ML18204A085

From kanterella
Revision as of 23:17, 22 January 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Columbia Generating Station - Concerning IE Circular 76-02, Shock Suppressors of the Hydraulic Type Are Not Used for Project WNP-2
ML18204A085
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/09/1976
From: Renberger D L
Washington Public Power Supply System
To: Engelken R H
NRC/RGN-V
References
IEC-76-02
Download: ML18204A085 (1)


Text

P 5 S~Q~f..g Washin on Public Power Supply Syst~A JOINT OPERATING AGENCY P O BOX 968 3000 GEO, WASHINGTON WAY RICHLAND, WASHINGTON 99352 PHONC(5091 946~1611 December 9, 1976 G02-76-540 Nuclear Regulatory Commission Region V Suite 202, Walnut Creek Plaza 1900 N.California Boulevard Walnut Creek, California 94596~C~"o.o~o<j-'""<wy v'~-Cg I Attention:

Mr.R.H.Engelken Director

Subject:

WPPSS NUCLEAR PROJECT NO.2 IE CIRCULAR NO.76-05 DOCKET NUMBER 50-397

Reference:

Letter, R.H.Engelken to J.J.Stein, same subject, dated October 8, 1976

Dear Mr.Engelken:

The Supply System has requested our A/E to review the appli-cability of the subject circular to Project WNP-2.Our A/E reports that IE Circular 76-02 does not apply to WNP-2, since shock suppressors of the hydraulic type are not utilized for this project.Very truly yours, DLR:GLC:ho D.L.RENBERGER Assistant Director Gener ation and Technology cc: Mr.D.iRoe-Bon'neville Power Administration NRC-Office of Inspection 5 Enforcement (Washington, D.C.)