Official Use Only-Security-Related InformationOfficial Use Only-Security-Related Information April 23, 2007 Mr. Pete Dietrich Site Vice President
Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant
Post Office Box 110
Lycoming, NY 13093
SUBJECT:
JAMES A. FITZPATRICK NUCLEAR POWER PLANT - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION - REPORT
05000333/2007201 Dear Mr. Dietrick
On March 22, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting (MC&A) safeguards program inspection at the James A. FitzPatrick
Nuclear Power Plant. The enclosed inspection report documents the inspection findings, which
were discussed with you and other members of y our staff during an exit meeting on that date .
The inspection examined activities conducted under your license as they relate to safety, security and compliance with the Commission's rules and regulations and with the conditions of
your license. The inspectors reviewed selected procedures and records, observed storage of
special nuclear material in the spent fuel pool, and interviewed personnel. Areas examined
during the inspection included physical inventory and accounting records.
Based on the results of this inspection, no findings of significance were identified. However, a licensee-identified violation, which was determined to be of very low safety significance is
discussed in the report. The NRC is treating this violation as a non-cited violation (NCV)
consistent with Section VI.A.1 of the Enforcement Policy because of the very low safety
significance of the violation and because it was corrected prior to this inspection. If you contest
this non-cited violation you should provide a response within 30 days of the date of this report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control
Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; Office
of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the
NRC Resident Inspector at FitzPatrick.
When separated from the Enclosure, this document is DECONTROLLED.
Official Use Only-Security-Related InformationOfficial Use Only-Security-Related Information In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, will be available electronically for public inspection in the NRC Public Document Room or from the Public Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room). However, because of the security-related concerns contained in the
enclosure, and in accordance with 10 CFR 2.390, this letter's enclosure will not be available for
public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from NRCs document system ADAMS. If Safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire
response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the
instructions for withholding in 10 CFR 2.390(b)(1).
Should you have any questions concerning this report, please contact Martha Williams at (301) 415-7878 or Dori Votolato at (301) 415-7633.
Sincerely,
/RA/
Ralph Costello, Acting Chief Reactor Oversight Branch
Division of Security Operations
Office of Nuclear Security and Incident Response Docket No. 50-333 License No. DPR-59
Enclosure:
MC&A Inspection Report 05000333/2007201 w/
Attachment:
Supplemental Information cc w/enclosure: Attached list Official Use Only-Security-Related InformationOfficial Use Only-Security-Related Information In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, will be available electronically for public inspection in the NRC Public Document Room or from the Public Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room). However, because of the security-related concerns contained in the
enclosure, and in accordance with 10 CFR 2.390, this letter's enclosure will not be available for
public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from NRCs document system ADAMS. If Safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire
response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the
instructions for withholding in 10 CFR 2.390(b)(1).
Should you have any questions concerning this report, please contact Martha Williams at (301) 415-7878 or Dori Votolato at (301) 415-7633.
Sincerely,
/RA/
Ralph Costello, Acting Chief Reactor Oversight Branch
Division of Security Operations
Office of Nuclear Security and Incident Response Docket No. 50-333 License No. DPR-59
Enclosure:
MC&A Inspection Report 05000333/2007201 w/
Attachment:
Supplemental Information cc w/enclosure: Attached list Distribution w/encl
- DRiffle, NSIRJWilliams, NSIR TShedlosky, NSIR JRobinson, NRR JBoska, NRRECobey, RIGHunegs,RIDDempsey,RI CAdkinson, NSIRAMcLeod, NSIR
- See Previous ConcurrencePackage: ML070950351 Cover Letter: ML070950306
Enclosure:
ML070950330 Log-In #OFFICEDSO/RSOBEDSO/RSOBERIDSO/RSOBNAMEDVotolatoMWilliamsJWhiteby phone RCostelloDATE04/23/0704/23/0704/23/0704/23/07INDICATE IN BOX: "C"=COPY W/O ATTACHMENT/ENCLOSURE, "E"=COPY W/ATT/ENCL, "N"=NO COPY OFFICIAL RECORD COPYP. Dietrich Official Use Only-Security-Related InformationOfficial Use Only-Security-Related Information cc w/enclosure:
Peter Smith, President New York State Energy Research & Development Authority
17 Columbia Circle
Albany, NY 12203-6399 cc w/o enclosure:
G. Taylor, CEO, Entergy Operations, Inc.
M. Kansler, President, Entergy Nuclear Operations, Inc (ENO)
J. Herron, Sr, VP and Chief Operating Officer, (ENO)
C. Schwarz, VP, Operations Support (ENO)
K. Mulligan, General Manager, Plant Operations (ENO)
O. Limpias, VP, Engineering (ENO)
J. McCann, Director, Licensing (ENO)
C. Faison, Manager, Licensing (ENO)
M. Colomb, Director of Oversight (ENO)
D. Wallace, Director, Nuclear Safety Assurance (ENO)
J. Costedio, Manager, Regulatory Compliance (ENO)
T. McCullough, Assistant General Counsel (ENO)