ML120260306
| ML120260306 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 08/29/2011 |
| From: | NRC/RGN-III/DRS/OLB |
| To: | Exelon Generation Co, Exelon Nuclear |
| Shared Package | |
| ML11354A100 | List: |
| References | |
| 50-461/11-301 | |
| Download: ML120260306 (66) | |
Text
{{#Wiki_filter:2011 CLINTON POWER STATION INITIAL EXAMINATION MISCELLANEOUS CORRESPONDENCE UNITED NUCLEAR REGULATORY REGION 2443 WARRENVillE ROAD, SUITE LISLE, ILLINOIS August 17, 2011 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville,IL 60555
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL
Dear Mr. Pacifio:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Clinton Power Station. The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Steven Gackstetter, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence. The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," one day during the week of August 29, 2011. The NRC staff will administer the operating tests during the week of August 22,2011. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9707. Please contact your Chief Examiner, Mr. Michael E. Bielby at 630-829-9762, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the M. Pacilio Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Distribution via ListServ S. Gackstetter, Training Department M. Pacilio Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at httg:Jlwww.nrc.gov/reading-rm/adams.html. Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. License No. cc: Distribution via ListServ S. Gackstetter, Training Department Daniel RidsNrrDorlLpl3-2 RidsNrrPMClinton RidsNrrDirslrib Cynthia Steven Jared Allan Carole Linda Patricia Tammy ROPreports John McHale, Jan R. Kweiser, DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 8_11 Clinton Exam Approval.docx To receive a cop of this document, Indicate In the box "C" :: Copy w/o attach/end "E" :: Copy with attach/enel "N" :: No copy Rill: DRS UNITED NUCLEAR REGULATORY REGION 2443 WARRENVILLE ROAD, SUITE LISLE, IL May 4,2011 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555 CLINTON POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION
Dear Mr. Pacilio:
In a telephone conversation on January 20, 2011, between Mr. W. Kiser, Exam Lead and Mr. M. Bileby, Chief Examiner, arrangements were made for the administration of licensing examinations at the Clinton Power Station during the weeks of August 22 and August 29, 2011. In addition, the NRC will make an examination validation visit to your facility the week of August 1, 2011. As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9, Supplement 1, of NUREG-1 021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by May 16, 2011. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by July 11, 2011. Pursuant to Title 10, Section 55.40(b)(3}, of the Code of Federal Regulations (10 CFR 55 . .40(b)(3)}, an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. M. Pacilio To permit timely !\IRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 {44 U.S.C. 3501 et seq.}. These information collections were approved by the Office of Management and Budget. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to I!\IFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Kiser has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. M. Bielby at 630-829-9762, or me at 630-829-9707. Sincerely, IRA by Bruce Palagi Acting forI Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Distribution via ListServ , M. Pacifio To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will available electronically for public inspection in the NRC Public Document Room or from Publicly Available Records System (PARS) component of NRC's Agencywide Access and Management System (ADAMS), accessible from the NRC Web site http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Thank you for your cooperation in this matter. Mr. Kiser has been advised of the pOlicies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. M. Bielby at 630-829-9762, or me at 630-829-9707. Sincerely, IRA by Bruce Palagi Acting forI Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. License No. cc: Distribution via ListServ DISTRIBUTION: See next page DOCUMENT NAME: CLI 05 11 DRS OL INITIAL EXAM CONFIRMATION.DOCX o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" =Copy without attach/encl "E" = Copy with a tta c h/enc I "N" == N 0 copy OFFICE RIII:DRS I RIII:DRS I I I NAME MBielby:co BPalagi for HPeterson DATE 05/4/11 05/4/11 OFFICIAL RECORD Letter to Michael J. Pacilio from Hironori Peterson, dated May 4,2011. SUB..IECT: CLINTON POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION DISTRIBUTION: Daniel Merzke RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Patricia Buckley Tammy Tomczak John McHale Kweiser, Janet From: Burza, Justine Sent: Friday, May 06, 2011 2:30 PM To: Merzke, Daniel; RidsNrrDorlLpl3-2 Resource; RidsNrrPMClinton Resource; RidsNrrDirslrib Resource; Pederson, Cynthia; Orth, Steven; Heck, Jared; Barker, Allan; Ariano, Carole; Linn, Linda; DRSIII; DRPIII; Buckley, Patricia; Tomczak, Tammy; McHale, John
Subject:
Ltr 5/4/11 OL Initial Exam Confirmation Attachments: CLI 050411 DRS OL Initial Exam Confirmation.docx The subject document has been completed and has been submitted to DPe to be declared in ADAMS. A Word version of the document has been attached and the document has been assigned Accession
- ML111260610 Justine. t,BtJ1'ZQ.
Division Administrative Assistant(TL} DRS, Region III 630-829-9702 1 UNITED NUCLEAR REGULATORY REGION 2443 WARRENVILLE ROAD, SUITE LISLE, IL February 19, 2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555 CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS
Dear Mr. Pardee:
In a letter dated August 13, 2009 (RS-09-109), your staff responded to Regulatory Issue Summary (RIS) 2009-11, and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated March 19, 2009 (U-603882), Clinton Power Station requested an examination be administered in October or November 2010 that was not included in your RIS response letter. That examination has been added to your examination schedule. In a separate letter dated November 18, 2009 (U-603924), Clinton Power Station requested we not schedule the examination requested in December 2011 per your letter, but retain an August 2011 examination scheduled from your response to the 2008 RIS for examination scheduling. In a separate letter dated January 6,2010 (Byron 2010-0003), Byron Station requested we change the dates of their examinations proposed for 2011, 2012, and 2013 to other dates. We were unable to accommodate the April 2013 examination requested for Quad Cities Nuclear Power Station. It is currently listed as 'To Be Determined" as we are currently negotiating a mutually acceptable examination date with Quad Cities training department personnel. This letter confirms scheduling of the requested examinations at the Region III Exelon power plants and incorporates the changes requested by Clinton Power Station and Byron Station. We have tentatively scheduled the requested examinations to occur as follows: I Station I 2010 014----_. - 1** 2 N/R feraidwood N/R I . Byron 9/27 I N/R 01/16 0 1/27 .. 8/19 N/R Clinton N/R 8/22 Dresden 03/08 03/07 ,-3/04 N/R 3105 LaSalle N/R N/R 09113 N/R 09/24 N/R N/R 5/30 I Quad Cities 3/26 TBD L----.. N/R -None Requested TBD -To Be Determined On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station'S training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. C. Pardee We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks. Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations. A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ 1...,;. pardee We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks. Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations. A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; License Nos. NPF-72; Docket Nos. 50-454; License Nos. NPF-37; Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ DISTRIBUTION: See next page DOCUMENT NAME: G:\DRS\Work in Progress\Exelon 021910 DRS OL.doc T' f .o receIVe a Cl!Pl 0 thIs document, indicate in the box "e" = Copy wlo attach/end "En = Copy with attach/end "N" = No C()j))' OFFICE RIII:DRS I RIII:DRS I RIII:DRS I I NAME JKweiser:co DMcNeil HPeterson DATE 01125/10 02117/10 02/19/10 OFFICIAL RECORD COpy letter to Mr. Charles G. Pardee from Mr. Hironori Peterson, dated February 19, 2010. CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS DISTRIBUTION: RidsNrrDorlLpl3-2 Resource Susan Bagley RidsNrrPMBraidwood Resource RidsNrrPMByron Resource RidsNrrPMClinton Resource RidsNrrPMDresden Resource RidsNrrPMLaSalle RidsNrrPMQuad Cities RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Carole Ariano linda linn Patricia Buckley Tammy Tomczak Nuclear Clinton Power Station 8401 Power Road Clinton,IL 61727-9351 November 18, Regional Administrator U. S. Nuclear Regulatory 2443 Warrenville Road, Suite Lisle, Illinois Attention: Ms. Janet Clinton Power Station, Unit Facility Operating License No. NRC Docket No.
Subject:
Clinton Power Station CY 2011 Operator License Exam Schedule
References:
- 1) Letter RS-08-092, "Response to NRC Regulatory Issue Summary Preparation and Scheduling of Operator Licensing Examinations," July 22, 2) Letter U-603882, "Request for Additional Initial Operator License Training Date," dated March 19, 2009 3) Letter RS-09-109, "Response to NRC Regulatory Issue Summary Preparation and Scheduling of Operator Licensing Examinations," August 13, Clinton Power Station previously requested a primary operator license CY 2011 exam schedule date of December 5, 2011, in References 2 and 3. The station has reconsidered operator resource needs, and is now requesting that the 2011 exam date remain at August 22, 2011, as originally requested in Reference
- 1. The number of candidates remains the same as reported in the response to Regulatory Issue Summary (RIS) 2009-011.
Should you have any questions related to this information, please contact Mr. Steve Gackstetter at (217) 937-4000. RuL_ Mark E. Kanavos Plant Manager Clinton Power Station NOV 2 4 2009 Exelon Generation Company, LLC Clinton Power Station U-603924 Page 2 of 2 EET/blf Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector -Clinton Power Station -- E,elan Nudear Nuclear 4300 Wmfield Road WarrenviHe, ll60 5S5 August 13,2009 U. S. Nuclear Regulatory ATTN: Document Control Washington, DC Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating license Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50454 and STN 50-455 Clinton Power Station, Unit 1 P. V ;l.. () J i Facility Operating License No. NPF-62 NRC Docket No. 50461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating license Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating license Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 limerick Generating Station, Units 1 and 2 Facility Operating license Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC pocket No. 50-219 Peach Bottom Atomic Power Station. Units 2 and 3 Renewed Facility Operating license Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NBC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 AUG August 13, 2009 U. S. Nuclear Regulatory Commission Page 2 Response to NRC Regulatory Issue Summary 2009*11, "Preparation and Scheduling of Operator licensing Examinations" NRC Regulatory Issue Summary 2009*11, "Preparation and Scheduling of Operator licensing Examinations," dated July 16, 2009 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2010 through 2013, and the number of candidates requiring Generic Fundamentals Examinations (GFEs) for calendar years 2010 and 2011. Attachments 1 through 10 provide responses to RIS 2009*11 for the Exelon Generation Company, LLC (EGC) plants identified above. The requested information for each facility is provided on a separate NRC Form 536. In calendar year 2010, eight candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment
- 6. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 6 for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate.
There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. Je Man ger* Licensing and Regulatory Affairs Attachment 1 -Completed NRC Form 536 for Braidwood Station Attachment 2
- Completed NRC Form 536 for Byron Station Attachment 3 -Completed NRC Form 536 for Clinton Power Station Attachment 4 -Completed NRC Form 536 for Dresden Nuclear Power Station Attachment 5 -Completed NRC Form 536 for LaSalle County Station Attachment 6 -Completed NRC Form 536 for Limerick Generating Station Attachment 7 -Completed NRC Form 536 for Oyster Creek Nuclear Generating Station Attachment 8 -Completed NRC Form 536 for Peach Bottom Atomic Power Station Attachment 9
- Completed NRC Form 536 for Quad Cities Nuclear Power Station Attachment 10 -Completed NRC Form 536 for Three Mile Island Nuclear Station* Unit 1 Attachment 1 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..(J131 EXPIRES: 10131/2011 (10*2008)
Estimated burden par to comply with this voluntary Information collection request: 1 hour. his information collection is used to plan budget and resources for operator examinations. Send comments burde OPERATOR LICENSING estimate to the Records and FOIAlPrlllacy Sefllices Branch -5 F 3), U.S. Nuclaar Commission. Washington. DC 20555-000
- or b7.: interna EXAMINATION DATA e-mail 10 in ocoliects@nrC'gov, and to the Desk Offlcer, Office of In ormation and Regulatory Affairs, NE 8-10202, (3150-0131), Office of Management and Budget. WaShington, DC 20503. II a means used to impose an information collection does not display a currently valid OMS conlToi number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collectIOn.
n s t FACILITY Braidwood Station, Units 1 and Z Facility Operating License Nos. NPF-72 and NPF-77 NRC Oocket Nos. STN S()..456 and STN 50-457 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 --Cy 2011 --Cy 2012 --Cy 2013 -ESTIMATED NUMBER OF LlCENSEE*PREPARED EXAMINATIONS 0 1 0 1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011 -CyZOl2Cy20JJ-NUMBER OF REACTOR OPERATORS 0 7 0 5 NUMBER OF SENtOR REACTOR OPERATORS -INSTANT 0 12 0 12 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS -LlMtTED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 0612012011 N/A 03/24/2013 ALTERNATE DATE N/A 07/11/2011 N/A 04/08/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDtDATES
- u 0 0 0 0 0 0 19 NRC FORM 536 (10-2008)
PRINTED ON RECYCLED PAPER Attachment 2 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED SY OMS: NO, 315()..0131 EXPIRES: 1013112011 110-2008) Estimated burden per to comply with this voluntary Informatio collection request: 1 hour. his information collection is used to plan budget and resources for operator examinations. Send comments n1r.rding burde OPERA TOR LICENSING estimate to the Records and FOIAIPrivaoy Services Branch *5 F 3). U.S Nuclear R::\lulatory Commission. Washington. DC 20555-000 ,or br, inleme EXAMINATION DATA e*mail to in OCOllec!s@nrc,gov. and to the Desk Officer. Office of In ormation and Regulatory Affairs, NE S*10202. (3150-0131), Office of Management an Budget, Washlng!on, DC 20503. If a means used to impose an informatio collection does not display a currently valid OMS control number. the NRC may not conduct or sponsor. and a person Is not required to respond to, the information collection, n d n s . t n FACILITY Byron Station, Units t and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010-Cy 2011-Cy 2012 -CY 2013 -ESTIMATED NUMBER OF L1CENSEE*PREPARED EXAMINATIONS 1 1 I 1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY2011-CY 2012 -Cy2013-NUMBER OF REACTOR OPERATORS 8 0 0 6 NUMBER OF SENIOR REACTOR OPERATORS
- INSTANT 8 6 6 6 NUMBER OF SENIOR REACTOR OPERATORS*
UPGRADE 1 1 0 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 09/27/2010 09/2612011 09/24/2012 09/23/2013 ALTERNATE DATE N/A 10/0312011 10/0112012 10/07/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 6 0 0 0 6 0 0 NRC fORM 536 (10-2008) PRIN1ED ON RECYCLED PAPER Attachment 3 Response to RIS 2009-11 Page 1 of 1 NRC FORM 531 u.s. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS; NO. 3150-0131 EXPtRES: 08131/200 ("2005) e.lImaled burden n' 10 comply with ifill voluntary Informal ion colle*" request; hour. Ia IIlfOtImtIIon col!edlon ill ulMld to plM and r8$OUrOH for operator elC8minalion.. Send _18 burGe OPERATOR LICENSING .aIlm** to 1M Rec:ordtJ and FOINPrivllCY Ser\IIceI Branch *5 F 3). U.NuclMt Comml..ion. W.uhlngton. OC 20555-000
- or :llntemet EXAMINATION DATA a.ma. to In and to the Oalk Olllo:er.
0ftIce 011 ann.1io and Regul: All'an. Nt: .10202. (315().{J131). 0IIIce of ManaQ8lTl8tlt an Budget. Wuh gton. OC 20503. If a maa". ulMld to IrI'Ij)OIIe an informatio collection doe. nol dllplay a <lIImlnlly valid OMS COIlIlol number. the NRC ma not conduct and a peraon I. nol requited to r **pond 10. th Information col n. S. 8 rI n d n y e FACIUTY Clinton Power Station, Unit 1 Facility Operating Ucense No. NPF-62 NRC Docket No. 50-461 NRCREQION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2010-CY2011-CY2012-CY2013ESTIMATED NUMBER OF LICENsee-PREPARED EXAMINATIONS 1 1 0 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INrrlAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2010CY2011CY2012-CY2013-NUMBER OF REACTOR OPERATORS 6 . 8 0 6 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS* UMfTED 0 0 0 0 PROPOSED DATES PRIMARY DATE 1012512010 12/0512011 N/A 08119/2013 ALTERNATE DATE 1110112010 12/11/2011 N/A 08126/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINAnON (GFE) SCHEDULE PROPOSED NUMBER CY 2010 -CY 2011MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBEfl DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 9 0 0 0 0 0 I'I'tINTED ON RECYCl.EO PAPER Attachment 4 Response to RIS 2009*11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (1 (j..2008) OPERA TOR LICENSING EXAMINATION DATA APPROVED SY OMS: NO. 3150'()131 EXPIRES: 1013112011 Estimated burden per to comply with tllis voluntary information collection request: 1 hour. his information collection is used to plan budget and resources for operator examinations. Send comments burde estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S. Nuclear Commission, WaShington. DC 20555-000 ,or b" Interne e-mail to in OCOllects@nrc'gov. and 10 the Desk Officer. Office of in ormation and Regulatory Affairs, NE B*10202. (3150'()131). Ollice of Management an Budget. Washmgton, DC 20503. if a means used to impose an information collection does not display a currentry valid OMB contro! number. the NRC mey not conduct or sponsor. and a person Is not required to respond to. the information collection. n d s t FACILITY Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50*237 and 50-249 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2010 --Cy 21)11--Cy 2012 --Cy 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS I I 1 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 -Cy 2011 -CY 2012 -CY2013-NUMBER OF REACTOR OPERATORS 2 3 3 3 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 6 9 9 9 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE I 1 1 I NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 03108/2010 03/07/2011 03/0512012 03f04/2013 ALTERNATE DATE 04/05/2010 04104/2011 0410212012 04101/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 12 0 0 0 12 NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Attachment 5 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10*2008) Estimated burden per to comply with this voluntary inlormation collection request 1 hour. his Information collection is used to plan budgets and resources for operator examinations. Send comments burden OPERA TOR LICENSING estimate 10 the Records and FOIAlPrlvacy Services Branch -5 F 3), U.S. Nuclear Com . .. 5*000 ,or by' inlernet EXAMINATION DATA e-mail to OfflC9r. Office of In ormation and Reg 02, (3150-(131), Office of Management and Budget, Wash ogton. DC 20503. If a means uS9d to impose an information collection does not display a currently valid OMS control number, the NRC mey not conduct or sponsor. and a person is not required to respond to, Ihe Information collecllon. fACILITY NRC FlEGION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-l1 and NPF-18 III NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 20t2 CY 2013 ----ESTIMATED NUMBER OF 1 0 1 0 LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0 0 0 NRC*PREPARED 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2010 CY2011 CY2012 CY2013----NUMBER OF REACTOR 3 OPERATORS 0 6 0 NUMBER OF SENIOR REACTOR 11 0 8 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 09/14/2010 N/A 09/24/2012 N/A ALTERNATE DATE 09/2112010 N/A 10/0t/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF I) 0 0 0 0 14 0 0 CANDIDATES NRC FORM 536 (1()'2008) PRINTED ON RECYCLED PAPER Attachment 6 Response to RIS 2009-11 Page 1 of 2 jNR(:FOfUI 531 u.s. NUCU!AR REGULATORY CO**IION APPROIIEO BY cae NO. exPIRES: 1013112011 10.2001) &UrnaIIId blwden t: to 'MIll !ilia wlUIIIMW Infonnado ccIIedIDn rIIqLIIIIII: houI. Infi:IrmIIIIIIn CIGIIec:Ion It IIIIMf to .... fat IIf*IIIDr .....Il0l.. Send OPERATOR LICENSING ......... 10 .... AtcionII .... s.mc. a..nc:n .a F ), u.s.. .<<=.=EXAMINATION DATA -.II to ..... III .... DellI 0IIIcIIr. 0III0e all .... OIIotalMIII=:. ...201503.
- _ uMd III rn..-till Ib ooIIii::IIOn do-. nat iiIijji8,
- cumIIIIIy YIIId a.e 1U1IbIr.....HAC III8 not 8nd
- IHIrtOn Ie not requlNd to raapond to. 11 InbmMlon
- ol Y M n . . f/IIDUrY Umerlck Geaeradill Statio .. U.lta 1 ad 1 Facility Oper_dIIl LkerlseN-.
NPF-39'" NPF-85 NRC Docket Net. 50-35% ad 5O-35l HRCMGIOH I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CylOI.-Cy2.11-CylOll-Cy2.13-ESTIMATED NUMBER OF UCENSEE-PREPARED EXAMINATIONS 1 0 I 0 ESTIMATED NUMBER OF NRC-PREPAAED EXAMINATIONS 0 * *
- B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER ev 201.-Cy20U-ev 1012-Cy2013-NUMBER OF REACTOR OPERATORS ,
- 11 0 NUMBER OF SENIOR REACTOR OPERATORS
- INSTANT 7 0 5 0 NUMBER OF SENIOR REACTOR OPERATORS*
UPGRADE 5 0 %
- NUMBER OF SENIOR REACTOR OPERATORS*
LlMrTED
- 0 , 0 PROPOSED DATES PRIMARY DATE 10l04ll01.
N/A 1000lllOIl N/A AI.TERNATE DATE 1811112.1. N/A 89Jl41lOIl N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2011CY 20UMARCH JUNE ISEPTEMBER DECEMBER MARCH JUNE !SEPTEMBER DeCEMBER ESTIMATED NUMBER OF CANDIDATES , , 0 0 0 16 It
- NRC FOI!M _ (1o.:1m1)
Attachment 6 Response to RIS Page 2 of 2 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (10*2005) OPERA TOR LICENSING EXAMINATION DATA APPRoveo BY OMB: NO. 315O.Q131 EXPIRES: 1013112011 Estimated burden per to comply with this voluntary informatio collection request 1 hour. his information collection is used to plan budget and resources for operator examinations. Sand comments burde estimale to the Records and FOIAfPrivacy Services Branch -5 F 3). U.S. Nuclear Commission, Washington, DC 20555*000 , or b, Interne e-mail to in OCOlieCtl!@nrc-g0v, and to the Oesk Officer. Office of tn ormatlon and Regulatory Affairs, NE B*10202, (3150*0131), Office of Management and Budget, WB$htngton. DC 20503. If a means used to Impose an Informaflo collection does not display a currenUy valid OMS control number. the NRC may not conduct or sponsor. and a person is not requited to respond to, the informatlon coliecUon. n n n s t FACll-trY Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-8S NRC Docket Nos. and 50-353 NRC REGION I A. PROPOSED EXAMINA,.ION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 -CY 2012 -CY 2013 -ESTIMATED NUMBER OF LICENSEE*PREPARED EXAMINATIONS 1 0 0 0 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 -CY2011CY 2012 -Cy2013-NUMBER OF REACTOR OPERATORS 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS
- INSTANT 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS*
UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 8 0 0 0 PROPOSED DATES PRIMARY DATE 06/1412010 N/A N/A N/A ALTERNATE DATE 0610712010 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER Cy 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 0 0 0 0 0 NRC FORM 536 (1Cl-2006) PRImED ON RECYCLED PAPER Attachment Response to RIS 2009-11 Page 1 of NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.()131 EXPIRES: 1013112011 (10*20081 Estimated burden per r ... to comply with this voluntary information collection request 1 hour. his information collection is used to plan budgets and resources lor operator examinations. Send comments burden OPERA TOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch *5 F 3), U.S. Nuclear Commission, Washington, DC 20555-000 ,or Internet EXAMINATION DATA e-mail to in ocoliecls@nrc,gov, and to the Oesk Officer, Offie" olIn ormation and Affairs. NE IM0202, (3150'()131), Office of Management and Budget, Wash ngton, DC 20503. if a means used to impose an information collection does nol display a currently valid OMS conlrol number, the NRC may not conduct or and a person Is not required to respond to, the information collect n. FACILITY NRCREQION Oyster Creek Nuclear Generating Station I Renewed Facility OperatiDg License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 Cy 2011 CY 20ll CY 2013 ---ESTIMATED NUMBER OF 1 1 1 0 LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0 0 0 NRC-PREPARED 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY2011 CY2012 CY2013----NUMBER OF REACTOR 6 6 6 0 OPERATORS NUMBER OF SENIOR REACTOR 7 7 8 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2 1 2 0 OPERATORS*UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS -LIMITED PROPOSED DATES PRIMARY DATE 05/17/2010 07lUl2011 05/2812012 N/A ALTERNATE DATE 05/24/2010 0711812011 06/0412012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINA1"ION (GFE) SCHEDULE Cy 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 13 0 0 0 14 0 0 0 CANOl DATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Attachment 8 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150'()131 EXPIRES: 1013112011 (10-2008) Estimaled burdan per to comply with this voluntary information collection request: 1 hour. his Information collection is used to plan budgets and resources for operator examinations. Send comments burden OPERA TOR LICENSING estimate to the Records and F01A1PrlllilCY Services Branch -S F 3). U.S. Nuclear Re ulatory Commission. Washington. DC 20555*000 . or bl: interne EXAMINATION DATA e-mail 10 . re.goll. and to the Desk OffICer, Office of In ormation and Regulato NE 8*10202. (3150.()131). Omce 01 and Budget. Wa C 20503. II a means used to impose an nformatio collection does not display a currently valid OMB controt number. the NRC may not conduct or and a person is not required to respond to. the Information colle on. n t FACILITY Peach Bottom Atom Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 NRC REGION ( A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010-CY 2011 -CY 2012 -CY 2013 -ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0 1 0 I ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INrrlAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 -Cy2011-CY2012Cy2013-NUMBER OF REACTOR OPERATORS 0 6 0 8 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 8 0 10 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 3 0 2 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED
- 0 0 0 PROPOSED DATES PRIMARY DATE
- 01/31/2011 N/A 0211112013 ALTERNATE DATE
- 03/2112011 N/A 02/04/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER Cy 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 0 0 0 18 0 NRC FORM 536 (10-2008)
PRINTED 0+1 RECYCLED PAPER *See Attachment 6 (Limerick Generating Station) for Limited SRO numbers and exam dates Attachment 9 Response to RIS Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED SY OMS: NO. 315Q-{)131 EXPIRES: 1013112011 (10-2008) Estimated burden per to comply wIth this voluntary information collection request: 1 hour. his information collection is llSed to plan budgets and resourCes lor operator examinations. Send comments burden OPERA TOR LICENSING estimate to the Records and FOINPrivacy Services Branch *5 F 3). U.S. Nuclear Ro?,ulalOry Commission. Washington, DC 20555-000 ,or bt: internet EXAMINATION DATA e-mail to in ocollects@nrc'gov, and to Ihe Desk Officer, Office 01 In ormation and Regulatory Allairs, NE B*l0202, (3150-{)131), Office of Management and Budget. Washington, DC 20503. If a means used to Impop an Information collection does 1'101 display a currently valid OMS conlrol number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collecllOn. FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Renewed FaciUty Operating License Nos. DPR*29 and DPR-30 1II NRC Docket Nos. and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2010 Cy 2011 Cy 2012 Cy 2013---ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 Cy201t CY2012 CY2013 ----NUMBER OF REACTOR 0 6 4 3 OPERATORS NUMBER OF SENIOR REACTOR 0 OPERATORS* INSTANT 11 10 10 NUMBER OF SENIOR REACTOR 0 0 1 1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE N/A 05/30/2011 03/12/2012 0411512013 ALTERNATE DATE N/A 06113/2011 03/26/2012 04/2912013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 14 0 0 0 0 CANDIDATES NRC FORM.536 (10-2008) PRINTEO ON RECYCLED PAPER Attachment 10 Response to RIS 2009-11 Page 1 of 1 NRC FORM S3I u.s. NUCLEAR REGULATORY COMMISSION APPROVEO BY OMB: NO. 31150.0131 EXPIRES: 1013112011 ('(1.2008) E.llmal.ct burnan per 10 comply with thle volunt.ry inform.tlon co/IaCIion Alquest 1 hour. information colectlon it ulMld to pl.ln budgeta and _I0Il1 for op....tor examination.. Send commentll bll'den OPERATOR LICENSING .IIImalllo the Recorda and FOlAlPrivacy Branch *5 F 3). U.S. Nuclur R:tory CammllUion, WultlngIDn, DC 20fi65.000 ,Of Internet EXAMINATION DATA IH1'IIlt 10 I and 10 the 0.. 0_" omce of 1 allen and ReQuta:y, Affalrl 6 NE 10202, (31150.0131), Olb of and Sudgtt, Wa ngton, C 20503. If a ....ne uNd to Irnpote an ttion coIleCtlon doee not dllpfay a CutnlflU,. VIIIid 0M8 confnll number, the NRC me,. not conduct and a paNlcn ia not raqulrad ta r..pond ta. thl Informallon col . FACIUlY NRC REGION Three Mne Island Nuclear Statloll, Unit 1 I FacUlty Operadlll License 110. DPR-50 NRC Docket No. 50..189 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER cy 2010 Cy lOll Cy2011 cy 2013----ESTIMATED NUMBER OF J 1 0 1 I.ICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0 0 0 NRC-PREPARED 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CylOll CyZOll CylO13----NUMBER OF REACTOR 1 10 0 9 OPERATORS NUMBER OF SENIOR REACTOR .' 10 0 1 8 OPERATORS
- INSTANT NUMBER OF SENfOR REACTOR 0 I 0 1 OPERATORS
-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE OllllllOtO 0911112011 N/A 09/0911013 At TERNATE DATE 0112812010 09/1911011 N/A 09/1612013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 1011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ISEPTEMBER DECEMBER ESTIMATED 21 0 NUMBER OF 0 0 18 0 0 0 CANDIDATES NRC FORM 538 (lMOOt1) PRINTED QK RECYCLED P""ER Nuclear Clinton Power Station 8401 Power Road Clinton,lL 61727-9351 U-603882 March 19, 2009 Regional Administrator U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Clinton Power Station, Unit Facility Operating License No. NRC Docket No.
Subject:
Request for Additional Initial Operator License Training Date
Reference:
Response to NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations" The referenced letter provided a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2009 through 2012. Clinton Power Station is requesting an additional class for 6 Reactor Operators be added with an exam date late in 2010. An updated NRC form 536 is included. Should you have any questions related to this information, please contact Mr. Mike McCormic at (217) 937-2526 . . A. :iarney Site Vice President Clinton Power Station EET/bif Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector -Clinton Power Station MAR 262009 NRC FORM 536 U.S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB; NO. 3150-0131 EXPIRES; 08/3112008 (8-2005) Estimated burden per to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets OPERA TOR LICENSING and resources for operator examinations. Send comments rerf'rdlng burden estimate to the Records and FOIAIPrivacy Services Branch \ *5 F53). U.S. Nuclear Commission, Washington, DC 20555'()()O , Of bllntemet EXAMINATION DATA e-mail to in OColiects@nrc-g0v, and to the Desk Officer. Office of In ormation and Regulatory Affairs. NE 8-10202, (3150-0131). Office of Management and Budget, Washington, DC 20503. If a means used to impose an information colledlon does no! display a currently valid OMB control number, the NRC may not conduct or sponsor. and a person Is not required to respond to, the information collection. FACIUTV NRC REGION Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 III NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY 2010 CY2011 CY2012ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY 2010 CY 2011 CY2012NUMBER OF REACTOR 6 OPERATORS 6 6 0 NUMBER OF SENIOR REACTOR 6 0 4 0 OPERATORS INSTANT NUMBER OF SENIOR REACTOR 2 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS -LIMITED PROPOSED DATES PRIMARY DATE 08/24/2009 10/25/2010 11/28/2011 N/A ALTERNATE DATE 08/17/2009 11/01/2010 12/05/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2009 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 0 10 0 NUMBER OF 0 0 6 0 CANDIDATES PRINTED ON RECVCLED PAPER "IRe FORM 536 (8-2005) October 7, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL 60555 CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS
Dear Mr. Pardee:
In a letter dated July 22, 2008, (RS-08-092) your staff responded to Regulatory Issue Summary 2008-16 and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated July 11, 2008, (KKM-08-001) the Quad Cities Nuclear Power Station Training Manager requested a change to the start date of the Station's 2009 examination. This letter confirms scheduling of the requested examinations at the Region III power plants and the change requested for the Quad Cities Nuclear Power Station 2009 examination. We have tentatively scheduled the requested examinations to occur as follows: Station 2009 2010 2011 2012 Braidwood 10105 NIR 6/20 NIR Byron NIR I 9/27 9/12 9/10 Clinton 8/24 I N/R 8/22 NIR I Dresden 03/09 i 03/08 3107 3/05 LaSalle N/R 09/13 N/R 9/17 Quad Cities 11/30 N/R 5/30 3/26 N/R -None Requested On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station's training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. Because the examinations have greater than nine anticipated applicants, each examination is scheduled for two weeks. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations. C. A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronica"y for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 license Nos. NPF-72; NPF-77 Site Vice President -Braidwood Station Plant Manager -Braidwood Station Regulatory Assurance Manager -Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President -Midwest Operations Senior Vice President -Operations Support Vice President -licensing and Regulatory Affairs Director -licenSing and Regulatory Affairs Manager licensing -Braidwood, Byron and LaSa"e Associate General Counsel Document Control Desk -licensing Assistant Attorney General J. Klinger, State liaison Officer, Illinois Emergency Management Chairman, Illinois Commerce Site Training Director -Braidwood C. A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.90v/reading-rm/adams.html. Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Site Vice President -Braidwood Station Plant Manager -Braidwood Station Regulatory Assurance Manager -Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President -Midwest Operations Senior Vice President -Operations Support Vice President -Licensing and Regulatory Affairs Director -Licensing and Regulatory Affairs Manager Licensing -Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk -Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Chairman, Illinois Commerce Site Training Director -Braidwood See Attached Distributions DOCUMENT NAME: G:\DRS\WORK IN PROGRESS\EXELON 100708 DRS OL.DOC o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive T' r b' d . d" "C" C hi I . h hi I D receIVe a eOPl 0 t IS Deument, ID lcate ID tbe box . = OPY wlo attac enc nE" =Copy WIt attac enc "N" = No copy OFFICE RIII:DRS I RIII:DRS 1 RIII:DRS J I NAME JKweiser:co DMcNeil HPeterson DATE 10/02/08 10/02/08 10/07/08 OFFICIAL RECORD C. Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Site Vice President -Byron Station Plant Manager -Byron Station Regulatory Assurance Manager -Byron Station P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission Site Training Director -Byron Station B. Quigley, Byron Station Docket No. 50-461 License No. NPF-62 Site Vice President -Clinton Power Station Plant Manager -Clinton Power Station Regulatory Assurance Manager -Clinton Power Station Manager Licensing -Clinton, Dresden and Quad Cities Site Training Director -Clinton Power Station Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Site Vice President -Dresden Nuclear Power Station Plant Manager -Dresden Nuclear Power Station Regulatory Assurance Manager -Dresden Nuclear Power Station Site Training Director -Dresden Nuclear Power Station Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Site Vice President -LaSalle County Station Plant Manager -LaSalle County Station Regulatory Assurance Manager -LaSalle County Station Site Training Director -LaSalle County Station Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 Site Vice President -Quad Cities Nuclear Power Station Plant Manager -Quad Cities Nuclear Power Station Regulatory Assurance Manager Quad Cities Nuclear Power Vice President -Law and Regulatory D. Tubbs, Manager of Associate General M. Rasmusson, State Liaison Officer, State of Iowa Chief Radiological Emergency Preparedness Section, Dept. of Homeland Security Site Training Director -Quad Cities Nuclear Power Station Letter to Charles G. Pardee from Hironori Peterson dated October 7,2008 CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS DISTRIBUTION: Russell Gibbs Tamara Bloomer Meghan Joel Wiebe Stephen Sands Christopher Gratton RidsNrrDirslrib Resource Mark Satorius Kenneth OBrien Jared Heck Roland Lickus Carole Ariano Linda Linn Patricia Buckley DRPIII DRSIII Patricia Buckley Tammy Tomczak Janet Kweiser From: Carmen Olteanu Sent: Tuesday. October 21. 2008 11 :22 AM To: Russell Gibbs; Tamara Bloomer; Meghan Thorpe-Kavanaugh; Joel Wiebe; Stephen Sands; Christopher Gratton; RidsNrrDirsirib Resource; Mark Satorius; Kenneth OBrien; Jared Heck; Carole Ariano; Linda Linn; Patricia Buckley; DRPIII; DRSIII; Patricia Buckley; Tammy Tomczak
Subject:
Exelon Letter Re Confirmation of Initial Exam Attachments: Exelon 100708 DRS OLdoc The subject document has been completed and has been submitted to DPe to be declared in ADAMS. A Word copy of the document has been attached and the document has been assigned Accession
- ML082880559.
1
An Exelon Company www.exeloncorp.com AmerGcn Energy Company, lLC Nuclear 4300 W'nfield Road Exelon Warrenville. Il 4300 Wmfleld Warrenville. IL July U. S. Nuclear Regulatory ATTN: Document Control Washington, DC Braidwood Station, Units 1 and Facility Operating License Nos. NPF-72 and NRC Docket Nos. STN 50-456 and STN Byron Station, Units 1 and Facility Operating License Nos. NPF-37 and NRC Docket Nos. STN 50-454 and STN Clinton Power Station, Unit Facility Operating License No. NBC Docket No. Dresden Nuclear Power Station, Units 2 and Renewed Facility Operating License Nos. DPR*19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 . LaSalle County Station, Units 1 and Facility Operating License Nos. NPF-11 and NRC Docket Nos. 50-373 and Limerick Generating Station, Units 1 and Facility Operating License Nos. NPF*39 and NRC Docket Nos. 50-352 and Oyster Creek Nuclear Generating Facility Operating License No. NRC Docket No. Peach Bottom Atomic Power Station, Units 2 and Renewed Facility Operating License Nos. DPR*44 and NRC Docket Nos. SO-2n and July 22, 2008 U. S. Nuclear Regulatory Page Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit Facility Operating License No. NRC Docket No. Response to NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations" NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations," dated June 27, 2008 The referenced Regulatory Issue Summary requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2009 through 2012, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2009 and 2010. Attachments 1 through 10 provide responses for the Exelon Generation Company, LLC and AmerGen Energy Company, LLC plants identified above. The requested information for each facility is provided on a separate NRC Form 536. In calendar year 2009, six candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment
- 8. The schedule for the indicated examination is as follows: the written examination and a portion of the operating . examination will be given at Limerick Generating Station (LGS): the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments.
the examination scheduling information is provided on Attachment 8 for PBAPS. Attachment 6 for LGS references Attachment 8 where appropriate. There are no regulatory commitments contatned within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. Respectfully, Darin M. Director -Licensing and Regulatory July 22, 2008 U. S. Nuclear Regulatory Commission Page 3 Attachment 1 -Completed NRC Form 536 for Braidwood Station Attachment 2 -Completed NRC Form 536 for Byron Station Attachment 3 -Completed NRC Form 536 for Clinton Power Station Attachment 4 -Completed NRC Form 536 for Dresden Nuclear Power Station Attachment 5 -Completed NRC Form 536 for laSalle County Station Attachment 6 -Completed NRC Form 536 for Limerick Generating Station Attachment 7 -Completed NRC Form 536 for Oyster Creek Nuclear Generating Station Attachment 8 -Completed NRC Form 536 for Peach Bottom Atomic Power Station Attachment 9 -Completed NRC Form 536 for Quad Cities Nuclear Power Station Attachment 10 -Completed NRC Form 536 for Three Mile Island Nuclear Station -Unit 1 Response to RIS 2008-16 Attachment 1 Page 1 of 1 NRCFORMSJ6 II.S NUCLEAR RE(WLATORY COMMISSION 11I-200s) OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. .1 1 S()*tllJ I os/J Estimated burden pt'r 1il l."\,lmply with rhi." \'(llulltary mthmuUM:m
- .
- uUel.1iun 1 hour. This infmmatl(lQ IS to.pl.l0 Nudear Ne@ublm)'
WawtngwIl., DC (If Internet tn IRttl\:ullel.'b@nn""f))v.and to [Itt De-.k OfllCt'"(, of In ,tmatlln Jl1d Reg"')' NE <3150-0131
- i. OtT",. "rM.na¥<ment.OO Budget..
DC 2050J, If 3 me"I1." In Impnr.e an inthrmatKtn \xllfei.:tKJA not a I.'urrtnlly valid OMB c<mtrllt number. the NRC may nut I.'nnduet or "pum,ur**md a ptrM.HI is nut reqUlf't"d ttl 1't!'!'{Xlnd to. tht FACILITY Braidwood Station, Units 1 and 2 Facility Operating license Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CYgQQ.a CY 2010 CY2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 0 1 0 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY 2011 CYgQ1g NUMBER OF REACTOR OPERATORS 1 0 7 0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 12 0 12 0 NUMBER OF SENIOR REAc..1'OR OPERATORS-UPGRADE 1 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/05/2009 NlA 612012011 NlA ALTERNATE DATE 10/19/2009 NlA 711112011 NlA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY2oo9 CY 2010 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 0 21 0 0 0 Response to RIS 2008*16 Attachment 2 Page 1 of 1 NRC FORM SJ4 u.s NUCLEAR REGULA TORY COMMISSION iM*ZOOS) OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMS: NO. 3151Hl1;l1 EXPIRES: !l!VJlllfXlIi Ehtimated burden l\) ,,'urnp',)" wIth In('IOnalitm cilJlet.'tion rr<juef.l: 1 hour. Thl!' mlmmatton (OUtt1101'1 is used to plan NlJdear R . . I km _. iJISiJ.iJ13I). Oftk. of Managemenl and Budget. DC' If a mean!' u-.ed to an InformafJon collectiun dt\eS not a cum:ntly \talk! OM.B cnntml number, the NRC may a person is no! requIred to respond to. the FACILITY Byron Station, Units 1 and 2 Facility Operating License Nos. NPF*37 and NPF-66 NRC Docket Nos. STN 50*454 and STN 50-455 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDllLE PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0 1 1 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY 2010 CY2011 CY2012 NUMBER OF REACTOR OPERATORS 0 9 0 7 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0 8 12 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 1 1 2 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NlA 9/27/2010 9/1212011 9/10/2012 ALTERNATE DATE NlA 10/0412010 9/2612011 9/24/2012 C. PROPOSED GENERIC FUNDAMENTALS EXMfiNATION (GFE) SCHEDULE PROPOSED NUMBER CY2009 CY2010 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 17 0 0 0 12 0 0 Response to RIS 2008-16 Attachment 3 Page 1 of 1 NRC fOR.1I1 U.S NUCLf-AR RE()ULIITORV COMMISSION APPROVED 8Y OMB: NO. JISfl.0131 EXP!RES: O1!l3112(1011 ,8*20051 E-.tim31(d t1urden per re<ipHtse '0 (ompl)' with this vt1kJntary information \'"ollt'ctlOn feqtrest: I llJur. Thil'! ('lIl1et'liUfll:; hlJwan budgets OPERATOR LICENSING Nodeolf CHmml;'i.sinn. OC ':!055S*000J. or bl EXAMINATION DATA ttl in lcolic.cts@nn:'l)lV. JJld ttl the Offk."e of tn OrmalKlt'l and Regulatllry Alf;tir<. NE 8*10202. (3150*1H31). Ollieo,,1 Management and Budget, Washmgtnn. OC If a (l'ttans. to Impose .an infotI'Nt
- .lft I,.'OllrctKIn not dihplay d VJhd OMS Cmll!H; number.!he NRC may !It,Il'tmduct or 3 person not requIred It)
In. the mfurmaljon FACILITY NRC REGION Clinton Power Station, Unit 1 III Facility Operating license No. NPF-62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CYgQll CY2012 ESTIMAlED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC* PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo9 CY2010 CY2011 CY2012 NUMBER OF REACTOR 6 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR 6 0 3 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2 0 3 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 8/24/2009 NlA 8/2212011 NlA ALTERNATE DATE 8/17/2009 NlA 8/29/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY2009 CY2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEf'T'EMBER DECEMBER ESTIMAlED 0 0 0 0 0 9 0 0 NUMBER OF CANDIDATES Response to RIS 2006-16 Attachment 4 Page 1 of 1 IIPPROVED BY 01.18: NO. JISO-fi131 EXPIRES: Olil3I I::WII NR(: FORM 5.16 u.s NUCLEAR REGtJLATORY COMMISSION t8*100!H E1>Clmated burden per re"piJ1l'\e t\) ,,:'ump'y with this intbrmiltifln ,nlle\.'tKm reque'-t: 1 htlur. This i.nk)nnatlnn u..t'd h>J,lao OPERATOR LICENSING :-.Judear -. ,.1' by mtt'f1,tet EXAMINATION DATA tHllal) ttl TIt:'er. Otlke tit Intormaunn "n" Rtgl .(3150-1)131;, Olliee or and DC ::0503. If J rne;u.'b. used to an mtbrtnatlun t:ollection doe:r. nf)! a ,urrently valid OMS I.:Hntrol number. the NRC may nut COOOtKIOf ,aoo a person 1-" Ilt)t required 10 respond 10. the infnrmatlOn 1,.'\,n(I,.'lIOO. FACILITY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 III Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50*237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 ESTIMATED NUMBER Of LICENSEE-PREPARED EXAMINATIONS 1 1 1 1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 NUMBER OF REACTOR OPERATORS 6 4 4 4 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 4 10 8 8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 1 1 1 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 3/09/2009 310812010 3/07/2011 310512012 ALTERNATE DATE 4/06/2009 4/05/2010 4/04/2011 4/0212012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER Cy2009 CY2010 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 12 0 0 0 14 0 Response to RIS 2008-16 A"achment 5 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATOR\, COMMISSION APPROVED BY OMB: NO. lJ51)*()131 EXPIRES: OIV311::tKl8 ,lI-lfHlSI r:..'lim,l[ed burden per re:-ponse 1,0 \,'umply with Ihi... voluntary infurmation I.:OUa11Vn reque\l: 1 hour, This l.nh1fTt1a!ton usfi1 to plan bud}!tt!i OPERATOR LICENSING Hi-1W')' OlmmisSlon. EXAADNATION DATA 2, ()15().OIll), OIl",. of M0""G<menl aOO me..ns io ,U} infomlatKJn CllU('\.'t K," dl.le\ nnl di:\play a t:urrently. \.. OM8 c'."umml numbt"r, the NRC may not l'Onduct ur spom.nr. Jnd a person is nt)t required fO respond (0, lhe lnformatftm (0I1cI.1ion. NRC REGION LaSalle County Station, Units 1 and 2 III Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED l'I'UMBER CY2009 CY2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE*PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY 2010 CY2011 cy2012 NUMBER OF REACTOR 0 4 0 4 OPERATORS NUMBER OF SENIOR REACTOR 0 8 0 8 OPERA TORS*INST ANT NUMBER OF SENIOR REACTOR 0 2 0 2 OPERATORS*UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE NlA 9/14/2010 NlA 9/1812012 ALTERNATE DATE NlA 9/21/2010 NlA 9/25/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED cv2009 Cy 2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 12 0 0 0 0 0 0 NUMBER OF CANDIDATES Response to RIS 2008-16 Attachment 6 Page 1 of 1 APPROVED BY OMS: NO. 3 15il-1lI3 I EXPIRES: NRC FORM 536 U,S NUCLEAR REGl:LATOR't' COMMISSION .M-ZOOSl Eiltimated bordtn ptr re!iXl!tsc t.il Cl}mply with fhi', \I(tluntalj' inftlfmal)On ..1)11t\.1I:OR request: I huur, This mltlfmatKln rs-used in pla1t budgets OPERATOR LICENSING Regulatory Ct}mmis!>.inn. DC Of bl inlemet EXAMINATION DATA e-m;ut III
- in<! tlJ the Offi\:er.
Otflt:e oi In nflTUlt.iun and Aff...... NE 8-)0101. /.lI50-IlIJll. Olr",e "r M.n.gemel1l.oo DC :!()SOJ, If a usro: UJ an mformahnn I.:(lllet:uun ROC display.a currently VJl1d OMS I.'onirol number. lhe NRC' m.;ay nm l'tHK'1UCt or and a perN.Hl is nOI requIred to J"el'ptJoo fll, the inrormiltl(lIt t.'1.)lleclion. FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 , Facility Operating License Nos. NPF*39 and NPF*85 NRC Docket Nos. 50-352 and 5()"353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CYgQ1Q CY2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED .. 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CYgQQ2 CY2010 CY2011 CY 2012 NUMBER OF REACTOR 0 6 0 4 OPERATORS NUMBER OF SENIOR REACTOR 0 10 0 6 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 2 0 3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR .. 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE .. 10/04/2010 N/A 10/0812012 ALTERNATE DATE 1< 10/18/2010 NlA 10/15/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED cv2009 CV2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 16 0 NUM8EROF 0 0 0 0 0 CA\lDIDATES
- See Attachment 8 (Peach Bottom AtomiC Power Station) for LSRO numbers and exam dates Response to RIS 2008-16 Attachment 7 Page 1 of 1 NRC FORMSJ6 V.s NllClEAR REGULATORY COMMISSION APPROVED BY OMS; NO. J l'O-l11J1 EXPIRES; OHIo
.!I-.lOI151 burdtn per 101'umply with Ih-h Vtll':lntary rol)ecllon request; I tklUf. Thi:i inhlOoatttm cnUection to.plan budgeTS: and reS4IUJ\'-el> for operator .. Send ,,'\'mment!'> OPERATOR LICENSING esflmatt tv the and F9tAIPri\'ocy Ser.... ke' Branch T*.s J)*.u,s, EXAMINATION DATA IOn I. Off"," of MfImcnt and Budget. WIL\hmgh'm. IX: 10503. If a. meanl'l to an inliltmation ",JIec"," d\>....1t di'l'lay a (utremly valid OMB contr(ll number. tho NRC may and 3 nul requlrW 10 fe.';)nnd h). the FACILITY NRC REGION Oyster Creek Nuclear Generating Station , Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CYgQ1Q CY2011 CY2012 NUMBER OF REACTOR 6 6 6 0 OPERATORS NUMBER OF SENIOR REACTOR 10 8 10 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 2 2 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERA TORS* LIMITED PROPOSED DATES PRIMARY DATE 5/04/2009 5/17/2010 5/16/2011 NlA ALTERNATE DATE 5/11/2009 5/24/2010 5/23/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY2009 cr2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 14 0 0 NUMBER OF 16 0 0 0 0 CANDIDATES Response to RIS 2008-16 Attachment 8 Page 1 of 1 NRC FORM SJ6 l:.S NUCLEAR REGULATOR\, APPROVED BY OMB: NO. 3151)*01JI EXPIRES; Oil/31111lO1! IK*Z1J1I51 ,,"rden per l'(lmply with Ihi;\. .'o'"Jumary lntixmJttun cnliet:tlon requt!\!;; I hour, 11m. cl,)ile\.1kIH t;\ ruplan budgeu OPERATOR LICENSING Nudear ReiliJattlryCt)mmis ..itm. Wa.... hinglun. OC' IIf hLltlttmer EXAMINATION DATA e*mail tl) in and 1\) the Offk:'er. Otlke of)n rmatlOn and R<gul..,,'Y Mr.rrs, NE B*101O: I JISO*11I311,Olfoce "f M.nagemelU and Budget. Wil.. DC If a lJleill\.'\ uo;ed 10 Imp.Hc infurmatiun C(lUet..-1tOndoes not a currently valtd OMS t:UI'IUnlllUmmr. the-NRC may or ... 3nd a per",)!) l' f'kH rt!qulrtd to to. the IAtonnatJOn cnllel11()n. FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 I Renewed Facility Operating License Nos. DPR-44 and DPR-S6 NRC Docket Nos. SO-277 and S0-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2OO9 CY2Q1Q CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 and 1 LSRO 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER I CY2oo9 CY2010 CY2011 CY2012 NUMBER OF REACTOR 2 6 0 6 OPERATORS NUMBER OF SENIOR REACTOR 9 10 0 10 OPERATORS*INST ANT NUMBER OF SENIOR REACfOR 1 2 0 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 6 0 0 0 OPERATORS*LlMITED PROPOSED DATES 12107/2009 N/A PRIMARY DATE 1210612010 12103/2012 8/0312009 -lSRO 12114/2009 ALTERNATE DATE 8110/2009 -LSRO 1211312010 NIA 12110/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2009 Cy2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 0 16 0 0 0 0 0 NUMBER OF CANDIDATES 'Response to RIS 2008-16 Attachment 9 Page 1 of 1 APPROVED BY OMB: NO. EXPIRES: O!V3 WOOl!NR(, FOR."" S.16 u.s !'IUCLEAR REGlJLATORY COMMISSION t'lurdc'n per re... J.lJ comply with !hi:\ yt\!untary lnf,)rmatlJn I huur, \.1111<<1ittn 1:\ u!'!td 10 plan OPERATOR LICENSING CUmmenlG , . EXAMINATION DATA 10202. (J I5t).OI31), Oflic< 0' Managemen! and Wll,.hmgtHJl,. DC ::0503. If it me.tn.-.; used tu Impuse.1O Itllhnnanon \.'nllt'..:rion does not a (':urTcnl1y vahd OMB \."omm! number. (he NRC may flI,li l.."lIOOUt.:1 or "'POfl:o.tlf
- .md a person i.... I1l.it required to
- 10. lhe informa(itm FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 III Renewed Facility Operating license Nos. DPR-29 and DPR-30 NRC Docket Nos. 5()'254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 0 1 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2010 CY 2011 CY2012 NUMBER OF REACTOR OPERATORS 6 0 6 4 NUMBER OF SENIOR REACfOR OPERA TORS*INST ANT 10 0 10 10 NUMBER OF SENIOR REACTOR OPERA TORS*UPGRADE 0 0 1 1 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 11/30/2009 NlA 512912011 3/1212012 ALTERNATE DATE 12107/2009 NlA 6/1212011 3126/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY2009 CY 2010 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 16 0 0 0 14 Response to RIS 2008*16 Attachment 10 Page 1 of 1 NRC FORM SJt. li.s NUCLEAR REGULATORY COMMISSION III-ZooSI OPERATOR LICENSING EXAMINATION DATA FACILITY Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 APPROVED BY OM8: NO, 3150,0131
- EXPIRES, E....nmated hunko per t,) rompl)" w;'b voluntary lof\"rmation COife(:110ll
- b,Uf. Tht'" Informal.on
\."uUecuun usedW plan budgets and thr I)peralor t!xJmmaliof)s. Send I.:\lmmtnts ). Office HI' M.1nag.emern and 1 impose 1.11'1 inttlfmarK,n t:()lltctM,)n does oot a I.:Uffenf 'I. VJIH,! OMB ,,'nolfUl number, the NRC IlUt ....onduC( or and il i\ nul required tn tu.lhe NRC REGION I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2oo9 CY2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo9 CY2010 CY2011 CY2Q12 NUMBER OF REACTOR 8 0 8 0 OPERATORS NUMBER OF SENIOR REACTOR 6 0 7 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 5/25/2009 N/A 5/30/2011 N/A ALTERNATE DATE 610112009 NlA 6/06/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2009 CY2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 0 0 NUMBER OF 0 15 0 0 0 CANDIDATES AmerGen'M www.exeloncorp.com An Exelon AmerGen Energy Company, 4300 Winfield Warrenville.ll August 13, U. S. Nuclear Regulatory ATTN: Document Control Washington, DC Braidwood Station, Units 1 and Nuclear Exelon 4300 Winfield Warrenllille.ll Facility Operating License Nos. NPF-72 and NPF*n NRC Docket Nos. STN 50*456 and STN 5()"457 Byron Station, Units 1 and Facility Operating License Nos. NPF-37 and NRC Doc;ket Nos. STN 50-454 and STN Clinton Power Station, Unit Facility Operating License No. NRC Docket No. Dresden Nuclear Power Station, Units 2 and Renewed Facility Operating License Nos. DPR-19 and NRC Docket Nos. and LaSalle County Station, Units 1 and Facility Operating License Nos. NPF-11 and NRC Docket Nos. 50-373 and Limerick Generating Station, Units 1 and Facility Operating License Nos. NPF-39 and NRC Docket Nos. 50-352 and Oyster Creek Generating Facility Operating License No. NRC Docket No. Peach Bottom AtomiC Power Station, Units 2 and Renewed Facility Operating License Nos. DPR-44 and NRC Docket Nos. 50-2n and August 13,2007 U. S. Nuclear Regulatory Page Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating license Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating license No. DPR*50 NRC Docket No. 50-289 Response to NRC Regulatory Issue Summary "Preparation and Scheduling of Operator licensing NRC Regulatory Issue Summary 2007-17, "Preparation and Scheduling of Operator licensing Examinations," dated July 12, 2007 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates to be tested In operator licensing examinations and the Generic Fundamentals Examinations (GFEs) for calendar years 2008 through 2011. Attachments 1 through 10 provide responses to RIS 2007*17 for the Exelon Generation Company, LLC (EGC) and AmerGen Energy Company, LLC (AmerGen) plants identified above. The requested information for each facility is provided on a separate NRC Form 536. In calendar year 2009, 6 candidates are expected to take the dual site limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment
- 8. The schedule for the indicated examination is as follows: the written examination and part of the operating examination will be given at limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination Is a dual site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 8 for Attachment 6 for LGS references Attachment 8 where necessary.
The operator licensing examination information for each facility is provided on a separate NRC Form 536. There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Michelle Yun at (630) 657-2818. Respectfully, Darin M. Director -Licensing and Regulatory August 13, 2007 U. S. Nuclear Regulatory Commission Page 3 Attachment 1-Completed NRC Form 536 for Braidwood Station Attachment 2 -Completed NRC Form 536 for Byron Station Attachment 3 -Completed NRC Form 536 for Clinton Power Station Attachment 4 -Completed NRC Form 536 for Dresden Nuclear Power Station Attachment 5 -Completed NRC Form 536 for LaSalle County Station Attachment 6 -Completed NRC Form 536 for Limerick Generating Station Attachment 7 -Completed NRC Form 536 for Oyster Creek Generating Station Attachment 8 -Completed NRC Form 536 for Peach Bottom Atomic Power Station Attachment 9 -Completed NRC Form*536 for Quad Cities Nuclear Power Station Attachment 10 -Completed NRC Form 536 for Three Mile Island Nuclear Station -Unit 1 Response to RIS 2007*17 Attachment 1 Page 1 of 1 u.s NliCLEAR REGllLATORV IlJ.lGIl5! OPERATOR LICENSING EXAMINATION DATA APPROVED SY OMS: NO. eXPIRES, OKf.l1l100l! Esr.imuted burden tH L,(Jmply with this information (t)IIe(.'tiull request: I hc)ur. ThIs mfhrYWllfOfl('111lccllun t/\ to plan budgets
- DC1OSS5.-(XlOl. (l' bf In,ernet '" ntand Budget. W..htngton. DC 10503. If a mean< used.n impuse .n inrnrmatioo
,,>I1<i<1.'. d"., I'Krt di""lay
- valid OMB ""ollul numbe,. tlte NRC ""'Y and a perr_on i." nne requred w In, lhe FACILITY Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 NRCllEGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2008 CY2009 CY201Q CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0 1 0 1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CYgQQa CY2010 CY2011 NUMBER OF REACTOR OPERATORS 0 1 0 6 NUMBER OF SENIOR REACfOR OPERATORS-INSTANT 0 13 0 12 NUMBER OF SENIOR REACfOR OPERATORS*UPGRADE 0 1 0 2 NUMBER OF SENIOR REACfOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/5/09 4/4/2011 ALTERNATE DATE 10/19109 5116/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER cvgQ.QB. MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 14 0 0 0 0 0 18 Response to RIS 2007-17 Attachment 2 Page 1 of 1 u.s NUCLEAR REGULATORY COMMISSION lH.lOO5) OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMS: NO.lI5()*OIJI EXPIRES: OHIJII::tXJII burden to l:t.Jmplr with Ihis.volunt:irY intinmuhoR 1,.\11let.1J(1I1 I hour. This i.nthrmutkJlll-'iIIIe<;uun is uf,e(J In .plan budgets and resuuJ\.-e..., for ope-ralof Send cflmments buJ'tkl!n
- ' . .
131 )'. Oflk. "f M,nngemelu .md mean" uMed to Impn.!it an IOfHrmalton valid OMS (nnlllli number. lilt NRC moy a person is Q\.I required to ttl, che FACILITY Byron Station, Units 1 and 2 Facility Operating License Nos. NPF*37 and NPF*66 NRC Docket Nos. STN 50*454 and STN 50*455 NRC REGION 11/ A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2.QQ2 CYgQ1Q CY gQ.11 ESTIMATED NUMBER OF L1CENSEE*PREPARED EXAMINATIONS 0 0 1 1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 1 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CY2009 Cy 2010 CY2011 NUMBER OF REACTOR OPERATORS 8 0 8 5 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 5 0 6 7 NUMBER OF SENIOR REACfOR OPERATORS*UPGRADE 1 0 1 0 NUMBER OF SENIOR REACfOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 5/1912008 612012010 817/2011 ALTERNATE DATE 512612008 06127/2010 8/14/2011 C. PROPOSED GENERIC FUNDAMENTAlS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CygQQfl MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 0 14 0 0 0 Response to RIS 2007-17 Attachment 3 Page 1 of 1 NRC FORM 5J6 C.S NUCLEAR REG liLA TORY COMMISSION III-ZlMI5) OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB 31StI..llJl EXPIRES: OIIl.J 11:l1Oll burden fe:oopt'n!iof' lU 4:umply with this vulyntaT}' inf\lrmativn l3)tlet'tk)f\ 1 bour, ThiS infurmatlon t:ull:e1.:fion IS u:o;ed 10 plan anU fur llperatllr examinations, Send estimate ttl the itemols and FOIAlPriv:\cy Se, OC h aoo to the [)eost Oftker. OtfM:e or In ormation 10201. (3I!lt)..tJI31l. Office of and Budget. WashIng!"** OC 20S0l.lf. means used III impose an inll,,,,,,,,;,," ,,,1""1;0. du.s ".,. d"play
- cumntly valid OMS <,,".ml.umber
- he NRC may not conduct nr sptmsnr...00 a per!iUn is nnt required to respmd to. the information FACILITY Clinton Power Station, Unit 1 Facility Operating Ucense No. NPF-62 NRC Docket No. 50-461 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CYgQlQ CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0 1 0 1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2OO8 CY2009 CY2010 CYgQ.11 NUMBER OF REACTOR OPERATORS 0 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 0 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS*LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 8/24/2009 812212011 ALTERNATE DATE 8/17/2009 812912011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY2008 cv2009 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 9 0 0 0 0 0 0 Response to RIS 2007-17 Attachment 4 Page 1 of 1 NRC FORM5.!6 l'.S NUCLEAR REGULATORY COMMISSION I3-ZlMIS)
OPERATOR LICENSING EXAMINATION DATA FACILITY APPROVED BY OM8, NO. JIsu.flI31 EXPIRES, mll.1I121_)!! c,;tim;,ted burden pet respc;)l1M:' to cmnply wrth this vulunt.u-y inlhrmattun I.'nUe\.1k)1\ request: I hour, This inthrl'l1OltloR l;oUcction
- u. used tH pi.1n budgets Nuclear Commis;;<<m.
Washing!oFl. DC bl internet to in X.'O:Ib.lsJJnrtEfllV
- .md t\) the Dest. Offacer. Oftke of In )fma1tHn ,,11<1
..ry Afro;",. N I). Offl,'e ofM.l1.Igemen, and Budget. Washmttl0n. DC 10S03. If 3 men",'1 used tu impose an Informatiun t,'oUel:tion dnes not display Ii currenUr vaJid OMB i..\;nnol number. 1M NRC may and 3 pentm nnt required to reltplnd to.lhe NRC REGION Dresden Nuclear Power Station, Units 2 and 3 III Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2.QOO CY2Q1Q CY2Qll ESTIMATED NUMBER OF LICENSEE* PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 ! 0 EXAMINATrONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo8 CY2oo9 CY2010 CY2011 NUMBER OF REACTOR 5 5 4 4 OPERATORS NUMBER OF SENIOR REACTOR 7 5 10 8 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 0 1 0 OPERATORS*UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 3/312008 31912009 21812010 3(7/2011 ALTERNATE DATE 417/2008 41612009 31812010 4/4/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED Cy2oo8 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEF'fBMBER DECEMBER ESTIMATED 0 0 0 14 0 NUMBER OF 0 0 12 CANDIDA1ES Response to RIS 2007-17 Attachment 5 Page 1 of 1 NIlC FORM S36 u.s NUCLEAR REGIILATORV COMMISSION llI-lOO5) OPERATOR LICENSING EXAMINATION DATA FACILITY LaSalle County Station, Units 1 and 2 APPROVED !IV OMB: NO. .115lJ.OIll EXPIRES: UKIlII:!(X)S EstimiUcd rcsptJnse
- h. t'OmpJy thif. VtllUnl3ry
,:ulkt:t;"Jn I huur, This tllfnrmaul.1ft b w.ed to ,;>I;m hudgets and reSoUI\"eS fhr l ' tMimllle.o.1Io R .. and WashlUlhlll. DC 20.503. Ira woed to impose an m(llrInatiofl ,*.,Ueetion IR,., ..,I display. v.lid OMS ,"ntml number. the NRC may not l,.'olldt..K.'t llf ."pOMOf. JOO .. perSHfI is not required to re....pond tn. the itUhrmatktn ":tJIItc.'fioD. NRCR.:OION III Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2oo8 CY2Q1Q CY2Q.11 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo8 cy2010 CY 2011 NUMBER OF REACTOR 4 0 4 0 OPBRATORS NUMBER OF SENlOR REACTOR 6 0 8 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 811812008 9/14/2010 ALTERNATE DATE 8125/2008 912112010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED Cy 2009 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 0 12 0 0 NUMBER OF 0 0 0 CANDIDATES Response to R!S 2007-17 Attachment 6 Page 1 of 1
- See Attachment 8 (Peach Bottom AtomiC Power Station) for LSRO numbers and exam dates NRCfORMS3(i u.s NUCLEAR R£{JULA TORV COMMISSION (1I-2IJ05, OPERATOR LICENSING EXAMINATION DATA APPROVED 8Y OMII: NO.
EXPIRES: OlVJ 1120011 Estimated burden to c.'vmply widi this voluntary intbrmation tK...nagemem and '03. If a mtJns uMd to impose an inthMllatkm (l,lle<:tkln . not di'Play a currently' valid OMS contOlI number. the NRC IllI1Y not ,,*ondu.:t or and ., person to; not rtquftd ttl to. the inttlrmation (:olJa:flon. FACILITY Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 NRC REGION I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY200a CY2009 CY2010 CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0
- 1 0 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 1 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CY2010 CYgQU NUMBER OF REACTOR OPERATORS 3 0 9 0 NUMBER OF SENIOR REACI'OR OPERATORS*
INSTANT 11 0 9 0 NUMBER OF SENIOR REACI'OR OPERATORS* UPGRADE 2 0 1 0 NUMBER OF SENIOR REACI'OR OPERATORS-LIMITED 0
- 0 0 PROPOSED DATES PRIMARY DATE 10/20/2008
- 10/04/2010 NlA ALTERNATE DATE 10/27/2008
- 10/1812010 NlA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 0 0 18 0 0
.. __ Response to RIS 2007-17 Attachment 7 Page 1 of 1 NRCFORM5J6 u.s NtJCLllAR REGtJLATOR1' COMMISSION APPROVED 8Y OMS; NO, EXPIRES; IlllJ3112!Xl!! 18-10115) ESlimlltf'd burden per to with vnluntary inillfmatinn 1..'1JUe(tion J Thl:\
- olleetion UM!
- d to .plan budget
- . OPERATOR LICENSING Nut.:lear Cmnmis,SKln.
Wll.lihmgtof1. DC .!OSSS*f)OOI. {If blt inremet EXAIV1INATION DATA m ot:'olle(..'ts@nn.*'Csw. and ttl the Desk Otftcer. Office uf In urmatit)n JOO AIr..", NE 8*10202. (31'0,0131). 0111<. ofMl1tmenl;md W"",hmgtol1. DC 1050). If a means used tu impose an L'oUectinn J\()t di$play a cumntly. vaJid OMB control number. the NRC may liut (oOOUl.1 M !.ponsdr. and a penon is not required to (0. the mt1!Onatk)n FACILlTV Oyster Creek Generating Station Facility Operating license No. DPR-16 NRC Docket No. 50-219 NRC REGION I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2Q.1Q CY2011 PSTlMATED NUMBER OF LlCENSE&PREPARED EXAMINATIONS 1 1 1 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo8 CY2009 CY 2010 CY2011 NUMBER OF REACTOR OPERATORS 5 6 6 4 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 9 10 10 10 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 0 0 2 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 417/2008 6115/2009 6114/2010 3/14/2011 ALTERNATE DATE 4/1412008 6/2212009 612112010 3/21/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER cvgQQfl CV@Q2 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 16 0 0 0 16 0 0 16 Response to RIS 2007-17 Attachment 8 Page 1 of 1 NRC F'ORMS36 II.S NUCLEAR REGULATORY COMMISSION C8*1IM1S1 OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB, NO. )1S(l..OI31 EXPIRES,OlllJII2OIlli E.... irrusted burden per response to compiy with dlilt voluntllry Intbrm;uion 4,"otb.1ion I htlur. TId:; c.'t)ib.:tkJR i:> used to plun budgets S. .nd Affai Off",. <>f M._ment iiIId Wa,hlnglon. OC 20503. If. mea.... used to imp"'" ** i.ti'l'Ill3t .... cHllt\;ti". <1<"" not display
- vdlid OMB co.tml .... mber. the NRC may nut ;':OOOut.1 nr :"ponSOI\
and a penlon ntlt required 10 respnnd Il). the: inf,)rmMioo colle\:tion, FACILITY Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating license Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 NRC REGION I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2008 CY2009 CYgQlQ CY 2011 ESTIMATED NUMBER OF UCENSEE-PREPARED EXAMINATIONS 1 1 and 1 LSRO 1 0 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 CY2009 CY2010 CY 2011 NUMBER OF REACTOR OPERATORS 4 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 9 7 10 0 NUMBER OF SENIOR REACTOR OPERA TORS*UPGRADE 2 2 2 0 NUMBER OF SENIOR REACTOR OPERATORS*LIMITED 0 6 0 0 PROPOSED DATES PRIMARY DATE 121812008 1217/2009 7127/2009 .LSRO 121612010 ALTERNATE DATE 12115/2008 12114/2009 1211312010 C. PROPOSED GENERIC FUNDAMENT AI.S EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER cv2008 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPfEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 7 0 0 0 14 0 Response to RIS 2007-17 Attachment 9 Page 1 of 1 NRC FORM SJ6 u.s NUCLEAR IU!:GULA TORY COMMISSION (Jl.lOO5) OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO 3151J*OI3I EXPIRES, flll/3l/:!Ol18 EM:iml1l:ed burden per fe§ponst I.:ompl¥ with th.is 'Iolufllary 'nti.mnllttOn coUec.:tkm requeSI: I hour. Inti)rmatlon l..'lJJle\.1ion is used tt) pmn Cl)mmission. DC ]USSS-OOtH. or e-malt CQ i Ou)Ife(t.\@llrcEt)w. and ttl the Desk OffK.'Cf. OtflCe \It' III rmatinn and Regulatn'}' Alfain;. N 8*10:202. (3"0.0131). OffICe uf Management and DC .2()jU3. If il1M1l1l:4 used 10 impnse an m(orfn\lfitm ',Ilia,,,,. does I)ot display
- valid OMS mntrol number.lbe NRC may flOC ';(lOOlK.1 or !!pUflsnr.
aild ;) per!ion nor rt'quired to respund 1lI. the inronml[ion cu11tt.110n. FACILITY Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 NRCREGJON III A. PROPOSED EXAMINATION PREPARATION SCHEDllLE PROPOSED NUMBER CYgQQa CY2009 CY2010 CY2011 ESTIMATED NUMBER OF UCENSEE*PREPARED EXAMINATIONS 0 1 1 0 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY2011 NUMBER OF REACTOR OPERATORS 0 4 6 0 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 0 11 8 0 NUMBER OF SENIOR REACTOR OPERA TORS*UPGRADE 0 1 1 0 NUMBER OF SENIOR REACfOR OPERATORS*LlMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 1011612009 10/1812010 ALTERNATE DATE 10/2312009 10/25/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY2008 CY2.Q.Qi MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPI'EMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 16 0 0 0 15 0 0 Response to RIS 2007-17 Attachment 10 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. ) 1.lQ.QIJ I EXPIRES: 1I1!I3l!:lIKJ8 (11-:1005) Eslim:ued burden I'CSpUR.<if tu l,.'ompll' with thi... voluntary inl\lrmaliun aoo thr nperr.foreXamif1iUioM. OPERATOR LICENSING estimate to the aJX! EXAMINATION DATA sk Oftker. (}jfl(,'f uno Omlor.,n (.1I50-0I31J. Ollie. ofM....gtmenl and Wl.\$hIR!tttln. DC )JSOl. If a u.;ed to Inttl1'lnatiun <ollection dt"" dj'pl.y a ....""mIX valid OMB ..""lnll .umber. (be NRC may nut l'ondud or spunSl1f. Jnd :l perl'oon i.. n(lf required to respolXi {(l,lht FACILITY NRC REGION Three Mile Island Nuclear Station, Unit 1 I Facility Operating License No. DPR-SO NRC Docket No. 5()"289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2oo8 CY2010 CY2Q11 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2oo8 CY2OO9 CY2010 CY2011 NUMBER OF REAcroR 0 10 0 8 OPERATORS NUMBER OF SENIOR REACTOR 0 6 0 8 OPERATORS-INSTANT NUMBER OF SENIOR REACfOR 0 1 0 1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMrrEO PROPOSED DATES PRIMARY DATE 5125/2009 5/30/2011 ALTERNATE DATE 611/2009 61612011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY gQml NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 0 0 0 0 NUMBER OF 16 0 0 CANDIDATES UNITED NUCLEAR REGULATORY REGION 2443 WARRENVilLE ROAD, SUITE 2 LISLE, ILLINOIS June 12, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville,IL 60555 CLINTON POWER STATION CONFIRMATION OF INITIAUREQUALIFICATION OPERATOR LICENSE EXAMINATIONS
Dear Mr. Crane:
In a letter dated May 29,2007 (U-60381 0), your staff requested we schedule an initial license operator examination in August 2011. We have tentatively scheduled the requested examination to occur during the weeks of August 22 and August 29,2011. On-site validation of the examination is tentatively scheduled to occur during the week of July 31, 2011. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the examination. In the letter your staff indicated they wanted to reserve 2 weeks for the examination. This implies that you will have ten or more applicants taking the license examination. Please inform us if the number of candidates declines below ten as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover you need to change the scheduled date for the examination. A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. We have scheduled a Licensed Operator Requalification Training Program Inspection (IP 71111.11) for the week of November 5, 2007. Please inform us at your earliest opportunity if you discover this week is outside of your normally scheduled requalification training program's annual examinations. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents C. Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 Site Vice President -Clinton Power Station Plant Manager -Clinton Power Station Regulatory Assurance Manager -Clinton Power Station Chief Operating Officer Senior Vice President -Nuclear Services Vice President -Operations Support Vice President -Licensing and Regulatory Affairs Manager Licensing -Clinton Power Station Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk -Licensing* Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois Chairman, Illinois Commerce Commission C. Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rmladams.html(the Public Electronic Reading Room). Sincerely, /£#-/ Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 license No. NPF-62 Site Vice President -Clinton Power Station Plant Manager -Clinton Power Station Regulatory Assurance Manager -Clinton Power Station Chief Operating Officer Senior Vice President -Nuclear Services Vice President -Operations Support Vice President -licensing and Regulatory Affairs Manager licensing -Clinton Power Station Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk -licensing Assistant Attorney General Illinois Emergency Management Agency State liaison Officer, State of Illinois Chairman, Illinois Commerce Commission DISTRIBUTION: TEB RAG 1 SPS1 RidsNrrDirslrib GEG KGO RML2 SAM9 SRI Clinton CAA1 DRSIII DRPIII PLB1 TXN NLS DOCUMENT NAME: G:\DRS\Work in Progress\CLI 06_07 DRS OLwpd o Publicly Available 0 Non-Publicly Available 0 Sensitive o Non-Sensitive T o receive a CODY 0 f this document, Indicate In the concurrence box" C"" Copy without attach/enel "E" " CIlpY with attac h/encl " N"=Nocopy OFFICE RIII:DRS IN RIII:DRS j(I J NAME DMcNeil:co HPeterson ...d.# DATE 0611:l.107 061\ '2.f07 xr OFFICIAL RECORD I AmerG An EX*lon Company Clinton Power Station R. R. 3, Box 228 Clinton, IL 61727 U-603810 May 29, 2007 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-001 Clinton Power Facility Operating License to No. NRC Docket No.
Subject:
Scheduling of Operator Licensing Examination Clinton Power Station requests approval from the U.S. Nuclear Regulatory Commission (NRC) to schedule Initial License Training (ILT) examination dates during the weeks of August 22 and August 29, 2011 : Because of the site's outage schedule and the timing of when the site brings in operators for class, the site is requesting these exam dates. If you have any questions, please contact A. D. Bailey at (217) 937-4001. Respectfully, B an Hanson Site Vice President Clinton Power Station EETlblf JUN 5}}