LR-N12-0253, Voluntary Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Revision as of 10:45, 8 February 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Voluntary Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations
ML12286A381
Person / Time
Site: Salem  PSEG icon.png
Issue date: 10/05/2012
From: Fricker C J
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N12-0253
Download: ML12286A381 (4)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 OCT 52012 o PSEG Nu clear LL C LR-N 12-0253 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Nuclear Generating Station Units 1 and 2 Facility Operating License Nos. DPR-70 and 75 NRC Docket Nos. 50-272 and 50-311

SUBJECT:

Reference:

Voluntary Response to NRC Regulatory Issue Summary 2012-07 Preparation and Scheduling of Operator Licensing Examinations NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations, Dated June 8, 2012 PSEG Nuclear LLC (PSEG) is providing the enclosed information for Salem Units 1 and 2 as requested in the above reference.

There are no regulatory commitments contained in this letter. Should there be any questions regarding this matter, please contact Jack Carney, Operations Training Manager, at (856) 339-1801.;Sincere y, CIJ.Fricker Site Vice President

-Salem~y~L Page 2 LR-N12-0253 C Mr. W. Dean Regional Administrator Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard Renaissance Park King of Prussia, PA 19406 Mr. D. E. Jackson Chief, Operational Safety Branch Division of Reactor Safety U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard Renaissance Park King of Prussia, PA 19406 Mr. J. Hughey, Project Manager -Salem U.S. Nuclear Regulatory Commission Mail Stop 08BIA Washington, DC 20555-0001 US NRC Resident Inspector Office -Salem (X24)Mr. P. Mulligan, Manager, IV Bureau of Nuclear Engineering P.O. Box 415 Trenton, NJ 08625 Site Nurse -Medical -Salem (N06)Training Director -Salem (120)Salem Commitment Tracking Coordinator (X25)

Enclosure 1 LR-N 12-0253 SALEM UNITS 1 AND 2 Docket Nos. 50-272 and 50-311 Operator Licensing Examination Data (NRC Form 536)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/30/2014 (9-2011) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations.

Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Salem Generating Station Units I and 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 NUMBER OF REACTOR 7 4 8 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 11 8 10 0 NUMBER OF SENIOR REACTOR OPERATORS

-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS

-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 12/8/2014 11/30/2015 11/14/2016 ALTERNATE DATE 12/15/2014 12/7/2015 11/28/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 18 CANDIDATES NRC FORM 536 (9-2011)