ML17249A898

From kanterella
Revision as of 05:01, 19 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1980
ML17249A898
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/08/1980
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17249A897 List:
References
NUDOCS 8005130379
Download: ML17249A898 (8)


Text

~~80 05X 3 Q97V I-g OPERATliVG STATUS OPERATlNG DATA REPORT DOCKET NO.50 244 DATE Ma 8 1980 COMPLETED BY Andrew E.McNamar TELFPIIONE 1-315-524-4446 Ext.293, at Ginna I.Ilnit Name: GiiVNA STATION UN 2 Reporting Pcr;od.~Aril 1980 ,5.I.icenscd Thermal Power (hfWt): f.Namcplatc Rating (Gross MWc): 'i.1)csign I'.Icctrical Rating (Nct MWe): 6.hfaximum Dcpcndable Capacity (Gross hfWe):.hfaximum Dependable Capacity (Net hfWc): 90 Notes Annual Refueling and Maintenance Shutdown continued.

8.lf Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: ').Power Level to Which Restricted, If Any (Nct MWc): It).Reasons For Restrictions, If Any: This hfonth Yr.-to-Date Cumulative I I.Ilours In Reporting Period 12.Number of Hours Reactor Was Critical I I Reactor Rescrvc Shutdown Hours I'i.Ilours Generator On-Line IS.IInit Rc>>ervc Shutdown Hours I 6.Gross Thermal Energy Genera(cd (hfWH)I'.Gross Electrical Energy Generated (MWkl)III.iVet Flcctrical Energy Generated (hfWH)I 9 Unit bcfvlcc Factor 719 0 0 po 2 903 2 114.75 2 114.50 3 118 656 1 021 026 970,811 72.83/91 415 69 794.52 1,621.57*68 071.13 8.5 Yr 91 394 458 29 706 997 28,132,359 74.46%2i).Iinit Availability Factor 2l.Unit Capacity I actor (Using hfDC Net)22.Unit Capacity Factor (Using,DER Nct)2.$.Unit Forced Outage Rate 2 f.Shutdowns Scheduled Over Next 6 hfonths (Type, 00 0%0/0%72.83%71.15%71.15%0%Date and Duration of Each): 74.47%67.85%67.85%9.63%2>.If Shut Down At End Of Report.Period, Estimated Date of Startup: May 17, 1980 26.Units In Test Status (Prtor to Commercial Operation):

Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COhfhfERCIAL OPERATION Achieved"<Cumulative Total Commencing January 1, 1975 49 18 iRKV, I jTii)

'~r 0 AVERAGE DAILY UNIT POWER UNIT-2-A ril 1980 DOCKET NQ.-50 244 UNIT O'I pinna Statio May 8, 1980 COMPLETED BY Andrew E.McNamara TELEPHONE 1-315 524-444-6 Ext.293, at Ginna REFUELING AND MAINTENANCE SHUTD(NN CONTINUED DAY AVERAGE DAILY POWER LEVEL (M We-N et)DAY, AVERAGE DAlLY POWER LEVEL'M We-Net)10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 21 28 29 30 31 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month, Compute to the nearest whole megawatt.49 87 (RKV 1/789 V

UNIT SHUTDOWN AND POWER REDUCTIONS DO(:KI:.T NO.llNll'NAhlE Nl Ginna Station DATI'.M E9 (:OhlPLETI'.D IIY tt'~~ndrew E.McNamaha 1 I'.LI'.P)lONE 1-315-2-6 Ext.293, at Ginna No.Date 0 4 0~0 0 X.'-P4 C 0 0 0 01~0 C u 0 0EA C 0 n Licensee Event Report II Em 0 IA (J C 0 II1 C 0 0 0 Eo lJ Cause&Corrective Action to Prevent Recurrence Annual Refueling and Maintenance Shutdown continued.

I F: Forced St Scheduled 49 99 1Ravo 1/791 Reason: A-Etluipmcnt Failure (Explain)ll-hlaintenancc or 1'cst C-Refueling D-Regulatory Restriction E-Operator Training 8: Liccnsc Examination F-Administrative G-Operational Error (Explain)II-Other (Explain)hlethod: I-hfanual 2-hlanual Scram.3-Automatic Scram.4-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Shccts for Liccnscc Event Report (LER)File (NUREG-0161)Exhibit 1-Same Source c 5 aa 4-NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.0-2 UNIT Ginna Stat on DATE COMPLETED BY Andrew E.McNamar MONTH A ril 1980 TELEPHONE I."315-524-4446 Ext.293, at Ginna Annual Refueling and Maintenance Shutdown continued.

49 123 (1/7$)

~.r-~