Responds to 781115 NRC Ltr Re Violations Noted in Inspec Repts#50-400/78-06,#50-401/78-06,#50-402/78-06 & #50-403/78- 06.Corrective Actions:Daily Weld Log to Be Kept & Turned in to QA Superintendent
ML18003A309
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 11/22/1978
From: Howe P
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18003A307 List:
References
NUDOCS 7812180334
Download: ML18003A309 (6)


See also: IR 05000400/1978006

Text

November 22, 1978 CSL Carolina Power&Light Company (v'i'fJItgg

P g~Mr.James P.O'Reilly United States Nuclear Regulatory

Commission

Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303 Dear Mr.O'Reilly: In reference to your letter of November 15, 1978, referring to ROII: VLB 50-400/78-06, 50-401/78-06, 50-402-78-06, and 50-403/78-06, the attached is Carolina Power 6 Light Company's reply to the deficiency

as identified.

It is considered

that the corrective

and preventive

actions taken are satisfactory

for resolution

of these items.Thank you for your consideration

in this matter.Yours very truly, P.W.Howe Vice President Technical Services NJC/gpr (669/813)Attachment

cc: Mr.J.-A.Jones

I h 0 P gP

4l~4 o I DEFICIENCY

Condition Re orted Criterion V of Appendix B to 1OCFR50 as implemented

by Carolina Power and Light PSAR Section 1.8.5.5., states in part that,"Activities

affecting quality shall be prescribed

by documented

instructi.ons, procedures

or drawings...and shall be accomplished

in accordance

with these instructions, procedures

or drawings." Procedures

applicable

to control of welding electrodes

used in construction

of the conteimnent

liner are included in Chicago Bridge Iron's"Contract Quality Assurance Handbook, Contract 84031/2, Div.4." This document requires record keeping sign-off entries for issuance and return (or complete usage)of welding electrodes

on a"Daily Weld Distribution

Log." Contrary to the described requirements, an examination

of%he log on October 6, 1978, revealed that the record keeping sign-off required to verify return or complete usage of electrodes

were not entered for one issuance on September 21, 1978, and all issuances on October 4, 1978.t Corrective

Ste s Which Have Been Taken and Results Achieved 1.The individual

responsible

for the weld material return stated that he did supervise the return of unused weld material on the two dates in question, but forgot to sign the log.2.The responsible

individual

has signed the"Dai.ly Meld Distribution

Log" for the two dates in question.Corrective

Ste s Mhich Have Been Taken to Avoid Further Noncom lienee 1.The CB&I weld"pusher" has been instructed

to turn over the completed daily weld log to the QA Technician

or Pxoject Welding and QA Superintendent

for che at the end of each shift.2.CP&L site QA has included reviews of the"Daily Weld Distribution

Log" in the QA surveillance

checklist for the containment

liner erection.Date When Full Com liance Mill be Achieved Full compliance

was achieved on October 6, 1978.

l fl~I

CPS Carolina Power 8 Light Company November 22, 1978 Mr.James P.O'Reilly United States Nuclear Regulatory

Commission

Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303.Dear Mr.O'Reilly: In reply to.your letter of November 15, 1978, referring to RII: JCB 50-400/78-06

50-401/78-06, 50-402/78-06, 50-403/78-06, the inspection

report for the October 3-6, 1978, Shearon Harris Nuclear Power Plant visit has been reviewed and found to contain no proprietary

information.

Thank you for your consideration

in this matter.Yours very truly, ce~P.W.Howe Vice President Technical Services NJC/jpr (281/447)cc: Mr.J.A.Jones