ML16235A079
| ML16235A079 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 08/31/2016 |
| From: | Scott M L Division Reactor Projects I |
| To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
| Kennedy S | |
| References | |
| Download: ML16235A079 (6) | |
Text
[Type here]
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406
-2713 August 31, 2016 Mr. Bryan Hanson Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.
Warrenville, IL 60555
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR OYSTER CREEK NUCLEAR GENERATING STATION (REPORT 05000219/2016005)
Dear Mr. Hanson:
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid
-cycl e performance review of Oyster Creek Nuclear Generating Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 201 5 , through June 30, 201
- 6. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at Oyster Creek Nuclear Generating Station during the most recent quarter was within the Regulatory Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because one finding of White significance, associated with the Mitigating Systems cornerstone, was identified in the first quarter 2016 integrated inspection report (ADAMS Accession No. ML16132A 436). The finding was associated with inadequate work instruction to replace the Emergency Diesel Generator (EDG) cooling flexible coupling hoses as specified by Exelon's procedure and vendor information.
The final significance determination and follow
-up assessment letter for this finding was issued on July 6 , 2016 (ML16188A014). In that letter we informed you that Oyster Creek had transitioned to the Regulatory Response Column of the ROP Action Matrix retroactive to the first quarter of 2016. On June 14, 2016, your staff notified the NRC of your readiness for the NRC to conduct a supplemental inspection to review the actions taken to address the performance issues. Therefore, in addition to ROP baseline inspections, the NRC conduct ed a supplemental inspection in accordance with Inspection Procedure (IP) 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," during the week of July 25, 2016.
The objectives of the 95001 inspection were to provide assurance that the root cause and contributing causes of risk significant performance issues were understood, the extent of condition and extent of cause were understood, and the corrective actions were sufficient to address the root and contributing causes and prevent recurrence. The NRC determined that Exelon met the objectives of IP 95001. The NRC closed the White finding and notified you of the results of this inspection via follow-up assessment letter and Inspection Report 05000219/2016011 dated August 1 0, 2016, (ML16228A053) which also informed Exelon that Oyster Creek w i l l remain in the Regulatory Response Column for a full four quarters following the identification of the White finding in January 2016.
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last half of the inspection period in the inspection plan are tentative
and may be revised at the end
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.
The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non
-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA 049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
-Design-Basis External Events," and Order EA 051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Final Safety Evaluation for Oyster Creek.
After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued.
Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
-Unit Dose Assessment Plans."
In Staff Requirements Memorandum
- SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities,"
(ADAMS Accession # ML16104A158) the Commission approved the NRC staff recommendation to discontinue the formal mid
-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct assessment reviews and communicate changes in the assessment of licensee performance quarterly, and will also issue
end-of-cycle assessment letters.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
ADAMS is accessible from the NRC's Website at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact Silas Kennedy at (610) 337
-5046 with any questions you have regarding this letter. Sincerely, /RA/ Michael L. Scott , Director Division of Reactor Projects Docket No.
50-219 License No.
Enclosure:
Inspection Plan
Please contact Silas Kennedy at (610) 337
-5046 with any questions you have regarding this letter. Sincerely, /RA/
Michael L. Scott , Director Division of Reactor Projects Docket No.
50-219 License No.
Enclosure:
Inspection Plan DISTRIBUTION w/encl
- DDorman, RA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS SKennedy, DRP SShaffer, DRP MHenrion, DRP SElkhiamy, DRP APatel, DRP, SRI EAndrews, DRP, RI JDeVries, DRP, AA JBowen, RI, OEDO RidsNrrPMOysterCreek Resource RidsNrrDorlLpl1
-2 Resource ROPreports Resource RMcKinley, DRS JNoggle, DRS MGray, DRS PKrohn, DRS CCahill, DRS DJackson, DRS NMcNamara, RI, SLO DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource DOCUMENT NAME:
S:\ROP Assessment Meetings
\ROP-17 Mid-Cycle Review
\Branch 6\Oyster Creek
\OC ROP-17 Mid-Cycle Letter Final.docx ADAMS ML16235A079 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME SRKennedy/SWR for SShaffer/SWR M LScott/MLScott DATE 08/17/16 08/17/16 08/19/16 OFFICIAL RECORD COPY
Page 1 of 2 07/18/2016 13:25:13 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteOyster CreekInspection / Activity Plan 07/01/2016
-06/30/20187111121-CDBI 6 1 IP Component Design Bases Inspection7111121 06/27/2016 07/01/2016 1 IP Component Design Bases Inspection711112107/11/2016 07/15/2016 95001-FOLLOW UP FOR WHITE NOV (FLEX HOSE-EDG) 2 1 IP Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 95001 07/25/2016 07/29/2016 PI&R-BULK DRYWELL TEMPERATURE 1 1 IP In-depth Reviews71152-Reviews 08/22/2016 08/24/201671124-01 EXPOSURE CONTROL 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 08/29/2016 09/01/201671124-02 ALARA 1 1 IP Occupational ALARA Planning and Controls71124.02 08/29/2016 09/01/20167111108G-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - BWR7111108G 09/26/2016 09/30/2016 EP-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing7111402 09/26/2016 09/30/2016 1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 09/26/2016 09/30/2016 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 09/26/2016 09/30/201671124-01EXPOCONTROL02 ALARA 03 AIRBORNE04 DOSE 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/26/2016 09/30/2016 1 IP Occupational ALARA Planning and Controls71124.02 09/26/2016 09/30/2016 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/26/2016 09/30/2016 1 IP Occupational Dose Assessment71124.04 09/26/2016 09/30/201671152BI-PI&R BIENNIAL 4 1 IP Problem Identification and Resolution71152B 10/31/201611/04/2016 1 IP Problem Identification and Resolution71152B11/14/201611/18/201671124-71151 PI VERIFY 71124.01 .02 .03 .04 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.0111/07/201611/11/2016 1 IP Occupational ALARA Planning and Controls71124.0211/07/201611/11/2016 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0311/07/201611/11/2016 1 IP Occupational Dose Assessment71124.0411/07/201611/11/2016 1 IP Occupational Exposure Control Effectiveness71151-OR0111/07/201611/11/2016 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR0111/07/201611/11/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 2 07/18/2016 13:25:13 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteOyster CreekInspection / Activity Plan 07/01/2016
-06/30/201871124-71124.01 RAD EXPOSURE CONTROL 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/06/2017 03/09/20177111105T-TRIENNIAL FIRE PROTECTION 4 1 IP Fire Protection [Triennial]7111105T 03/20/2017 03/24/2017 1 IP Fire Protection [Triennial]7111105T 04/03/2017 04/07/20177111111B-OYSTER CREEK REQUAL INSP W/ P/F RESULTS 2 1 IP Licensed Operator Requalification Program7111111B 06/05/2017 06/09/201771124-RAD ENV TEAM INSPECT 71124.05 06 07 3 1 IP Radiation Monitoring Instrumentation71124.05 06/19/2017 06/23/2017 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 06/19/2017 06/23/2017 1 IP Radiological Environmental Monitoring Program71124.07 06/19/2017 06/23/2017 EP-EP EXERCISE EVALUATION 4 1 IP Exercise Evaluation7111401 09/25/2017 09/29/2017 1 IP Performance Indicator Verification71151 09/25/2017 09/29/201771124-71151PI VERIFY71124.01RADEXP 05 RAD MONT 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.0111/06/201711/09/2017 1 IP Radiation Monitoring Instrumentation71124.0511/06/201711/09/2017 1 IP Occupational Exposure Control Effectiveness71151-OR0111/06/201711/09/2017 1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR0111/06/201711/09/201771124.08-RADWASTE 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 02/05/2018 02/09/20187111117T-PERMANENT PLANT MODIFICATIONS 3 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 01/29/2018 02/02/2018 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 02/12/2018 02/16/2018HEAT-TRIENNIAL HEAT SINK 1 1 IP Heat Sink Performance7111107T 03/19/2018 03/23/201871124.01-01 EXPOSURE CONTROL 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/21/2018 05/24/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.