Responds to NRC 910821 & 900509 Ltrs Re Violations Noted in Edsfi Rept 50-244/91-80 & Insp Rept 50-244/89-81, Respectively.Corrective Actions:New molded-case Circuit Breaker Will Be Tested During 1993 Refueling Outage
ML17309A488
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/08/1992
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 9205210005
Download: ML17309A488 (6)


See also: IR 05000244/1991080

Text

~.ACCELERATED

DISTRIBUTION

DEMONSTRATION

SYSTEM REGULATORY

INFORMATION

DISTRIBUTION

SYSTEM (RIDS)ESSION NBR:9205210005

DOC.DATE: 92/05/08 NOTARIZED:

NO CIL:50-244

Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G UTH.NAME AUTHOR AFFILIATION

MECREDY,R.C.

Rochester Gas&Electric Corp.RECIP.NAME

RECIPIENT AFFILIATION

JOHNSON,A.R.

Project Directorate

I-3 DOCKET 05000244 R SUBJECT: Responds to NRC 910821&900509 ltrs re violations

noted in EDSFI Rept 50-244/91-80

&Insp Rept 50-244/89-81, respectively.

Corrective

actions:new

molded-case

circuit breakerwill be tested during 1993 refueling outage.DISTRIBUTION

CODE: AOOID COPIES RECEIVED:LTR

I ENCL 0 SIZE: TITLE: OR Submittal:

General Distribution

D/NOTES:License

Exp date in accordance

with 10CFR2,2.109(9/19/72).

05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: NRR/DET/ECMB

7D NRR/DOEA/OTSB11

NRR/DST/SELB

7E NRR/DST/SRXB

8E OC G PILE Ol r lERNAL NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-3 PD NRR/DET/ESGB

NRR/DST 8E2 NRR/DST/SICB8H7

NUDOCS-ABSTRACT

OGC/HDS 1 RES/DS IR/EI B NSIC COPIES LTTR ENCL D D D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!jTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL~$D D

t1

t zruznz ziziirzz)m7jjz~zzzzz<z8N imzz ROCHESTER GAS AND ELECTRIC CORPORATION

ROBERTC MECREDY Vice President rr Kw Lear owl's o 89 EAST AVENUE, ROCHESTER N.Y.14649-0001

TELEPHONE AstEA coDE 71B 548 2700 Clnne Nucteer Production

May 8, 1992 U.S.Nuclear Regulatory

Commission

Document Control Desk Attn: Allen R.Johnson Project Directorate

I-3 Washington, D.C.20555 Subject: Update/Extension

Request for Corrective

Actions to be Taken in Response to Notice of Violation-Molded Case Circuit Breaker Testing-NRC Inspection

Repor No.50-244/89-81-06

dated May 9, 1990 R.E.Ginna Nuclear Power Plant Docket No.50-244 Ref.(a): Letter dated.August 21, 1991 from M.W.Hodges, NRC, to RG&E, Subject-Electrical

Distribution

System Functional

Inspection

for Ginna Nuclear Power Station (Report No.50-244/91-80)

Dear Mr.Johnson: On page 27 of reference (a), the NRC closed Violation 50-244'/89-81-

06 pertaining

to a lack of scheduled periodic testing of Class 1E 480 V molded case circuit breakers (MCCB)as follows: "In response to the NOV, the licensee stated that it was developing

appropriate

test methods for MCCBs as part of the Reliability

Centered Maintenance (RCM)program.Corrective

Action Report 1985 was initiated to formally track and.address the lack of MCCB testing.A corrective

action plan was developed to systematically

evaluate the identified

violation.

This consisted.

of:""Initiation

of'a program for periodic MCCB testing by the next refueling outage.""The team concluded that the corrective

action plan initiated, to address the lack of MCCB testing was comprehensive

and addressed the essential elements to develop an effective testing program.Based on the licensee's

continuing

MCCB test program development

and the revision of appropriate

test procedures, this violation is closed." Since the"next refueling outage" referred to above is the 1992 Refueling Outage, RG&E is providing the following update/extension

request for corrective

actions to be taken in response to Violation 50-244/89-81-06:

9205210005

920508 PDR ADOCK 05000244

I M)e.""qpdgg g~~v

1)Development

of the'MCCB test program is in progress and is being coordinated.

with Reliability

Centered Maintenance (RCM)program commitments

as well as the Maintenance

Procedure Upgrade Project (MPUP)schedule.The RCM preventive

main-tenance (PM)enhancements

and the MCCB testing program are being implemented

into interactive

PM procedures.

The RCM project has a MCCB PM initiation

date of 12/31/92.Current plans are to procure MCCB test.equipment and finalize pro-cedures for the MCCB program during 6/92-8/92.2)To gain breaker testing experience, a non-safety

related MCC will be tested first under the new program.In keeping with the EPRI breaker maintenance

guidelines, the initial testing will proceed cautiously

and will not be conducted during a plant outage.This will facilitate

resource allocation

and keep the initial testing from becoming a critic@1 path activity.Initial MCCB testing will be conducted sometime late in 1992.3)Scheduling

for safety related MCC's will be completed by 12/92.Testing of safety related'CC's

wi21 be initiated during the 1993 refueling outage.Very truly yours, GJWN225 Robert C.Mecredy xc: Mr.Allen R.Johnson (Mail Stop 14D1)Project Directorate

I-3 Washington, D.C.20555 U.S.Nuclear Regulatory

Commission

Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector

-r~~EI 4 I