ML101870528

From kanterella
Revision as of 06:54, 13 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Readiness for 95001 Supplemental Inspection
ML101870528
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/06/2010
From: Patricia Anderson
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML101870528 (2)


Text

July 6,2010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Paula Anderson Licensing Manager

SUBJECT:

Palisades Nuclear Plant Readiness for 95001 Supplemental Inspection Palisades Nuclear Plant Docket 50-255 License No. DPR-20

References:

1. EA-09-269, January 20, 2010, Final Significance Determination for a White Finding; Notification of Follow-Up Assessment; and Notice of Violation; NRC Inspection Report No. 05000255/2010007 Palisades Nuclear Plant

Dear Sir or Madam:

On January 20, 2010, the Nuclear Regulatory Commission (NRC) issued a White finding to Entergy Nuclear Operations, Inc. (END) (Reference

1) and an associated violation for the failure to maintain the Region I spent fuel pool storage racks with a Keff s 0.95 when fully flooded with unborated water. In Reference 1 the NRC also requested that END provide notification of readiness for a 95-001 supplemental inspection.

This letter provides notification that END is prepared for that inspection.

Summary of Commitments This letter identifies no new commitments and no revisions to existing commitments.

Document Control Desk Page 2 PKAljlk cc: Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC