IR 07200043/2018401

From kanterella
Revision as of 06:49, 5 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation - Security Inspection Report 07200043/2018401 (DRS-E.Bonano)
ML18152A779
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 05/31/2018
From: Orth S K
Plant Support Branch II
To: Arnone C
Entergy Nuclear Operations
References
IR 2018401
Download: ML18152A779 (7)


Text

May 31, 2018

Mr. Charles Arnone Vice President, Operations Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 490439530

SUBJECT: BIG ROCK POINT INDEPENDENT SPENT FUEL STORAGE INSTALLATIONSECURITY INSPECTION REPORT 07200043/2018401

Dear Mr. Arnone:

On May 3, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the Physical Protection Program for the Big Rock Point Independent Spent Fuel Storage Installation located in Charlevoix, Michigan. The NRC inspectors discussed the results of this inspection with Mr. Horan and other members of your staff. The results of this inspection are documented in the enclosed report. The NRC inspectors did not identify any finding or violation of more-than-minor significance. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.htm and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations If you choose to provide a response that contains Security-Related Information, please mark -Related InformationWithhold from public disclosure under 10 withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,/RA Gregory Hansen Acting for/ Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No.72-043 License No. General License (ISFSI)

Enclosure:

IR 07200043/2018401 cc: Distribution via LISTSERV

SUMMARY

The U.S. Nuclear Regulatory Commission continued monitoring the conducting an inspection of the Physical Protection Program for the Independent Spent Fuel Storage Installation, in accordance with the Spent Fuel Storage Oversight Process. The Spent Fuel Storage Oversight Process is the U.S. Nuclear Regulatory Commissionprogram for overseeing the safe storage of spent nuclear fuel. Refer to https://www.nrc.gov/waste/spent-fuel-storage/oversight.html for more information. List of Findings and Violations No findings or violations were identified. Additional Tracking Items None

3

INSPECTION SCOPES

Inspection was conducted using the appropriate portions of the Inspection Procedure 81311, for Independent Spent Fuel Storage Installations. The procedure was declared complete when the inspection procedure requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2690, ent Fuel Storage Installations a The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

81311Physical Security Requirements for Independent Spent Fuel Storage Installations (Complete) The inspectors evaluated the Physical Protection Program for the Independent Spent Fuel Storage Installation. The following elements were evaluated: 02.01 (af)

INSPECTION RESULTS

No findings or violations were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors confirmed that proprietary information was controlled to protect from public disclosure. The inspectors verified no proprietary information was retained or documented in this report.

On May 3, 2018, the inspectors presented the security inspection results to Mr. Horan and other members of the licensee staff.

DOCUMENTS REVIEWED

81311Physical Security Requirements for Independent Spent Fuel Storage Installations - Volume 1 D1.13; Big Rock Point Access Authorization Program for Company/Noncompany Employees; Revision 12 - Volume 7F; Independent Spent Fuel Storage Installation (ISFSI) Security Plan; Revision 7 - Volume 7G; ISFSI Security Implementing Procedures, Chapter 1Security Organization; Revision 8 - Volume 7G; ISFSI Security Implementing Procedures, Chapter 2Facility Environs; Revision 8 - Volume 7G; ISFSI Security Implementing Procedures, Chapter 3Protected Area Perimeters; Revision 8 - Volume 7G; ISFSI Security Implementing Procedures, Chapter 4Central Alarm Station; Revision 8

- Volume 7G; ISFSI Security Implementing Procedures, Chapter 5Test, Inspections and Maintenance; Revision 8 - Volume 7G; ISFSI Security Implementing Procedures, Chapter 6Security Records; Revision 8 - Volume 7G; ISFSI Security Implementing Procedures, Chapter 7Security Audits; Revision 8 - Big Rock Point Independent Spent Fuel Storage Installation (ISFSI) Authorized Unescorted Personnel List; 04/2015 through 04/2018 - Big Rock Point ISFSI Work Request Log; CY 2016 through CY 2018 - Weapons Monthly Maintenance Logs; 01/2017 through 12/2017 - Independent Spent Fuel Storage Installation Security Systems Maintenance Log Weekly Testing; 01/2017 through 12/2017 - Big Rock Point Security Self-Assessment - 2016; 04/27/16 - Big Rock Point Security Self-Assessment - 2018; 03/7/18 - QA-3-7-9-14-16-18-2015-BRP-1; Entergy, Palisades Power Plant Quality Assurance Audit Report Big Rock Point; 09/17/2015 through 10/26/2015 - QA-3-7-9-14-16-18-2017-BRP-1; Entergy, Palisades Power Plant Quality Assurance Audit Report Big Rock Point; 09/05/2017 through 09/28/2017 - Glock Armorer Certification; 02/09/2016 - 07/25/2017 - National Rifle Association Law Enforcement Firearm Instructor Certification (Handgun and Shotgun); Expiration 11/18/2020 - Security Officer CY 2017 and CY 2018 Individual Qualification Records (Sample 6 Security Officers) - IEPIP 35A-02; Independent Spent Fuel Storage Installation (ISFSI) Emergency Response Organization Responsibilities; Revision 19 - IEPIP 35A-02, Table 5.0.1; Emergency Action Levels (EALs); Revision 19 - State of Michigan, Department of State Police, Post Commander, Gaylord Post, Letter of Agreement; 12/18/2017 - Office of the Sheriff, Charlevoix County, Letter of Agreement; 12/18/2017 - ISFSI Semi Annual Key Inventory; 01/2016 through 05/2018 - ISFSI Semi Annual Key and Padlock Inventories; 01/2016 through 05/2018 - ISFSI Semi Annual Protected Area Key Inventory; 01/2016 through 05/2018 - Semi Annual Safeguards Combination Locks Inventory; 01/2016 through 05/2018 - CR-PLP-2018-00058; Loss of Alarm Capabilities and Remote Monitor Function; 01/04/2018 - CR-PLP-2018-00398; Security Remote Monitor Out of Service; 01/23/2018 - CR-PLP-2018-00926; Security Officer did not Receive a Passing Score on a Requalification Exam; 02/22/2018 - CR-PLP-2018-02003; Security Officer did not Receive a Passing Score on a Requalification Exam; 04/25/2018