ML081970323

From kanterella
Revision as of 00:41, 10 February 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Facility Change Report for the Period from March 1, 2006 to February 29, 2008
ML081970323
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 07/11/2008
From: Reilly J T
Southern California Edison Co
To:
Document Control Desk, NRC/FSME
References
Download: ML081970323 (1)


Text

SOUTHERN CALIFORNIA EDISON°An EDISON INTERNATIONAL Company James T. Reilly Vice President July 11, 2008 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Subject:

Docket No. 50-206 Facility Change Report San Onofre Nuclear Generating Station Unit 1

Dear Sir or Madam:

This letter provides the Facility Change Report required by 10 CFR 50.59(d)(2) for San Onofre Unit 1 for the period from March 1, 2006 to February 29, 2008. There were no 50.59 evaluations identified for Unit 1 in this reporting period.There are no regulatory commitments made in this letter.If you would like any additional information, please contact Ms. L. T. Conklin at (949) 368-9443.cc: E. E. Collins, Regional Administrator, NRC Region IV J. C. Shepherd, NRC Project Manager, San Onofre Unit 1 J. E. Whitten, NRC Region IV, San Onofre Unit 1 G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P.O. Box 128 San Clemente, CA 92674-0128 949-368-3780 Fax 949-368-3770-IGL7