" " August 11, 2014
Mr. Edward Senior Vice President and
Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000275/2014405 AND 05000323/2014405
Dear Mr. Halpin:
On July 10, 2014, the U.S. Nuclear Regulator y Commission (NRC) completed a security baseline inspection at your Diablo Canyon Power Plant, Units 1 and 2. The inspection covered a key attribute of the Security Cornerstone of the NRC's Reactor Oversight Process, Material Control and Accounting of Special Nuclear Material. The enclosed inspection report documents the inspection results, which were discussed on July 10, 2014, with Mr. Edward Senior Vice President and Chief Nuclear Officer, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/ Heather J. Gepford, Chief Plant Support Branch 2 Division of Reactor Safety
Docket Nos.: 50-275; 50-323 License Nos.: DPR-80; DPR-82 Nonpublic Enclosure:
NRC Inspection Report 05000 275 and 05000323/2014405 w/Attachment:
Supplemental Information cc w/enclosure:
Mr. Michael V. Priebe Nuclear Security Director Pacific Gas and Electric Company Diablo Canyon Power Plant Mail Code 104/5/508 P.O. Box 56
Avila Beach, CA 93424
Distribution for Diablo Canyon Power Plant E.Halpin - 2 - In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/ Heather J. Gepford, Chief Plant Support Branch 2 Division of Reactor Safety
Docket Nos.: 50-275; 50-323 License Nos.: DPR-80; DPR-82
Nonpublic Enclosure:
NRC Inspection Report 05000 275 and 05000323/2014405 w/Attachment:
Supplemental Information cc w/enclosure:
Mr. Michael V. Priebe Nuclear Security Director Pacific Gas and Electric Company Diablo Canyon Power Plant Mail Code 104/5/508 P.O. Box 56
Avila Beach, CA 93424
Distribution for Diablo Canyon Power Plant
Distribution: See next page DOCUMENT NAME: R:\_REACTORS\_DC\2014\DC2014405-SNM MC&A RPT-NonSGI-LC2 ADAMS ACCESSION NUMBER: ML14223B205 Entire Report: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: MD 3.47 Non-Public A.3 Cover Letter Only: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: SUNSI Review Complete OFFICE SHP:PSB2 C:PSB2 C:DRP/A C:PSB2 NAME L. Carson II/dch H. Gepford W. Walker H. Gepford SIGNATURE /RA/ /RA/ /RA/ /RA/ DATE 7/30/14 8/8/14 8/11/14 8/11/14 Letter to Edward from Heather J. Gepford, dated August 11, 2014
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000275 AND 05000323/2014405
DISTRIBUTION w/enclosure
- Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov) Security Specialist/NSIR (Rebecca.Richardson@nrc.goc) Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSI R (Douglas.Garner@nrc.gov) MC&A Statistician (Glen.Tuttle@nrc.gov)
Branch Chief, FCSS/MC&A (Peter.Habighorst@nrc.gov) Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov) Branch Chief, RII DRS/PSB2 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov) Senior Resident Inspector (Thomas.Hipschman@nrc.gov)
Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)
DISTRIBUTION w/o enclosure
- Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Michael.Hay@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Thomas.Hipschman@nrc.gov)
Resident Inspector (John.Reynoso@nrc.gov) Administrative Assistant (Madeleine.Arel-Davis@nrc.gov) Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Acting Senior Project Engineer, DRP/A (Theresa.Buchanan@nrc.gov)
Project Engineer, DRP/A (Brian.Cummings@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Peter.Bamford@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)