ML19074A054
Jump to navigation
Jump to search
| ML19074A054 | |
| Person / Time | |
|---|---|
| Site: | 99902024 |
| Issue date: | 03/21/2019 |
| From: | Dennis Morey NRC/NRR/DLP/PLPB |
| To: | Michelle Catts GE Hitachi Nuclear Energy |
| Golla J, NRR/DLP/PLPB, 415-1002 | |
| References | |
| EPID L-2017-TOP-0033 NEDC-33173P | |
| Download: ML19074A054 (23) | |
Text
/RA/
Code of Federal Regulations
- 3.4.1.1 Cold Eigenvalue
3.4.1.2 Hot Eigenvalue 3.4.1.3 TIP Measurements 3.4.1.4 Fission Density Benchmarks 3.4.2.1 Pin Power Peaking Uncertainty 3.4.2.2 Bundle Power Uncertainty (Four Bundle and Power Allocation Combined)
3.4.3.1 SLMCPR
3.4.3.2 R-factor
3.4.3.3 Operating Limit Minimum Critical Power Ratio
burned 3.4.3.4 Loss-of-Coolant Accident Related Nodal Power Limits
3.4.3.5 Thermal-Mechanical Performance; Fuel Rod Exposure 3.4.3.6 Shutdown Margin; Standby Liquid Control System
Suggested change shown in the markup.
Suggested change shown in the markup.
Suggested change shown in the markup.
Suggested change shown in the markup.