 31 , 20 07. The staff find s th at th ese ori gina l v al ues rema in bo und ed by the ne w ca lc ul ated v al ues subm itte d by the applicant in a l ett er dat ed Nov em ber 5, 2007. T here f ore, sOI 4.2.2-1 is now cl ose d.The s taff de termin ed that the TLAA for P-T l imi ts i s a cce ptab le be cau se: (1) th e proj ect ed 54 EFPY fluenc e and ART values are in f act less than the 200 F sug g est ed in 0 RG 1.99, Se cti on 3, a nd (2) c han ges to the P-T l imi t cu rv es w il l be imp le mented by the l i ce n se a me n d me n t p ro ce ss (i.e., t h ro u gh re v i si o n s o f th e p l a n t TS) i n a cc o rd a n ce w i th 1 0 C F R 5 0.6 0 a n d 1 0 C F R P a rt 5 0 , A p p e n d i x G.sOI 4.2.3-1: (S ER Sec t ion 4.2.3 - Cha r py Up pe r-Sh elf Ene r g y)

The s ta ff d e te rmi n e d t h a t th e a p p l i ca n t co rr e ct l y u se d R G 1.9 9 , R e v i si o n 2 , P o si ti o n 1 t o calculate the pred icted per cent ag e decre ase in upper-shelf energ y (USE) conser vativ ely f or th e p eri od of ex tend ed ope rati on. The staff al so in dep end entl y ca lc ul ated: (1) the end of l ife (E OL) U SE v al ues for the be ltl in e p la te ma teri al s a t 54 E FP Y and (2) the eq uiv alent m arg in analy sis (EM A) of the perc ent dr op in U SE f or th e beltline w eld materi al s th rough 54 EF PY. V eri f y in g the drop i n U SE v al ues from neu tron irra di ati on using the RG 1.

99, Revision 2 met hodolog y, the staf f f inds that all the beltline mat erials meet 10 CF R Pa rt 50 , A ppe ndi x G, E OL U SE or EM A requi rements an d S RP-LR Se cti on 4.2.3.1.1.2 cri teri a for U SE/EM A TLAA s i n a cco rdan ce w ith 10 C FR 54.2 1(c)(1)(ii). S ER Tabl e 4.2.3-1 su mmariz es the resu lts of bo th th e a ppl ic ant's a nd the staff's i nde pen den t U SE/EM A cal cul ati ons for the l imi tin g pl ate and w el d ma teri al s.T he staf f's revi ew w as based on the f luence val ues pro vi ded by the applicant in LRA Sect ion 4.2.1. T he staf f f inds that the val ues tha t w ere sub mit ted by the applicant' s LRA sub mitted on A ugust 1 , 20 06, remai ns bou nde d b y the ne w ca lc ul ated v al ues su bmi tted by the ap pl ic ant in a le tter d ated N ov embe r 5, 200 7. Therefore, sOI 4.2.3-1 i s n ow cl ose d.sOI 4.2.4-1: (S ER S ecti on 4.2.4 - Ad justed R eference Tempera ture)The s taff co nfirmed that lo w er s hel l ax ia l w el ds 2-23 3 A , B , an d C fabri cate d from He at No. 27 204/120 08 w ere the li miti ng 1/4 T ref eren ce tempera ture (ni l-d ucti li ty tran si tio n)NDT R T r e a ct o r v e ss e l c o mp o n e n ts. Th e s ta ff c a l cu l a te d a l i mi ti n g 1/4 T R T v a l u e o f 13 2.1 F f or th is pl ate materi al ba sed on the ch emi stry factor (C F) ta bl e for p la te/forg in g 0 ma ter ials i n RG 1.99 , Revi sion 2 and a 1/4T f luence of 0.174 x 10 n/cm (E > 1.0 M eV)19 NDT at 5 4 E FP Y. The 1/4T R T v al ue cal cul ated by the sta f f at 54 EF PY i s w ith in 3.2 F of 0 that calculated (i.

e., 135.3 F) by the applicant f or th is mat erial. As the sta f f's 0 NDT i n d e p e n d e n t 1/4 T R T v a l u e a g r e e d w i t h t h a t c a l c u l a t e d b y t h e a p p l i c a n t , t h e s t a ff NDT f oun d th e a ppl ic ant's c al cul ated an d p rojecte d l imi tin g 1/4T R T v al ue f or th e re acto r NDT v ess el at 54 EF PY v al id an d foun d th e TLA A on 1/4T R T v al ues for the rea ctor v ess el th ro u gh 5 4 E F P Y a cc e p ta b l e i n a cc o rd a n ce w i th 1 0 C F R 5 4.2 1 (c)(1)(i i).The s ta ff's re v i e w w a s b a se d o n t h e a p p l i ca n t's flu e n ce v a l u e s i n L R A S e ct i o n 4.2.1. The s taff find s th at th e v al ues tha t w ere sub mitted by the ap pl ic ant's LR A on Au gust 1, 200 6, re mai n b oun ded by the ne w ca lc ul ated v al ues su bmi tted by the ap pl ic ant in a l e tt e r d a te d N o v e mb e r 5 , 2 0 0 7. Th e re fore , sO I 4.2.4-1 i s n o w c l o se d. sOI 4.2.5-1: (S ER S ecti on 4.2.5 - Re acto r V ess el C irc umf eren tia l W el d In spe cti on R e l i e f)T he staf f f inds the applicant

's ev aluation f or th is TLAA acc epta ble because th e 54 EFPY con di tio nal fail ure prob abi li ty for the rea ctor v ess el ci rcumferenti al w el ds is bo und ed by the ana ly si s i n th e s taff S ER da ted Jul y 28 , 19 98, and the ap pl ic ant w il l use pro ced ures a n d t ra i n i n g to l i mi t co l d o v e r-p re ss u re e v e n ts d u ri n g th e p e ri o d o f ex te n d e d o p e ra ti o n. This an al y si s s ati sfies the ev al uati on requi rements of the sta f f S ER da ted Jul y 28 , 19 98;how ev er, th e a ppl ic ant sti ll must request rel ie f from the ci rcumferenti al w el d e x ami nati on f or th e p eri od of ex tend ed ope rati on in ac cord anc e w ith 10 C FR 50.55a.The s ta ff's re v i e w w a s b a se d o n t h e a p p l i ca n t's flu e n ce v a l u e s i n L R A S e ct i o n 4.2.1. The s taff find s th at th e v al ues tha t w ere sub mitted by the ap pl ic ant's LR A sub mitted on Au gust 1, 200 6, re mai ns bou nde d b y the ne w ca lc ul ated v al ues su bmi tted by the app li can t i n a l etter date d N ov embe r 5, 200 7. Therefore, sOI 4.2.5-1 i s n ow cl ose d.

sOI 4.2.6-1: (S ee SER Sec t ion 4.2.6 - Rea ct or Ves se l Axial W eld Fai lur e Pr ob ab ilit y)The s taff rev ie w ed LR A Se cti on 4.2.6 , to v eri f y pu rsua nt to 10 C FR 54.21(c)(1)(i i) that the ana ly ses ha v e b een pro jected to the end of the pe rio d o f ex tend ed ope rati on. The staff rev ie w ed the app li can t's TLAA of the rea ctor v ess el ax ia l w el d fai lu re p roba bi li ty , as summari z ed in LR A Se cti on 4.2.6 , an d i ts re spo nse to RA I 4.2.6.1 date d F ebru ary 12 , 200 7, s upp le mented by l etter date d J une 20 , 20 07, and de termin es that the app li can t app ropri atel y de scri bed ho w the co ndi tio nal fail ure prob abi li ty for the rea ctor v ess el ax ia l w el ds is bo und ed by the an al y si s i n th e s taff su ppl emen tal S ER da ted M arch 7, 200 0, o n t h e B W R V IP-0 5 R e p o rt for t h e p e ri o d o f ex te n d e d o p e ra ti o n. Th e s ta ff t h e re fore f in ds the app li can t's TLAA S ecti on 4.2.6 an d U FS AR su ppl emen t su mmary de scri pti on A.2.2.1.6 ac cep tabl e. The s taff co ncl ude s th at th e a ppl ic ant's TLA A f or th e re acto r vessel ax ial w eld f ailure proba bility comp ly w ith the 10 CFR 54.21(c)(1)(ii) TLAA acc epta nce cri teri on.The s ta ff's re v i e w w a s b a se d o n t h e a p p l i ca n t's flu e n ce v a l u e s i n L R A S e ct i o n 4.2.1. The s taff find s th at th e n ew ca lc ul ated v al ue sub mitted by the ap pl ic ant in a le tter d ated N o v e mb e r 5 , 2 0 0 7 r e ma i n s b o u n d e d b y t h e v a l u e t h a t w a s su b mi tt e d b y t h e a p p l i ca n t's LR A sub mitted on A ugust 1 , 20 06. There f ore, sOI 4.2.6-1 is no w cl ose d.sOI B.1.24-3: (S e e S E R S e ct i o n 3.0.3.2.1 6 - R e a ct o r V e ss e l S u rv e i l l a n ce P ro gra m)On the ba si s o f the sta f f's rev ie w for LR A ite m B.1.24 di scu sse d i n S ER S ecti on 3.0 and the new ca lc ul ated flue nce v al ue sub mitted by the ap pl ic ant in a le tter d ated N ov embe r 5, 2007, the sta f f f inds that the val ues tha t w ere sub mit ted by the applicant' s LRA sub mitted on A ugust 1 , 20 06, remai ns bou nde d b y the ne w ca lc ul ated v al ues su bmi tted b y t h e a p p l i ca n t i n a l e tt e r d a te d N o v e mb e r 5 , 2 0 0 7. Th e re fore , th e a p p l i ca n t's imp le mentati on of the Integrated S urv ei ll anc e P rogram (ISP

), as sp eci f ie d i n th e B W R V IP-1 1 6 R e p o rt , re ma i n s v a l i d a n d a s su ch , th e v a ri o u s a tt ri b u te s i n t h e I S P a re not aff ecte d b y the ne w meth odo lo gy of cal cul ati ng the ne utron flue nce v al ues. The staff find s th at th e a ppl ic ant has de monstra ted that the eff ects of aging d ue to l oss of f rac tur e toug hness of the reac tor press ure vessel beltline reg ion w ill be adeq uate ly mana ged, so tha t the i nten ded functi ons w il l be mai ntai ned co nsi sten t w ith the C LB for th e p e ri o d o f ex te n d e d o p e ra ti o n , a s re qui re d b y 1 0 C F R 5 4.2 1 (a)(3). The re fore , sO I B.1.24-3 i s n ow cl ose d.OI 4.3.3-1: (S ER S ecti on 4.3.3 - Eff ects of Rea ctor W ater En v iro nmen t on F ati gue L ife)By l etter date d A ugust 1 4, 2 007 , as su ppl emen ted by l etter date d N ov embe r 5, 200 7, th e a p p l i ca n t re sp o n d e d t o R A I 4.3.3-1 a n d r e so l v e d t h e s ta ff's i ss u e i d e n ti fie d i n OI 4.3.3-1.In th ese l etters , the ap pl ic ant amen ded the LR A and su ppl emen ted Co mmitment No. 20 to ju sti f y i ts e nv iro nmen tal ly-ass is ted f ati gue a nal y si s. The No v embe r 5, 200 7, l etter cl ari f ie d th at Opti on 1 o f C ommitmen t N o. 2 0 for re f in ed CU F cal cul ati ons i s c ons is tent w i th N R C r e co mme n d a ti o n s for p e ri o d i c C U F u p d a te s i n " mo n i to ri n g a n d t re n d i n g" (i.e., program e le ment 4) o f GAL L A M P X.M 1, "M etal F ati gue o f the R eac tor C ool ant Pre ssu re B oun dary ," an d for "co rrecti v e a cti ons" i n GA LL AM P X.M 1. The a ppl ic ant al so cl ari f ie d th at Opti ons 2 and 3 of Commi tment N o. 2 0 a re c orrec tiv e a cti ons con si sten t w ith tho se reco mmende d i n "c orrec tiv e a cti on" (i.e., pro gram el emen t 7) of the same GALL A M P. W ith the se cl ari f ic ati ons , the ap pl ic ant amen ded the LR A to b rin g Com mit me nt No. 20 w ithin the scop e of the Fatig ue M onitor ing Prog ram and to credit thi s A M P as the bas is for acc epta nce of thi s TLA A as in ac cord anc e w ith 10 C FR 5 4.2 1 (c)(1)(i i i).After rev ie w in g the le tter d ated A ugust 1 4, 2 007 , as su ppl emen ted by the l etter date d No v embe r 5, 200 7, th e s taff find s th e a ppl ic ant's c la rifica tio n o f the se cha nges co n si st e n t w i th N R C r e co mme n d a ti o n s i n GA L L A M P X.M 1 a n d t h e re fore a re acc epta bl e. The s taff co ncl ude s th at th e a ppl ic ant's re spo nse i s a cce ptab le an d, ther ef ore, OI 4.3.3.1 is closed.

The staf f's ev aluation of the applicant' s resp onse is deta il ed in S ER S ecti on 4.3.3.S U MMA R Y OF C ON F IR MA T OR Y I T E MS T here are no conf irm ator y item s in the SER.

SUMM A RY OF PROPO SED LICENSE CONDITIO NS Fol lo w in g the staff's rev ie w of the LR A, in cl udi ng sub sequen t i nformatio n a nd cl ari f ic ati ons from the app li can t, the sta f f i den tifie d th ree prop ose d l ic ens e c ond iti ons.The first li cen se con di tio n re quire s th e a ppl ic ant to i ncl ude the U FS AR su ppl emen t requi red by 10 CF R 54.2 1(d) in the ne x t U FS AR up date requi red by 10 C FR 50.71(e) foll ow in g the is sua nce of the rene w ed li cen se.The s e co n d l i ce n se c o n d i ti o n r e qui re s futu re a ct i v i ti e s d e sc ri b e d i n t h e U F S A R s u p p l e me n t to be compl eted pri or to the pe rio d o f ex tend ed ope rati on.The th ird l ic ens e c ond iti on requi res that al l cap sul es in the rea ctor v ess el tha t are remo v ed and teste d me et th e re quire ments of Ameri can S oci ety for Testi ng an d M ateri al s (A STM) E 18 5-82 to t h e e x te n t p ra ct i ca b l e for t h e c o n figu ra ti o n o f th e s p e ci me n s i n t h e c a p su l e. A n y c h a n ges t o the cap sul e w ith draw al sc hed ul e, i ncl udi ng spa re c aps ul es, must b e a ppro v ed by the sta f f pri or to i mpl emen tati on. A ll ca psu le s p la ced i n s torage must b e ma in tai ned for f uture i nse rtio n. An y cha nges to sto rage re quire ments must b e a ppro v ed by the sta f f , as requi red by 10 CFR Part 50, Appendix H.SU M M A RY O F CO M M I TM EN TS During the review by the NRC staf f , the applicant ma de com mit me nts w hich are listed in detail i n A p p e n d i x A t o t h e S E R. Th e a p p l i ca n t ma d e 2 5 c o mmi tme n ts r e l a te d t o t h e A M P s to mana ge agin g ef f ects of structu res and co mpon ents. The foll ow in g is a summary l is t of thes e commi tments: 1.

Im pleme nt th e Buried Piping and T ank s Insp ect ion Prog ram as described in LRA S e ct i o n B.1.1 2.

Enhance the BW R CRD Retur n Line Noz zl e Prog ram to examine the CRDRL n o z z l e-t o-v e ss e l w e l d a n d t h e C R D R L n o z z l e i n si d e r a d i u s se ct i o n p e r S e ct i o n XI Tabl e IW B-2 500-1 C ategory B-D Items B 3.90 an d B 3.10 0.3.

E n h a n c e t h e D i e s e l F u e l M o n i t o r i n g P r o gr a m t o i n c l u d e p e r i o d i c d r a i n i n g, c l e a n i n g, v i su a l i n sp e ct i o n s, a n d u l tr a so n i c me a su re me n t o f th e b o tt o m s u rfac e s o f th e fi re p u mp di ese l f uel oi l tanks, E DG d ay tan ks, and E DG fuel oi l stora ge tan ks to e nsu re th at si gni fic a n t d e gra d a ti o n i s n o t o cc u rr i n g. E n h a n ce t h e D i e se l F u e l M o n i to ri n g P ro gra m t o s p e c i fy a c c e p t a n c e c r i t e r i a fo r U T me a s u r e me n t s o f d i e s e l ge n e r a t o r fu e l s t o r a ge t a n ks w i th i n t h e s co p e o f th i s p ro gra m.4.

En han ce the Ex terna l Su rf ace s M oni tori ng Pro gram guida nce do cumen ts to i ncl ude peri odi c i nsp ecti ons of sy stems in sc ope an d s ubje ct to agi ng mana gement re v ie w (AM R) f or l ic ens e re new al i n a cco rdan ce w ith 10 C FR 54.4(a)(1) an d (a)(3). In spe cti ons sha ll i ncl ude are as surro und in g the sub ject s y stems to i den tify ha z ards to thos e system s. I nspec tions of nearby sy ste ms that could i mp act the subj ect sy ste ms w ill in cl ude S SC s th at a re i n s cop e a nd sub ject to agi ng mana gement re v ie w for l ic ens e re n e w a l i n a cc o rd a n ce w i th 1 0 C F R 5 4.4 (a)(2).5.

En han ce the Fi re P rotec tio n P rogram to in spe ct fire barri er w al ls , ce il in gs, and floo rs a t le ast onc e e v ery refuel in g outa ge. Insp ecti on resu lts w il l be acc epta bl e i f the re a re n o v is ual i ndi cati ons of de gradati on suc h a s c racks, h ol es, spa ll in g, or gouges.

E nha nce the Fi re P rotec tio n P rogram to in spe ct a t l eas t on e s eal of ea ch ty pe ev ery 24 mon ths.6.

En han ce the Fi re W ater Pro gram to i ncl ude i nsp ecti on of hose ree ls for corro si on.A cc e p ta n ce c ri te ri a w i l l b e e n h a n ce d t o v e ri fy n o s i gni fic a n t co rr o si o n. E n h a n ce F i re W ater Pro gram to i ncl ude v is ual i nsp ecti on of spray an d s pri nkler sy stem i ntern al s for ev id enc e o f co rrosi on. Acc epta nce cri teri a w il l be enh anc ed to v eri f y no si gnifica nt cor ros ion. Enhance Fire W ater Prog ram to include that a sample of sprink ler heads w ill be in spe cted us in g guida nce of NF PA 25 (20 02 Ed iti on) Se cti on 5.3.1.1.1. NF PA 25 al so con tai ns guid anc e to rep eat sampl in g ev ery 10 y ears after i ni tia l f ie ld se rv ic e te st i n g. E n h a n ce F i re W a te r P ro gra m t o i n cl u d e t h a t w a l l t h i ckn e ss e v a l u a ti o n s o f fir e w a te r p i p i n g w i l l b e p e rfor me d o n s y st e m c o mp o n e n ts u si n g n o n-i n tr u si v e t e ch n i que s to id enti f y ev id enc e o f l oss of materi al du e to co rrosi on. Thes e i nsp ecti ons w il l be performed before the end of the cu rrent ope rati ng term a nd at i nterv al s th erea f ter d uri ng th e p e ri o d o f ex te n d e d o p e ra ti o n. R e su l ts o f th e i n i ti a l e v a l u a ti o n s w i l l b e u se d t o dete rmin e th e a ppro pri ate in spe cti on in terv al to ens ure agin g ef f ects are id enti f ie d p rio r to l oss of i nten ded functi on.7.

Im pleme nt th e Heat Exchang er M onitor ing Prog ram as described in LRA Se cti on B.1.15.8.

Im pleme nt th e M etal-Enclosed Bus Ins pect ion Prog ram as described in LRA Se cti on B.1.17.9.

Im pleme nt th e Non-EQ Inst rum enta tion Circuit s Rev iew Prog ram as described in LRA Se cti on B.1.18.10.

Im pleme nt th e Non-EQ Insulat ed Cables and Connections Prog ram as described in LRA Se cti on B.1.19.1 1.

E n h a n ce t h e Oi l A n a l y si s P ro gra m t o p e ri o d i ca l l y s a mp l e l u b ri ca ti n g o i l i n t h e s e cu ri ty genera tor, a nd the f ire pu mp d ie sel. E nha nce the Oi l An al y si s P rogram to in cl ude v is cos ity an d n eutra li z ati on numb er d etermi nati on of oi l sampl es f rom co mpon ents tha t do not hav e re gula r oi l cha nges. En han ce the Oil A nal y si s P rogram to in cl ude pa r t ic ula t e an d wat er co nt en t f or oil r ep lac ed per iod ic all y.12.

Impl emen t the One-Time In spe cti on Pro gram as des cri bed i n L RA S ecti on B.1.21.

1 3.

E n h a n ce t h e P e ri o d i c S u rv e i l l a n ce a n d P re v e n ti v e M a i n te n a n ce P ro gra m a s n e ce ss a ry to a ssu re th at th e e f f ects of aging w il l be mana ged i n a cco rdan ce w ith JA F-R PT-05-L RD 02.14.

En han ce the Re acto r V ess el S urv ei ll anc e P rogram to in cl ude the da ta a nal y si s, acc epta nce cri teri a, a nd corre cti v e a cti ons de scri bed i n L RA S ecti on B.1.24.15.

Impl emen t the S el ecti v e L eac hi ng Pro gram in ac cord anc e w ith the pro gram as des cri bed i n L RA S ecti on B.1.25.16.

En han ce the Struc tures M oni tori ng Pro gram proc edu re to:-

spe ci f y tha t man hol es, duc t ba nks, un dergroun d fuel oi l tank founda tio ns, manw ay se al s a nd gaskets, ha tch sea ls an d gaskets, und erw ater con crete i n th e i n ta ke st ru ct u re , a n d c ra n e r a i l s a n d gi rd e rs a re i n cl u d e d i n t h e p ro gra m.-

in cl ude gui dan ce f or p erforming stru ctura l ex ami nati ons of el asto mers a nd rubb er c ompo nen ts to i den tify cra cking a nd cha nge i n ma teri al pro perti es.-

in cl ude gui dan ce f or p erforming pe rio di c i nsp ecti ons to con f irm the abs enc e o f a gi n g e ff e ct s for l u b ri te s u rfac e s i n t h e t o ru s ra d i a l b e a m s e a ts a n d for l u b ri te surfaces in the toru s s upp ort s add le s.-

pe r f or m an e ng ine er ing evalu at ion on a per iod ic bas is (a t lea st onc e eve r y f ive y ears) of ground w ater sampl es to a sse ss agg ress iv ene ss (pH < 5.5, c hl ori de >5 0 0 p p m a n d s u l fate > 1 5 0 0) o f gro u n d w a te r to c o n cr e te. -

in spe ct a ny i nac ces si bl e c onc rete area s th at ma y be ex pos ed by ex cav ati on f or any reas on, or any inaccessible area where obser ved condit ions in acces sible area s, w hi ch are ex pos ed to th e s ame env iro nmen t, sh ow tha t si gnifica nt c o n c r e t e d e gr a d a t i o n i s o c c u r r i n g.17.

Im pleme nt th e Th erm al Aging and Neutro n Irr adiation Em brit tlem ent of Cast Aust enitic Sta in le ss Ste el (C AS S) Pro gram as des cri bed i n L RA S ecti on B.1.28.18.

En han ce the W ater Ch emi stry C ontro l - A ux il ia ry S y stems Pro gram to i ncl ude gui dan ce f or s ampl in g the con trol roo m an d re la y roo m chi ll ed w ater, dec ay he at re mov al co ol in g w a te r, a n d t h e s e cu ri ty ge n e ra to r ja cke t co o l i n g w a te r.19.

En han ce the Bo lti ng Integri ty P rogram to in cl ude gui dan ce f rom E PR I N P-5 769 an d EPRI T R-104 213. Enhance the Bolting Inte g rity Prog ram to clarif y that actual yi eld stren gth i s u sed i n s el ecti ng materi al s for l ow su sce pti bi li ty to SC C and to cl ari f y the p r o h i b i t i o n o n u s e o f l u b r i c a n t s c o n t a i n i n g M o S 2 fo r b o l t i n g.20.

At le ast 2 y ears pri or to en teri ng the pe rio d o f ex tend ed ope rati on, f or th e l oca tio ns identif ied in NUREG/CR-6260 f or BW Rs of the JAFNPP v intag e, JAFNPP w ill i mp l e me n t o n e o r m o r e o f t h e fo l l o w i n g:(1) R efine the fatigue ana ly ses or dev el op new an al y ses (C la ss 1 R HR pi pi ng an d Cl ass 1 f eed w ater pi pi ng l oca tio ns), if ne ces sary , to dete rmin e v al id C UF s l ess tha n 1 w hen ac cou nti ng f or th e e f f ects of reacto r w ater env iro nmen t. Thi s i ncl ude s a ppl y in g the en app ropri ate F factors to v al id C UF s d etermi ned i n a cco rdan ce w ith on e o f the foll ow in g opti ons.

-

For locat ions, including NUREG/CR-6260 locations , w ith exi sting f atig ue analy sis v al id for the pe rio d o f ex tend ed ope rati on, use the ex is tin g CU F to d etermi ne the env iro nmen tal ly ad justed C UF.-

M ore limiting JAFNPP-spec if ic locations w ith a v alid C UF may be added in add iti on to th e N UR EG/CR-626 0 l oca tio ns.-

Re pres enta tiv e C UF v al ues from othe r pl ants , ad justed to or e nv el opi ng the JA F N P P p l a n t sp e ci fic e x te rn a l l o a d s ma y b e u se d i f de mo n st ra te d a p p l i ca b l e t o JAFNPP.-

For lo cati ons , i ncl udi ng NU RE G/CR-6 260 l oca tio ns, an ana ly si s u si ng the N R C-a p p ro v e d A S M E c o d e 2 0 0 1 e d i ti o n u p t o a n d i n cl u d i n g 2 0 0 3 a d d e n d u m, may be pe rf ormed to d etermi ne a v al id C UF.enThe d etermi nati on of F w il l acc oun t for op erati ng ti me w ith no rmal w ater che mistry an d o p e ra ti n g ti me w i th h y d ro gen w a te r ch e mi st ry. (2) M ana ge the eff ects of aging d ue to fatigue at the aff ecte d l oca tio ns by an i nsp ecti on prog ram that has been review ed and approved by the NRC (e.

g., periodic non-des tructi v e e x ami nati on of the aff ecte d l oca tio ns at i nsp ecti on in terv al s to be d e te rmi n e d b y a me th o d a cc e p ta b l e t o t h e N R C).(3) R epa ir or re pl ace the aff ecte d l oca tio ns before ex cee di ng a CU F of 1.0.Sh oul d J AF NP P sel ect Optio n 2 to mana ge en v iro nmen tal ly as si sted fatigue duri ng the peri od of ex tend ed ope rati on, deta il s o f the agi ng mana gement p rogram su ch as sco pe, qual ifica tio n, me thod , an d frequenc y w il l be sub mitted to the NR C at l eas t 2 y ears pri or to th e p eri od of ex tend ed ope rati on.21.

En han ce the BW R Ve sse l Intern al s P rogram to in spe ct fifteen (1

5) p erce nt o f the top guid e l oca tio ns usi ng en han ced v is ual i nsp ecti on tech ni ques. E VT-1, w ith in the first 1 8 y ears of the pe rio d o f ex tend ed ope rati on, w ith at le ast one-thi rd o f the i nsp ecti ons to be compl eted w ith in the first s ix (6) y ears an d a t l eas t tw o-thi rds w ith in the first 1 2 y ears of the peri od of ex tend ed ope rati ons. Lo cati ons se le cted for ex ami nati on w il l be area s th at hav e e x cee ded the ne utron flue nce thre sho ld.22.

En han ce the BW R Ve sse l Intern al s P rogram to ens ure the eff ects of aging o n th e s team dry er a re ma naged i n a cco rdan ce w ith the gui del in es of BW RV IP-13 9 a s a ppro v ed by the NR C and ac cep ted by the B W RV IP Ex ecu tiv e C ommitte e.23.

Enhance the BW R Vessel Inte rnals Pro g ram to perf orm inspections of the cor e plate rim hol d d ow n b ol ts.Ap pen di x A.2.2.7 C ore Pl ate is rev is ed to a dd that JAF NP P w il l perform on e o f the fo l l o w i n g:(1) In st a l l c o re p l a te w e d ges p ri o r to t h e p e ri o d o f ex te n d e d o p e ra ti o n; o r,(2) C ompl ete a p la nt-sp eci f ic an al y si s to de termin e a cce ptan ce cri teri a for co nti nue d in spe cti on of core pl ate rim hol d d ow n b ol tin g in ac cord anc e w ith B W RV IP-25 an d sub mit the in spe cti on pl an, al ong w ith the ac cep tanc e c rite ria an d ju sti f ic ati on f or th e inspect ion plan, to the NRC two years prior to the per iod of ex tend ed opera tion f or NRC review and approval.

If Opti on 2 i s s el ecte d, th e a nal y si s to de termin e a cce ptan ce cri teri a w il l add ress the in f ormati on requeste d i n R AIs 3.1.2-2A an d 4.7.3.2-1.24.

Impl emen t the B ol ted Co nne cti ons P rogram as de scri bed i n L RA S ecti on B.1.31.25.

Impl emen t the Oi l-F il le d C abl e S y stem a ging man agement that w il l be con trol le d b y the f ol lo w in g programs:

-

Ex terna l Su rf ace s M oni tori ng Pro gram-Oil A nal y si s P rogram-Pe rio di c S urv ei ll anc e a nd Pre v enti v e M ai nten anc e P rogram ONSI T E A UDIT A ND REGIO NA L INSPECT IO N A CT IVI T IES In s upp ort o f the sta f f's rev ie w of the LR A f or J AF NP P, an NR C proje ct te am co ndu cted thre e ons ite au di ts to rev ie w the A M Ps, AM Rs, and TLAA s a nd is sue d a rep ort d ated Ju ne 19, 200 7 (Re f eren ce 3). Al so, an in spe cti on w as performed by R egio n I w hi ch rev ie w ed the scre eni ng and sc opi ng of non-safety rel ated sy stems, structu res, and co mpon ents i n A M Ps. The R egio n I i n sp e ct i o n r e p o rt i s d a te d A u gus t 2 , 2 0 0 7 (R e fere n ce 4).E X P E C T E D C OMMI T T E E A C T ION The C ommitte e w il l rev ie w thi s matte r an d ma y pro v id e a rep ort d uri ng the M arch 6-8 , 20 08 A C R S m e e t i n g.Re feren ces 1.

EN O Li cen se Re new al A ppl ic ati on f or F itz Pa tric k, dated Ju ly 31 , 20 06, M L06 216 049 1 2.

NR C Sa f ety E v al uati on Re port, date d F ebru ary 20 08, M L08 025 037 2 3.

NR C Sta f f on si te A udi t R epo rt, da ted Jun e 1 9, 2 007 , M L07 158 004 9 4.

NR C Insp ecti on Re port 050 003 33/2 007 007 , da ted Au gust 2, 200 7, M L07 214 063 7 A dv isory C ommittee on Re acto r S afeg uar ds Re v iew o f Lic ens e R ene w al o f FitzP atrick N ucle ar Po w er Pla nt M arch 6, 200 7 R o c k vi ll e , MD-PRO POSED SCHEDULE-Co gniz ant Sta f f E ngin eer: Ch arl es G. Ha mmer c gh@nrc.gov (301) 41 5-73 63T o p ic sP re s e n te rsT ime Openi ng Re marks M. B ona ca, AC RS 8:35 am - 8:4 0 a m Sta f f Intro duc tio n P.T. Ku o, N RR 8:40 am - 8:4 5 a m En tergy Intro duc tio n En tergy 8:45 am - 8:5 0 a m Fi tz Pa tric k Li cen se Re new al A ppl ic ati on Pre sen tati on En tergy 8:50 am - 9:5 0 a m N R C S ta ff R e v i e w S u mma ry N R C On si te I n sp e ct i o n R e su l ts NRC Audit T. Le, NRR G. M y er, R egio n I K. Chang , NRR 9:50 am - 10:20 am Co mmittee D is cus si on M. B ona ca, AC RS 10:2 0 a m - 1 0:30 am NOTE: C Pres enta tion tim e should not exceed 50 percent of the tot al time allocated f or a specif ic ite m. The remai ni ng 50 pe rcen t of the time i s re serv ed f or d is cus si on.C 50 cop ie s o f the pre sen tati on materi al s to be pro v id ed.