August 16, 2012
Mr. Eric W. Olson
Site Vice President
Entergy Operations, Inc.
River Bend Station
5485 U.S. Highway 61
St. Francisville, LA 70775
SUBJECT: RIVER BEND STATION
- NRC AUGMENTED INSPECTION TEAM FOLLOW-UP INSPECTION PLANNING LETTER, INSPECTION REPORT 05000458/2012010
Dear Mr. Olson
- The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV staff will conduct
an augmented inspection team follow
-up inspection at your River Bend Station. The inspection will be comprised of resident inspectors and
a regional reactor inspector
from the NRC Region
IV office. The inspection will be conducted in accordance with Inspection Procedure 93800 and multiple reactor oversight process
baseline inspection procedures.
The schedule for the inspection is as follows:
In-office preparation
- September 10 - 14, 2012 Onsite inspection
- September 17 - 21, 2012 This inspection is resource intensive both for the NRC inspectors and your staff.
In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. Please note that the documents
are requested to be provided by September 4, 2012. In addition, we request that appropriate
personnel knowledgeable
of each of the unresolved items documented in NRC Inspection Report 0500458/201200 9 be available to support the inspector s during the onsite inspection week. We have discussed
th is inspection activit
y with your staff. If there are any questions about this inspection or the material requested, please contact the team lead , Brian Tindell
, at 254-897-1500 or by email
at brian.tindell@nrc.gov
. U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V1600 EAST LAMAR BLVD
A R L I N G T O N , T E X A S 7 6 0 1 1-4511
E. Olson - 2 - This letter does
not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control No. 3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget
Control No. I n accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely, /RA/ Vincent G. Gaddy, Chief Project Branch C Division of Reactor Projects
Docket: 05000458 License: NPF-4 7 Enclosure: Augmented Inspection Team Follow
-up Inspection Document Request
c c w/ encl: Electronic Distribution
E. Olson - 3 - Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Alan.Howe@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Patrick.Louden@nrc.gov)
Senior Resident Inspector (Grant.Larkin@nrc.gov)
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)
Resident Inspector (Andy.Barrett@nrc.gov)
RBS Administrative Assistant (Lisa.Day@nrc.gov)
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
RIV/ETA: OEDO
(Silas.Kennedy@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
R:\_REACTORS\_RB\2012\RBS 20120 10 Inspection Planning Ltr.doc SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials
VGG Publicly Avail
Yes No Sensitive Yes No Sens. Type Initials
VGG RI:DRP/A BC:DR P/C BTindell VGGaddy /RA via Email /RA/ 08/16/2012 08/16/2012 OFFICIAL RECORD COPY
T=Telephone E=E
-mail F=Fax
- 1 - Enclosure Augmented Inspection Team Follow
-up Inspection Document Request
Inspection Dates:
In-office preparation: September 10
- 14, 2012 Onsite: September 17
- 21, 2012 Inspection Procedures:
IP 93800 , Augmented Inspection Team
Various Reactor Oversight Process
Baseline Inspection Procedures
Team Lead: Brian Tindell, Resident Inspector, Comanche Peak NPP
The following information should be sent to the Region IV office in hard copy or electronic format in care of Brian Tindell
, by September 4, 2012. Please provide requested documentation electronically if possible. Also, we request that you categorize the documents with the numbered list below.
If you are unable to send the requested information, please inform the inspector s and provide the documentation during the first day of the onsite inspection. The inspector s will request additional documents during the
preparation and
onsite inspection week s. If you have any questions regarding this information request, please contact
the team lead. For the following items from Augmented Inspection Team Inspection
Report 050004 58/201200 9 , please provide current copies, as applicable, of related condition reports, work orders, root cause analysis and/or apparent cause evaluations , system design criteria
, vendor manuals, UFSAR descriptions, technical specification requirements, technical requirements manual requirements, fire protection report
descriptions, procedures, drawings, plant safety index records, fire incident report
s , scram reports, industry operating experience screening s , and post-event risk analysis
- 1. Main Control Room Annunciator Control and Conduct of Operations
2. Past Operability of the Reactor Core Isolation Cooling System
3. Implementation of the Procedure for Infrequently Performed Tests or Evolutions
4. Corrective Action Program Implementation for Prior Lockout Relay Failure in
February 2011 5. Implementation of Vendor and Industry Recommended Relay Testing and Maintenance
6. Implementation of the Station Cable Reliability Program
7. Onsite Safety Review Committee Implementation
8. Ability to Promptly Staff the Fire Brigade at All Times During Plant Operation
- 2 - Enclosure Inspector Contact Information: