JAFP-14-0097 August 15, 2014
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Request for Additional Time to Respond to Request for Additional Information (RAI) Associated with Near-Term Task Force (NTTF) Recommendation 2.1, Seismic Hazard and Screening Report James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-059
Reference:
- 1. NRC letter to Entergy, Request for Information (RFI) Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the NTTF Review of Insights from the Fukushima Dai-ichi Accident, ML12053A340, dated March 12, 2012 2. Entergy Letter to NRC, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC RFI Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the NTTF Review of Insights from the Fukushima
Dai-ichi Accident, JAFP-14-0039, dated March 31, 2014 3. NRC Letter to Entergy, Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Hazard and
Screening Report, ML14195A097, dated July 16, 2014
Dear Sir or Madam:
On March 12, 2012, the NRC issued Reference 1 to all power reactor licensees. By Reference 2, Entergy Operations, Inc. (Entergy) provided the Seismic Hazard and Screening Reports for James A. FitzPatrick requested by Reference 1. In Reference 3, the NRC issued RAIs related to these reports with a response requested by August 15, 2014. Entergy requests additional time to respond to the RAIs in order to process final reviews and certification. The NRC was consulted and agreed with a new response date of August 21, 2014. Entergy Nuclear NortheastEntergy Nuclear Operations, Inc. James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840 Chris M. Adner Regulatory Assurance Manager - JAF JAFP-14-0097 Page 2 of 2 This letter contains no new regulatory commitments.
If you have any questions regarding this report, please contact Chris M. Adner, Regulatory Assurance Manager, at 315-349-6766.
alfltZL--Chris M. Adner Regulatory Assurance Manager CMA/mh cc: NRC Regional Administrator NRC Resident Inspector Mr. Douglas Pickett, Senior Project Manager Mr. Michael Balazik, Project Manager Ms. Bridget Frymire, NYSPSC Mr. Francis J. Murray Jr., President NYSERDA Page 2 of 2