ML113330259
| ML113330259 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 11/29/2011 |
| From: | Azua R V NRC/RGN-IV/DRP/RPB-E |
| To: | Schwarz C J Entergy Operations |
| References | |
| Download: ML113330259 (1) | |
Text
November 29, 2011
Christopher J. Schwarz Site Vice President Arkansas Nuclear One Entergy Operations, Inc.
1448 SR 333 Russellville, AR 72802-0967
SUBJECT:
NOTIFICATION OF RELOCATION OF U. S. NUCLEAR REGULATORY COMMISSION REGION IV OFFICES
Dear Mr. Schwarz,
On December 16, 2011, the Region IV offices will be relocat ed to another buildi ng in Arlington, Texas. Beginning December 16, 2011, all routine correspondence should be sent to the following address:
U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511
Should you visit Region IV, visitors will be registered by and receive a Region IV visitor badge from the NRC receptionist office located on the 1 st floor of the building. The NRC is the sole occupant of the building.
The telephone extensions for NRC staff members will remain the same as currently being used; however, the dialing prefix will change to (817) 200-1xxx. If you are unable to reach an NRC staff member, the main switchboard telephone number is (817) 200-1100. Should you or your staff have any questions or require additional information, please contact me at (817) 860-8445 before December 16, 2011, or (817) 200-1445, December 16, 2011 and later.
Sincerely,
/RA/ Ray V. Azua, Acting Chief Reactor Projects Branch E Division of Reactor Projects
Dockets: 50-313; 50-368 Licenses: DPR-51; NPF-6
cc: Electronic Distribution UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125