IR 05000397/2011402
| ML110390695 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/08/2011 |
| From: | Shannon M P Plant Support Branch-1 |
| To: | Reddeman M E Energy Northwest |
| References | |
| IR-11-402 | |
| Download: ML110390695 (3) | |
Text
"Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this transmitta l document is decontrolled." February 8, 2011
Mr. Mark Chief, Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
SUBJECT: COLUMBIA GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000397/2011402
Dear Mr. Reddemann:
On January 13, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Columbia Generating Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 13, 2011, with Mr. B. Sawatzke, Vice President, Nuclear Generation/Chief Nuclear Officer, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, (ADAMS).
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained
in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
Energy Northwest 2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,/RA/
Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety
Docket No.: 50-397 License No.: NPF-21
Nonpublic
Enclosure:
Inspection Report 05000397/2011402
w/Attachment:
Supplemental Information
cc w/o enclosure:
Don Gregoire Acting Manager, Regulatory Programs Energy Northwest P.O. Box 968, Mail Drop PE20 Richland, WA 99352-0968 Energy Northwest 3 Distribution w/enclosure:
Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN 3D43 Branch Chief, RI DRS (James.Trapp@nrc.gov)
Branch Chief, RII DRS/PSB2 (Michael.Ernstes@nrc.gov)
Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov) Senior Resident Inspector (Ronald.Cohen@nrc.gov)
Distribution w/o enclosure:
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Vacant)
Resident Inspector (Mahdi.Hayes@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)
Project Engineer, DRP/A (Laura.Micewski@nrc.gov)
Site Administrative Assistant (Crystal.Myers@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource OEDO RIV Coordinator (James.Trapp@nrc.gov)
Report:
SUNSI Review Completed: ETB ADAMS: Yes G No Initials: ETB G Publicly Available O Non-Publicly Available O Sensitive G Non-Sensitive Letter Only: SUNSI Review Completed: ETB ADAMS: Yes Initials: ETB Publicly Available Non-Sensitive SPSI:PSB1 PSI:PSB1 PSI:PSB1 C:PSB1 C:PBA C:PSB1 ETByre MBrooks JRollins MPShannon WWalker MPShannon /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ 2/3/11 2/5/11 2/7/11 2/7/11 2/7/11 2/8/11 OFFICIAL COPY T=Telephone E=E-Mail F=FAX