ML18082B116
| ML18082B116 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 09/05/1980 |
| From: | Eckert R Public Service Enterprise Group |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8009110323 | |
| Download: ML18082B116 (1) | |
Text
Richard M. Eckert Senior Vice President Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-8096 Energy Supply and Engineering September 5, 1980 Mr. Oarrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Eisenhut:
LOW POWER TEST PROGRAM LICENSED OPERATOR TRAINING SALEM GENERATING STATION UNITS 1 AND 2 DOCKET NOS. 50-272 AND 50-311 A Low Power Test Program No. 2 for the purpose of filling the requirements Generating Station, Unit SRO licensed individuals tion of the following:
J. Driscoll c. Connor L. Fry J. Starcevich R. Macwatters (LPTP) has been conducted on Salem Unit training licensed operators and Safety Evaluation Report, Salem Nuclear 2, NUREG-0517 Supplement
- 4. All RO and have received training with the excep-Chief Engineer -Salem Station Planning Engineer Station Operating Engineer Shift Supervisor
- Senior Shift Supervisor With the exception of Macwatters, who was on vacation, the four other individuals were not trained due to the unit being taken to Mode 5 on August 29, 1980, due to leakage from a control rod drive mechanism vent. Our present plan is to keep the unit in Mode 5 to perform installation work on fire protection dampers until such time as a full power license is imminent.
We, hereby, commit to perform the LPTP training for these five individuals prior to Unit 2 exceeding 5% rated power. If you have any questions concerning this matter, please feel free to contact us. Sincerely, 800911*032..3 v