ML11182B053

From kanterella
Revision as of 14:47, 10 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
HNP Supplement to Mur Power Uprate LAR
ML11182B053
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/29/2011
From: Som S
Electrical Engineering Branch
To: Mozafari B
Division of Operating Reactor Licensing
References
Download: ML11182B053 (3)


Text

1 NRR-PMDAPEm Resource From: Som, Swagata Sent: Wednesday, June 29, 2011 10:11 AM To: Mozafari, Brenda Cc: Goel, Vijay; Mathew, Roy

Subject:

RE: HNP Supplement to MUR Power Uprate LARBrenda - As discussed, we can now accept the revised LAR for further review. This is our branch position.

Thanks Swagata From: Mozafari, Brenda Sent: Wednesday, June 29, 2011 9:27 AM To: Som, Swagata

Subject:

FW: HNP Supplement to MUR Power Uprate LAR Can you please send the acceptance review eMail you sent and retracted, I assume that will be the LIC 109 status fir EEEB.

Thanks Brenda415 2020 From: Goel, Vijay Sent: Tuesday, June 28, 2011 6:51 PM To: Mozafari, Brenda; Som, Swagata Cc: Mathew, Roy

Subject:

RE: HNP Supplement to MUR Power Uprate LAR Brenda/Som, I have looked at the revised "Electrical Equipment Design" descriptions provided in Enclosure 2 of the

supplement to the LAR.

Although, the description relating to the iso-phase bus is still somewhat not clear (i.e., further clarifications will be required during RAI process), we can accept the LAR for further review.

Vijay From: Mozafari, Brenda Sent: Monday, June 27, 2011 8:22 AM To: Som, Swagata; Goel, Vijay; Mathew, Roy

Subject:

FW: HNP Supplement to MUR Power Uprate LAR This is the supplemental information for the MUR. Provided the information is robust enough to start your review I will be expecting to be able to send the LIC-109 letter today. Let me know.

Brenda 415 2020 2 From: Bass, Kimberly [1]

Sent: Thursday, June 23, 2011 4:56 PM To: Mozafari, Brenda Cc: Caves, John

Subject:

HNP Supplement to MUR Power Uprate LAR Brenda, IhaveattachedanelectronicversionoftheHNPMURPowerUprateLAR(Supplement)withtheinformationthatwasrequestedduringdiscussionsheldwiththeNRCoverthelastmonth.Theattachedversionexcludestwoenclosures(enclosures5&6)becauseofproprietaryinformation.TheoriginalMURUprateLAR(submittedApril28,2011)containstheidenticalenclosures.Noinformationwaschangesinthoseenclosures.Afullcopyoftherevisedapplicationhasbeenplacedinthemail.

KimBassLicensingEngineerLicensing&RegulatoryProgramsProgressEnergyHarrisNuclearPlant919 3622326kimberly.bass@pgnmail.com Hearing Identifier: NRR_PMDA Email Number: 88 Mail Envelope Properties (AF843158D8D87443918BD3AA953ABF782B68068ED5)

Subject:

RE: HNP Supplement to MUR Power Uprate LAR Sent Date: 6/29/2011 10:10:40 AM Received Date: 6/29/2011 10:10:40 AM From: Som, Swagata Created By: Swagata.Som@nrc.gov Recipients: "Goel, Vijay" <Vijay.Goel@nrc.gov>

Tracking Status: None "Mathew, Roy" <Roy.Mathew@nrc.gov>

Tracking Status: None "Mozafari, Brenda" <Brenda.Mozafari@nrc.gov> Tracking Status: None

Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 2264 6/29/2011 10:10:40 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: