November 10, 2015
SUBJECT:
GRAND GULF NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000416/2015404
Dear Mr. Mulligan:
On October 8, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security
inspection at the Grand Gulf Nuclear Station. An NRC inspector discussed the results of this inspection with you and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.
NRC inspectors documented three findings of very low security significance (Green) in this report. All of these findings involved violations of NRC requirements. The NRC is treating these violations as non-cited violations (NVCs) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violations or significance of the non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Grand Gulf Nuclear Station.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with a basis for your disagreement, to the Regional Administrator, Region IV, and the NRC Resident Inspector at the Grand Gulf
Nuclear Station. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/ James R. Larsen for
Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety
Docket No. 50-416 License No. NPF-29
Nonpublic Enclosure:
NRC Inspection Report 05000416/2015404 w/Attachment: Supplemental Information
cc w/enclosure: Mr. James Dorsey Manager, Security Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 cc w/o encl: Electronic Distribution
ML15314A844 Entire Report: SUNSI Review By: M. Brooks Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: NRC-002 MD 3.4 Non-Public A.3 Cover Letter Only:
SUNSI Review By: M. Brooks Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: RGN-002 SUNSI Review Complete OFFICE PSI:PSB1 C:PSB1 C:PBC C:PSB1 NAME MBrooks MHaire GWarnick MHaire SIGNATURE /RA/ /RA/ /RA/ /RA/
DATE 10/29/15 11/2/15 11/5/15 11/10/15 Letter to Kevin Mulligan from Mark S. Haire, dated November 10, 2015
SUBJECT: GRAND GULF NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000416/2015404
Electronic distribution by RIV w/enclosure
- Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov) Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSI R (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov) Senior Resident Inspector (Matt.Young@nrc.gov) Administrative Assistant (Alley.Farrell@nrc.gov)
Electronic distribution by RIV w/o enclosure
- Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Matt.Young@nrc.gov)
Resident Inspector (Neil.Day@nrc.gov) Administrative Assistant (Alley.Farrell@nrc.gov)
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Senior Project Engineer, DRP/C (Cale.Young@nrc.gov)
Project Engineer (Michael.Stafford@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Alan.Wang@nrc.gov) Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)
ROPreports Resource