ML17223B066
| ML17223B066 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 01/24/1991 |
| From: | Goldberg J FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L-91-26, NUDOCS 9101280251 | |
| Download: ML17223B066 (4) | |
See also: IR 05000335/1990002
Text
t 6 ACCELERATED
DIjRIBUTION
DEMONSTiTION
SYSTEM REGULATORY
INFORMATION
DISTRIBUTION
SYSTEM (RIDS)ESSION NBR: 9101280251
DOC.DATE: 91/01/26 NOTARIZED:
NO FACIL:50-335
St.Lucie Plant., Unit 1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION
GOLDBERG,J.'H.
Florida Power&Light Co.RECIP.NAME
RECIPIENT AFFILIATION
Document Control Branch (Document Control Desk)SUM'ECT: Clarifies 900413 response to violations
noted in Insp Repts 50-335/90-02
&50-389/90-02.Corrective
actions:nuclear
job planning sys changed to include speed governor oil changes consistent
w/vendor recommendations.
DISTRIBUTION
CODE: ZE01D COPIES RECEIVED:LTR
ENCLSIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
of Vio ation Response NOTES: DOCKET 05000335 05000389 RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS AEOD/DEIIB
DEDRO NRR SHANKMAN,S
NRR/DOEA/OEAB
NRR/DRIS/DIR
NRR/PMAS/ILRB12
OE DI RE~FILE 0 EXTERNAL: EG&G/BRYCE
~J.H.NSZC COPIES LTTR ENCL 2 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NORRIS,J AEOD AEOD/TPAB NRR MORISSEAU,D
NRR/DLPQ/LPEB10
NRR/DREP/PEPB9
D-NRR/DST/DIR
8E2 NUDOCS-ABSTRACT
OGC/HDS2 RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 ib 1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELliVIINATE
YOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL Q
P.O.Box14000, Juno Beach, FL 33408-0420
JANUARY 2 4 1991 L-91-26 U.S.Nuclear Regulatory
Commission
Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
Re: St.Lucie Unit 1 and 2 Docket Nos.50-335 and 50-389 Response to Notice of Violation Clarification
Ins ection Re ort 90-02 Reference A: St.Lucie Unit 1 and 2 Docket Nos.50-335 and 50-389 Response to Notice of Violation Ins ection Re ort 90-02 L-90-138, dated April 13, 1990 On January 10, 1991, a discussion
between NRC Region II personnel and the St.Lucie Plant staff resulted in a request by the NRC for clarification
of the"specific procedures" mentioned in Finding B, Response 3, in Reference A.In Reference A, Florida Power&Light Company (FPL)stated: 3.The specific vendor recommendation
regarding the speed governor oil change was completed.
-The specific procedures
were changed to reflect the oil changes at a frequency consistent
with the vendor's recommendation.
FPL submits the following clarification:
The Nuclear Job Planning System (NJPS)was changed to include the speed governor oil changes at a frequency consistent
with the vendor's recommendation
on February 2, 1990.The NJPS is a system designed to ensure preventative
maintenance
is scheduled within the desired time frames and tracked to completion.
A detailed set of written work instructions
was developed using the guidance in the vendor technical manual to perform the required preventative
maintenance.
This detailed set of written work instructions
was in the form of an attachment
which was issued with the maintenance
work order.When this maintenance
was subsequently
performed, it was done using the developed set of detailed 92022S02~25i 91012~OCK 05000735 PDR~go//gp an FPL Group company
L-91-26 Page 2 instructions.
In addition, this maintenance
was performed under the supervision
of the Instrument
and Control supervisor
and the System Engineer.FPL regrets any confusion caused by our response of April 13, 1990.A detailed written procedure was issued on January 11, 1991, replacing the written instructions
discussed above.Very tru y yours, J.H.Goldberg President-Nuclear Division t4 JHG/JWH cc: Stewart D.Ebneter, Regional Administrator, USNRC Region IZ Senior Resident Inspector, USNRC, St.Lucie Plant