Dresden Power Station Annual Assessment Mti 1 M ee ti ngReactor Oversight Program -2009Nuclear Regulatory Commission -Region 3Lisle, Illinois April 28, 2010 Purpose of Today's Meeting*A public forum for the discussion of the licensee's performance in 2009
- TheNRCaddressestheperformanceissues 2*The NRC addresses the performance issues identified in the annual assessment letter*The licensee will be provided with an opportunity to respond and inform the NRC
of new or existing progr ams to maintain or improve performance Agenda*Introduction *Review of the Reactor Oversight Process
- National summary of plant performanceDiifDdifi 3*Di scuss i on o f D res den spec ifi c performance results*Licensee response and remarks
- NRC closing remarks
- NRC available to address public questions Region 3 OrganizationMark SatoriusRegional AdministratorCindy PedersonDeputy Regional AdministratorSteve WestDirector Division of Reactor ProjectsAnne Boland Director Division of Reactor Safety 4Gary ShearDeputy Director Ken O'BrienDeputy Director Mark RingBranch ChiefRegional Specialists DresdenSenior Resident InspectorCharles PhillipsResident InspectorDaneira Meléndez-ColónProject and Reactor EngineersJamie BenjaminEllery CoffmanJason DraperDuane Sand Our Mission*To license and regulate the nation's civilian use of byproduct, source, and special nuclearmaterialsto 5 nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the
environment.
Some Nuclear Facts*104 nuclear power plants supply about 20 percent of the electricity in the U.S*Nuclear materials are used inmedicinefordiagnosis 6 in medicine for diagnosis and cancer treatment*Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and
irradiators The NRC Regulates*Nuclear reactors-commercial power reactors, research and test reactors, new reactor designs*Nuclear materials-nuclear reactor fuel, radioactive materials for medical, industrial, and academic use 7*Nuclear waste-transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities*Nuclear security-physical security of nuclear facilities and materials from sabotage or attacks What We Don't Do*Regulate nuclear weapons, military reactors, or space vehicle reactors 8*Own or operate nuclear power plants*Regulate some radioactive materials, such as X-rays and naturally
occurring radon How We Regulate*Establish rules and regulations*Issue licenses
- Provideoversightthroughinspection 9 Provide oversight through inspection , enforcement, and evaluation of operational
experience*Conduct research to provide support for regulatory decisions*Respond to events and emergencies Assurance of Plant Safety*Require "defense-in-depth"*Require long-term maintenance of equipment 10 equipment*Require continual training of operators
- Verify compliance with regulations What We Do -Nuclear Waste*The NRC regulates:-Storage of spent reactor fuel in fuel 11pools or dry storage
casks, and-Any national spent fuel storage site.
What We Do -Nuclear Security*NRC Requires:-Well-armed and well-trained security forces;-Surveillance and perimeterpatrols; 12 perimeter patrols;-State-of-the-art site access equipment and
controls;-Physical barriers and detection zones; and-Intrusion detection systems and alarm
stations.
NRC Performance Goals*Safety: Ensure adequate protection of public health and safety and the
environment 13*Security: Ensure adequate protection in the secure use and management of
radioactive materials Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsPerformance IndicatorResultsStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsPerformance IndicatorResultsStrategicPerformance Areas 14Significance ThresholdAction MatrixSignificance ThresholdRegulatory ResponseSignificance ThresholdAction MatrixSignificance ThresholdRegulatory Response Examples of Baseline Inspections*Equipment Alignment ~80 hrs/yr *Triennial Fire Protection ~250 hrs every 3 yrs*Operator Response ~125 hrs/yrEPd80h/15*Emergency P repare dness ~80 h rs/yr*Rad Release Controls ~110 hrs every 2 yrs*Worker Radiation Protection ~95 hrs/yr*Corrective Action Program ~250 hrs every 2 yrs*Corrective Action Case Reviews ~60 hrs/yr Significance Threshold Performance Indicators Green:Only Baseline InspectionWhite:Increases NRC oversight
Yellow:Increases NRC oversight Red:IncreasesNRCoversight 16 Red: Increases NRC oversight Inspection Findings Green:Very Low safety significance issueWhite:Low to Moderate safety significance issue Yellow:Substantial safety significance issue Red:High safety significance issue Action Matrix ConceptLicenseeResponseRegulatoryResponseDegradedCornerstoneMultiple/Rep.DegradedCornerstoneUnacceptablePerformance 17Increasing Safety SignificanceIncreasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions National Summary of Plant Performance Status as of 12/31/2009Licensee Response 79RegulatoryResponse 24 18Regulatory Response 24Degraded Cornerstone 1Multiple/Repetitive Deg. Cornerstone0 Unacceptable 0Total104 National Summary*Performance Indicator R esults (total for CY 2009)-Green 7039-White18-Yellow 0 19-Yellow 0-Red 0*Total Inspection Findings (total for CY 2009)-Green 879-White7
-Yellow 0-Red 0 2009 Dresden Inspection ActivitiesJanuary 1 -December 31, 2009*Baseline inspections comprised of both Resident Inspector inspections and regional specialist inspections
- Residentbaselineinspections(e.g.,plantstatusreviews, 20 Resident baseline inspections (e.g., plant status reviews, equipment lineup "walkdowns," maintenance and testing verifications, operator qualification observations, refueling and forced outage activity specific inspections)*Regional specialist inspections (e.g., license renewal, plant modifications, security, radiation protection, emergency preparedness)
Resident Inspector Activities*Two full time Resident Inspectors assigned to Dresden that have unfettered access at the site*Monitor plant daily activities and issues (e.g., observe control room turnover and plan of the day tiiditit)21 mee ti ngs, rev iew every con diti on repor t)*Perform independent inspections based on a risk informed approach and knowledge of plant issues*Respond to the station during abnormal occurrences to observe and assess performance
and plant conditions Dresden Overall Assessment ResultsJanuary 1 -December 31, 2009*Exelon operated Dresden Units 2 & 3 ithtdbli 22 in a manner th a t preserve d pu bli c health and safety*All NRC cornerstone objectives were met Dresden Assessment Results*We opened a substantive cross-cutting issue in the Human Performance Area, Work Practice Component, Human Error Prevention Technique
Aspect 23*Unit 2 is in the Licensee Response Column of the NRC Action Matrix. All Green Findings and
Performance Indicators*Unit 3 is in the Regulatory Response Column of the NRC Action Matrix. 1 White finding and all Green
Performance Indicators Safety Significant Findings or PIs*Unit 3 White Finding -Unplanned Control Rod Withdrawals*Licensee was isolating all 177 control rods for maintenance. Non-licensed operators caused three control rods to be partially driven out of the coreSiilthdtidfthUitdStt 24*Si m ilar even t s have occurre d ou t s id e o f th e U n it e d St a t es*Operating Experience was not adequately utilized by the licensee*Reactor remained shutdown
- NRC Information Notice 2010-006, "Inadvertent Control Rod Withdrawal Event While Shutdown" Station Substantive Cross-Cutting Issue in Human Performance*22 overall findings*14 Green findings in 2009 involved a Human Performance Issue*5outofthe14findingssharedthecommonaspectofthe 25 5 out of the 14 findings shared the common aspect of the inadequate usage of human error prevention techniques (i.e.,
self and peer checking, pre-job briefs, proper documentation of activities). H.4(a) (ref. IMC 0310)*These findings affected multiple NRC cornerstone objectives
- The station has not made sufficient progress to date to address this issue Human Performance Issue Examples*FIN 2009002-005: Inadvertent actuation of the standby gas ventilation system*NCV 2009006-001: NRC identified a diesel driven fire pump discharge valve was out of position (i.e., ht)26 s h u t)*NCV 2009005-001: Operations personnel incorrectly placed tags *NCV 2009005-005: Spent fuel assembly moved to the wrong location in the spent fuel pool NRC Inspections Planned for 2010*Baseline annual ROP inspections*Baseline Biennial Problem Identification and Resolution team inspection
- BaselineIndependentSpentFuelStorageInstallation 27 Baseline Independent Spent Fuel Storage Installation inspection*Baseline Triennial Component Design Basis team inspection
- Supplemental "IP 95001" inspection to ensure the licensee has taken adequate corrective actions to address the Unit 3
White finding Licensee Response and RemarksTimHanley 28 Tim HanleySite Vice PresidentExelon Nuclear -Dresden Summary of Dresden Overall Assessment ResultsJanuary 1 -December 31, 2009*Exelon operated Dresden Units 2 & 3 ithtdbli 29 in a manner th a t preserve d pu bli c health and safety*All NRC cornerstone objectives were met Summary of Dresden Assessment Results (continued)*We opened a substantive cross-cutting issue in the Human Performance Area, Work Practice Component, Human Error Prevention Technique Aspect 30*Unit 2 is in the Licensee Response Column of the NRC Action Matrix*Unit 3 is in the Regulatory Response Column of the NRC Action Matrix Open to the Public*The NRC places a high priority on keeping the public and stakeholders informed of its
activities 31*At www.nrc.gov, you can:-Find public meeting dates and transcripts;-Read NRC testimony, speeches, press releases, and policy decisions; and -Access the agency's Electronic Reading Room to find NRC publications and documents.
Contacting the NRC*Report an emergency-(301) 816-5100 (call collect)*Report a safety concern 32-(800) 695-7403 -Allegation@nrc.gov*General information or questions-www.nrc.gov
-Select "What We Do" for Public Affairs NRC Representatives*Gary Shear, Deputy Division Director, DRP(630) 829-9601*Mark Ring, Branch Chief(630) 829-9703*Charles Philli p s , Senior Resident Ins p ector 33p,p(815) 942-9267*Daneira Meléndez-Colón, Resident Inspector(815) 942-9267*Jason Draper, Reactor Engineer (630)829-9814*Ellery Coffman, Reactor Engineer(630) 829-9720 Reference Sources*Reactor Oversight Process-http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/in dex.html 34*Public Electronic Reading Room-http://www.nrc.gov/reading-rm.html*Public Document Room-1-800-397-4209 (Toll Free)