IR 05000336/2007402
| ML072670124 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/20/2007 |
| From: | Trapp J M Plant Support Branch 1 |
| To: | Christian D A Dominion Resources |
| References | |
| IR-07-402 | |
| Download: ML072670124 (6) | |
Text
September 20, 2007
Enclosure Contains Safeguards Information.When Separated from enclosure, this document is not Safeguards Information.Mr. David A. ChristianSr. Vice President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard Glenn Allen, VA 23060-6711
SUBJECT: MILLSTONE POWER STATION - NRC PHYSICAL SECURITY BASELINEINSPECTION REPORT NOS. 05000336/2007402 AND 05000423/2007402
Dear Mr. Christian:
On August 24, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection at your Millstone Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on August 24, 2007, with Mr. Alan Price, Site Vice President Millstone Station, and other members of your staff. The inspection examined activities conducted under your licenses as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Warning: Violation of section 147 of the AtomicEnergy Act, "Safeguards Information" is subject to civil and criminal penalties DETERMINATION MADE BY:
NAME/TITLE: James M. Trapp, ChiefORGANIZATION: RI/DRS/PSB1 BASIS - DG-SG-1 (300) Physical Protection Program SIGNATURE___D. Caron_for:______ DATE: 09/20/07 Mr. D. Christian2 Mr. D. Christian3 No findings of significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related information contained inthe enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,/RA/James M. Trapp, ChiefPlant Support Branch 1 Division of Reactor SafetyDocket Nos.50-336, 50-423License Nos.DPR-65, NPF-49Non-Public
Enclosure:
Inspection Report Nos. 05000336/2007402 and 05000423/2007402
w/Attachment:
Supplemental Information(CONTAINS (SGI)
ML072670124After declaring this document "An Official Agency Record" it will be released to the Public.To receive a copy of this document, indicate in the box:
" C" = Copy without attachment/enclosure " E" = Copywith attachment/enclosure " N" = No copyOFFICERI/DRSERI/DRSRI/DRSRI/DRPRI/DRSNAMEGSmithPFrechetteDCaron RPowellJTrappDATE09/20/0709/20/0709/20/0709/20/0709/20/07 Mr. D. Christian3 cc w/encl; w/SGIJ. Campbell, Site Security Manager, Millstone Station E. Wilds, Director, State of Connecticut SLO Designee F. Tabert, Assistant Director, NY State Dept of Homeland Security M. Balboni, Deputy Secretary for Public Safety, New Yorkcc w/o encl w/o SGI:J. A. Price, Site Vice President, Millstone StationC. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control C. Meek-Gallagher, Commissioner, Suffolk County, Department of Environment and Energy V. Minei, P.E., Director, Suffolk County Health Department, Division of Environmental Quality R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)
S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)
R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York P. Tonko, President and CEO, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority N. Burton, esq. Mr. D. Christian4 Distribution w/o encl w/o SGI