IR 05000271/2016002 on 4/11-14/16, 5/16-19/16, 6/11-30/16, Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Vernon, VT
ML16207A502
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/25/2016
From: Racquel Powell
NRC/RGN-I/DNMS/NMSB3
To: Boyle J
Entergy Nuclear Operations
References
IR 2016002
Download: ML16207A502 (12)


Text

July 25, 2016 Mr. Jack Boyle Director, Nuclear Decommissioning

Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station Vernon, VT 05354 SUBJECT: NRC INSPECTION REPORT NO. 05000271/2016 0 0 2 , ENTERGY NUCLEAR OPERATIONS, INC., VERMONT YANKEE NUCLEAR POWER STATION, VERNON, VERMONT

Dear Mr. Boyle:

On June 30, 201 6, the U.S. Nuclear Regulatory Commission (NRC) completed its quarterly inspection under Inspection Manual Chapter 2561, "Decommissioning Power Reactor Inspection Program," at the permanently shut down Vermont Yankee Nuclear Power Station (VY). On-site inspections were performed on April 11-14, and May 16-19, 201 6. In-office reviews of information supplied by Entergy Nuclear Operations, Inc. were also performed during the inspection period. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations, and the conditions of your license. The inspection consisted of observations by the inspector s, interviews with personnel, and a review of procedures and records. The results of the inspection were discussed with Corey Daniels, Senior Manager, Production, and other members of the VY staff on July 11, 2016, and are described in the enclosed report.

No findings of safety significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure(s), and your response, will be made available electronically for public inspection in

the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading

-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.

Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll

-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays).

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406

-2713 No reply to this letter is required. Please contact Steve Hammann, at 610

-337-5399, if you have any questions regarding this matter.

Sincerely,

/RA/ Raymond Powell , Chief Decommissioning and Technical Support Branch Division of Nuclear Materials Safety Docket No.

05000271 License No.

DPR-28 Enclosure:

Inspection Report 05000 271/201 6 0 0 2 w/Attachment cc w/encl:

Distribution via ListServ

EXECUTIVE SUMMARY

Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station NRC Inspection Report No. 05000 271/201 6 0 02 An announced quarterly inspection was completed at Vermont Yankee Nuclear Power Station (VY) on June 30, 201 6. O n-site inspection s were conducted on April 11-14 , and Ma y 16-19 , 201 6. In-office reviews of information supplied by Entergy Nuclear Operations, Inc. (Entergy) were also performed during the inspection period. The inspection included a review of radiation protection (RP), maintenance and surveillance, and fire protection.

The inspection consisted of observations by the inspector s, interviews with Entergy personnel, a review of procedures and records, and plant walk-downs. The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561,

"Decommissioning Power Reactor Inspection Program."

Based on the results of this inspection, no findings of safety significance were identified

.

1 Inspection Report No. 05000271/201600 2

REPORT DETAILS

1.0 Background On January 12, 2015, VY certified the permanent removal of fuel from the reactor vessel [Agencywide Document and Access Management System (ADAMS) Accession No. ML15013A426]. This met the requirements of 10 Code of Federal Regulations (CFR) 50.82(a)(1)(i) and 50.82(a)(1)(ii). On January 20, 2015, the NRC notified VY that the Operating Reactor Assessment Program would cease on January 24, 2015 and that implementation of the Decommissioning Power Reactor Inspection Program would begin on January 25, 2015 (ADAMS Accession No. ML15020A482). As of the end of this reporting period, VY has moved from the "Post Operation Transitional Phase" of decommissioning to the safe storage (SAFSTOR) phase of decommissioning as described in IMC 2561.

2.0 SAFSTOR Performance and Status Review

a. Inspection Scope

[Inspection Procedures (IPs) 62801 , 83750] The inspector s reviewed RP activities and documentation associated with the occupational exposure to determine the effectiveness of site radiological programs. The inspector s accompanied VY RP technician s during a walk

-down of the reactor building refuel floor which included

radiation and contamination surveys, checking and verifying radiological postings, and general area housekeeping.

The inspectors also observed RP technicians performing source checks of instrumentation and providing job coverage of workers in a radiation/contamination area. The inspector s reviewed procedures associated with occupational exposure, 2015 dose totals, radiation work permits, surveys , and worker qualifications to verify radiation work activities were performed effectively to limit worker exposure.

The inspectors also reviewed pre

-and post-radiation surveys related to the reactor vessel draindown.

The inspectors conducted plant tours throughout the inspection period to evaluate the housekeeping and the material condition of structures and components that support decommissioning.

The inspector s observed worker activities and reviewed the completed work package and related procedures for preventative maintenance of the single-failure proof crane on the reactor building refuel floor to verify equipment is being properly maintained. The inspectors also accompanied a site engineer on a surveillance of the spent fuel pool (SFP) heat exchanger pumps. The inspector s also met with VY maintenance and production managers and discussed staffing levels, how routine maintenance and emergent work is requested, prioritized, and scheduled, and reviewed the current maintenance workload.

The inspector s reviewed the backlog of maintenance work to assess the age and prioritization of the items.

The inspectors reviewed the maintenance rule program and procedures, as well as the performance criteria and monitoring procedures of systems and components.

b. Observations and Findings

The inspector s determined that survey records were clear and complete , RP staff effectively controlled work activities

, and technician training and qualifications were up to 2 Inspection Report No. 05000271/2016002 date. The inspectors verified that dose assessments were being performed in accordance with plant procedures and that "As Low as is Reasonably Achievable" dose reports continuously track occupational dose. The inspectors noted that the RP staff is supplemented with contractors on an as needed basis.

The inspectors verified that the maintenance and surveillance program for systems and components had been conducted in accordance with the technical specifications requirements and established procedures. The inspectors noted that throughout the inspection period housekeeping and plant material condition standards were being maintained. The inspectors determined that workers followed work plans, surveillance procedures and industrial safety protocols and were aware of job controls specified in work instructions.

c. Conclusions

Based on the results of this inspection, no findings of safety significance were identified.

3.0 Decommissioning Fire Protection Program (FPP)

a. Inspection Scope

(Inspection Procedure (IP) 64704)

The inspectors performed an inspection to determine whether Entergy maintained the FPP in a state of operational readiness and whether changes made to the program continued to meet commitments and the NRC requirements. The inspection consisted of interviews with Entergy personnel, a review of procedures and records, and plant walk-downs. The inspectors conducted the inspection to:

Verify that the licensee had developed and implemented technically adequate procedures to implement the FPP; Verify the proper installation, operability, and maintenance of fire protection systems and equipment; and Verify the adequacy and implementation of the quality assurance program for the FP P.

Specifically, the inspectors reviewed the updated FPP and a sample of FPP implementation procedures to ensure compliance with the current FPP and to ensure that they reflected the current decommissioning status of the facility. The reviewed procedures included storage of combustibles and flammables, conduct of hot

-work, control of ignition sources, and control of transient combustibles. The inspectors reviewed fire brigade training, training with off

-site responders, qualifications, and responsibilities to ensure they were qualified to participate in firefighting activities. The inspectors performed a walkdown of firefighting equipment and equipment carts to ensure that they were properly maintained, inventoried and ready for use. Pre

-fire plans were reviewed to ensure that they were updated and reflected the plant's decommissioning status.

The inspectors conducted walk

-downs of active plant detection systems, suppression systems, fire barriers, and fire pumps/water sources to ensure that the material condition 3 Inspection Report No. 05000271/2016002 was maintained.

This included a review of fire pump testing to ensure that an adequate water supply was available to the necessary systems and standpipes for fire suppression/firefighting activities. The inspectors performed a focused review of the installed fire detection, suppression systems, and fire barriers in fire areas associated with the SFP, SFP cooling equipment, SFP power supply, and SFP inventory to ensure that they were maintained, surveillances were performed on a periodic basis, and they were capable of performing their intended function. Also, a review of detection and suppression systems for the cable spreading room was performed.

The inspectors reviewed a sample of self

-assessments and corrective action documents to ensure that Entergy was identifying FPP decommissioning deficiencies and entering the issues into the corrective action program for resolution.

b. Observations and Findings

Based on the inspection results, the inspectors concluded that Entergy maintained the FPP within NRC requirements and the FPP. Required fire protection detection systems, suppression systems, barriers, and fire water supply systems were being maintained and appropriately tested and were in a state of operational readiness. The inspectors noted that fire brigade training, qualifications and the conduct of fire drills were adequate. Proper FPP emphasis was placed on SFP systems, components, and support systems

.

During the review of changes made or approved to the VY FPP, the inspector did not identify any issues which reduced the program's effectiveness. The inspector s noted that screenings and evaluations contained the appropriate level of detail and sufficient basis to support the changes.

c. Conclusions

Based on the results of this inspection, no findings of safety significance were identified.

4.0

Exit Meeting Summary

On July 11, 201 6 , the inspector s presented the inspection results, via teleconference, to Corey Daniels, Senior Manager, Production , and other members of Entergy's staff. The inspector s confirmed that proprietary information was not removed from the site

.

A-1 1 Attachment PARTIAL LIST OF PERSONS CONTACTED Licensee M. Anderson, Fire Protection Engineer, Engineering Planning Management G. Bailey, Engineering Programs Supervisor H. Breite, Sr. Lead Engineer C. Chappell, Licensing and CA&A Manager C. Daniels, Plant Manager K. Farabaugh, System Engineer S. Hill, Training D. Holmquist, RP Technician M. McKenney J. Meyer, Licensing M. Pletcher, Radiation Protection and Chemistry Manager S. Shippey, RP Technician T. Silko, Licensing D. Tkatch C. Wamser, Site Vice President K. Whippie, Chemistry Supervisor State of Vermont A. Leshinskie, Engineer ITEMS OPEN, CLOSED, AND DISCUSSED None LIST OF

DOCUMENTS REVIEWED

Condition Reports

CR-VTY-201 5-00305, 01882, 01883, 01891, 01893, 01896, 01897, 02031

CR-VTY-2016-00152, 00218, 00268, 00292, 00331, 00418, 00419, 00423, 00424

Audits and Reports

Fire Protection Audit QA

-9-2016-VY-1, dated 2/24/2016

LO-VTYLO-2015-16, Fire Protection Program Self

-Assessment, dated 11/19/15

Maintenance Rule

-System Annunciator Report, 3/31/2016

Drawings G-191298, Main One Line Wiring Diagram, Rev. 8

G-191163, Sheet 1, Flow Diagram, Fire Protection System Inner Loop, Rev. 54

G-191163, Sheet 2, Flow Diagram, Fire Protection System Outer Loop, Rev. 22

G-191176, Sheet 3, Torus as Condensate Storage Tank, Rev.

Sump Routing Diagram, EC 52085

Evaluations/Engineering Changes

Fire Protection Engineering Evaluation, 5

-Man Fire Brigade Abandonment, Rev. 0

2 Attachment

Evaluations/Engineering Changes

Cont'd EC-49146, Radioactive Waste Disposal System

EC 49915, Abandon Emergency Diesel Generator System, Rev. 0

EC 51405, Abandon all Mechanical Components made Non

-Functional by EC 51464 and

Modify Fire Protection Detection System Logic, Rev. 0

EC 51464, Turbine and Reactor Building Fire

Protection System Modifications, Rev. 0 EC Test 51464

-01, Cut, Cap, Heat Trace and Insulate 8" Reactor Building Fire Protection

Supply in Turbine Building

- Period 1 Implementation Functional Test of Reactor Building

Refueling Floor Fire Hose Standpipes, Rev. 1

EC-52085, Installation of Sump Pumps

Transient Combustible Evaluation 2015

-16, dated 11/24/2015

Pre-Fire Plans

Vermont Yankee Nuclear Power Station Fire Brigade Pre

-Fire Plans, Rev. 9

Procedures

AP-0042, Plant Fire Prevention and Fire Protection, Rev. 9

AP-10088, SAFSTOR Work Schedule Risk Management, Rev. 6

AP-10090, Loss of Large Areas of the Plant due to Fire or Explosion, Rev. 3

DP-4107, Emergency Tools and Supplies Surveillance, Rev. 26

DP 4531, Radioactive Contamination Surveys, Rev. 32 EN-RP-102, Radiological Control, Rev. 4

EN-RP-105-DP, Decommissioning Plant Radiological Work Permits, Rev. 0

EN-RP-106, Radiological Survey Documentation, Rev. 5

MTAP 10084, Work Management Process, Rev. 3

ON-3157, Loss of Fuel Pool Level/Cooling, Rev. 15 OP-3020, Fire Emergency Response Procedure, Rev. 61

OP-3020, Fire Emergency Response Procedure, Rev. 62

OP 4530, Dose Rate Radiation Surveys, Rev. 29

RP-2185, Spent Fuel Pool Makeup System, Rev. 47

SPAD-SOCA-10031, Owner Controlled Area/Security Owner Controlled Area Access Control, Rev. 6 V-EN-DC-127, Control of Hot Work and Ignition Sources, Rev. 16

V-EN-DC-128, Fire Protection Impact Reviews, Rev. 8

V-EN-DC-161, Control of Combustibles, Rev. 10

V-EN-DC-203, Maintenance Rule Program, Rev. 3 V-EN-DC-20 4, Maintenance Rule Scope and Basis, Rev. 4 V-EN-DC-20 5, Maintenance Rule Monitoring, Rev. 6 V-EN-DC-206, Maintenance Rule (a)(1) Process, Rev. 4 V-EN-DC-207, Maintenance Rule Periodic Assessment, Rev. 4 V-EN-RP-101-DP, Decommissioning Plant Access Control for Radiologically Controlled Areas, Rev. 1 VYOPF 0150, Operations Shift Rounds, Rev. 200

Procedures

-Completed Surveillance Procedures

Diesel Fire Pump 18

-Month Surveillance, Completed 9/12/2013 Diesel Fire Pump 18

-Month Surveillance, Completed 10/21/2014

Diesel Fire Pump 18

-Month Surveillance, Completed 7/7/2015

3 Attachment

Procedures

-Completed Surveillance Procedures

Cont'd Electric Fire Pump 18

-Month Surveillance, Completed 6/26/2012

Electric Fire Pump 18

-Month Surveillance, Completed 10/13/2013

Electric Fire Pump 18

-Month Surveillance, Completed 6/7/2015

EN-RP-203, Dose Assessment, Attachment 9.6

OP 4103, Quarterly Fire Brigade Equipment Surveillance, Completed 9/23/2015 OP 4103, Quarterly Fire Brigade Equipment Surveillance, Completed 10/23/2015

OP 4103, Quarterly Fire Brigade Equipment Surveillance, Completed 1/25/2016

OP 4103, 3 Year Hydraulic Check of the Outside Fire Loop, Completed 6/11/2013

Site Fire Prevention Survey, Completed 1/27/2016

V-EN-LI-100, Attachment 9.1, EC

-49146: Abandon Radioactive Waste Disposal System

Licensing Bases Documents

Entergy Letter dated 1/12/2015, Certifications of Permanent Cessation of Power Operation and

Permanent Removal of Fuel from the Reactor Vessel

SEP-FP-VTY-003, Vermont Yankee Fire Protection Program, Rev. 2

SEP-FP-VTY-003, Vermont Yankee Fire Protection Program, Rev. 3

Vermont Yankee Nuclear Power Station Defueled Safety Analysis Report, Rev. 0

Vermont Yankee Nuclear Power Station Fire Hazards Analysis, Rev. 16

Vermont Yankee Nuclear Power Station Technical Requirements Manual, Rev. 56

Vermont Yankee Nuclear Power Station Quality Assurance Program Manual, Rev. 3

Miscellaneous

Dosimetry Exposure Records

- 2015 Letter and Report, Reactor Building Crane Inspection, Simmers Crane Design and Services, May 23, 2016

Letter of Agreement between Entergy Nuclear Vermont Yankee, LLC and Brattleboro Fire

Department, dated 6/11/2015

Letter of Agreement between Entergy Nuclear Vermont Yankee, LLC and Vernon Vermont Fire

Department, dated 6/11/2015

Maintenance Backlog List, May 2016

RWP 20160702, Spent Fuel Pool Cleanout Project

System Performance Monitoring Plan, Service Water

System Performance Monitoring Plan, Standby Fuel Pool Cooling

Survey Logbook # 160066, 160067, 160068 , 160161, 160229, 160230, 160231, 160232, 160236, 160237, 160239, 160244

Transient Combustible Evaluation Log, dated 4/11/2016

National Fire Protection Association 600, Standard on Industrial Fire Brigades, 2010 Edition

Preventive Maintenance Deferral 50042970, P

-40-1B (Electric

-Driven Fire Pump), dated

2/11/2016 Vermont Yankee Dose Rate Assessment Using Monte Carlo Methodology, June 2015

(WMG 13-150-RE-193) Vermont Yankee Cycle 30 Maintenance Rule (a)(3) Periodic Assessment

Vermont Yankee Nuclear Power Station, 10CFR50.65, Maintenance Rule Scoping Document, Standby Fuel Pool Cooling

Vermont Yankee SAFSTOR Program Schedule, dated 3/12/2016

VY Maintenance Rule Memorandum, Expert Panel Meeting Minutes

4 Attachment

Miscellaneous

Cont'd Work Request 386116, Install Compatible Adapters on Hose Stations for Offsite Fire

Departments, dated 3/1/2016

Workgroup Qualification Matrix, Radiation Protection

Training-Fire Brigade Lessons and Plans

SAFSTOR Fire Brigade Training Program Description, dated 12/18/2015

SAFSTOR Fire Brigade Leader Training Program, Fire Brigade Leader Qualification Standard, dated 12/18/2014

SAFSTOR Fire Brigade Leader Training Program, Fire Brigade Member Qualification Standard, dated 12/18/2014

FCBT-SAF-FIREWATCH, Hot Work Fire Watch Training, Rev. 3

FCBT-FP-HWSUPV, Hot Work Supervisor Training, Rev. 3

Training-Fire Brigade Drills and Critiques Announced Fire Drill, Uninterruptible Power Supply

-1B Battery Bank on Reactor Building 318'

(Northeast), Completed on 12/17/2015

Unannounced Fire Drill, Fire in Bus 11 (East of Administration Building), Completed on

1/27/2016 Announced Fire Drill, Shipping and Receiving Areas with Offsite (Vernon Fire Department)

Response, Completed on 9/30/2015

Work Orders

WO 00387775

WO 52381474

WO 52643489

LIST OF ACRONYMS USED

ADAMS Agencywide Document and Access Management System

CFR Code of Federal Regulations

Entergy Entergy Nuclear Operations, Inc.

FPP Fire Protection Program

IMC Inspection Manual Chapter

IP Inspection Procedure

NRC U.S. Nuclear Regulatory Commission

R P Radiation Protection

SFP Spent Fuel Pool

VY Vermont Yankee Nuclear Power Station