ML18334A096

From kanterella
Revision as of 22:55, 17 January 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

the University of Texas at Austin Request for Extension of Date to Provide a Schedule for Completion of Neutronic and Thermal-Hydraulic Analyses
ML18334A096
Person / Time
Site: University of Texas at Austin
Issue date: 11/14/2018
From: Charlton W S, Whaley P M
University of Texas at Austin
To: Geoffrey Wertz
Research and Test Reactors Licensing Projects Branch
References
Download: ML18334A096 (1)


Text

I COUEGE OF ENGINEERING THE UNIVERSI1Y OF TEXAS AT AUSTIN Deparh111mt ef Mechani.al Enginw*ing

  • I University Station C2200
  • Austin, Texas 7 8712-0292 1'elephone(512)471-1131 FAX (512)471-8727 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Geoffrey Wertz, P .E. Research and Test Reactors Branch November 14, 2018

SUBJECT:

Request for Extension of Date to Provide a Schedule for Completion ofNeutronic and Thermal-Hydraulic Analyses '

REFERENCE:

October 18, 2018 letter: University of Texas at Austin -Summary of Site Visit and Request for Schedule for Completion of the Reactor Analyses RE: Renewal of Facility Operating License No. R-129 for The University of Texas at Austin Research Reactor (EPID NO. L-2017-RNW-0032)

Sir: We respectfully request an extension of the date in the i:efe_ren9e (i.e.,.30 days from October 18, 2018) for providing a schedule of neutronics and thermal-hydraulic analyses (supporting relicensing of The University of Texas at Austin nuclear research reactor) by an additional 30 days, to 17 December 2018. A proposal to conduct the analysis has been developed the Radiation Center of the Oregon State University and submitted to the Department of Energy requesting support. A schedule has been specified in the proposal based on the date the contract is approved; the proposal is pending, not expected to received final approval by November 17, 2018. If you.have any questions, please contact me at 512 232 5373 or whaley@mail.utexas.edu

~-P, M, Whaley 7 *

  • I I declare under penalty of perjury that the foregoing is true arid correct. * . W. S. Charlton