L-2007-526, 2006-2007 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (Dcpp), Facility Wdid No. 340I018248

From kanterella
Revision as of 22:01, 10 November 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2006-2007 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (Dcpp), Facility Wdid No. 340I018248
ML071840189
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/21/2007
From: Becker J R
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation, State of CA, Regional Water Quality Control Bd
References
340I018248, DCL-2007-526
Download: ML071840189 (84)


Text

Pacific Gas and Electric Company'Diablo Canyon Power Plant P 0. Box 56 Avila Beach, CA 93424 PG&E Letter DCL-2007-526 June 21, 2007 California Regional Water Quality Control Board Central Coast Region 895 Aerovista, Suite #101 San Luis Obispo, CA 93401-7906 Attn: Storm Water Division Certified/Return Receipt#7007-0220-0004-6735-9783 2006-2007 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (DCPP), Facility WDID No. 3401018248 Enclosed is the DCPP Annual Report for Storm Water Discharges Associated with Industrial Activities for the Reporting Period July 1, 2006 through June 30, 2007.The report has been completed in accordance with DCPP's commitment to implement provisions of the State General Industrial Storm Water Permit (General Permit) as outlined in PG&E letter DCL-2006-556 dated November 09, 2006 to the Regional Water Quality Control Board Central Coast Region.If you have any questions or concerns regarding the enclosed report, please contact Trevor Rebel of my staff at (805) 545-3607.Sincerely, J~ames R. cker Vice President

-Diablo Canyon Operations and Station Director Enclosure 2007526/tdr/kmo J---75 PG&E Letter DCL-2007-526 CCRWQCB Storm Water Division June 21, 2007 Page 2 cc: w/enclosure:

Resident Inspector, Terry Jackson U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 Director, Division of Reactor Projects U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Peter von Langen Environmental Scientist CCRWQCB 895 Aerovista, #101 San Luis Obispo, CA 93401-7906 California Department of Fish and Game 20 Lower Ragsdale, Suite 100 Monterey, California 93490 cc: w/o enclosure:

State of California STATE WATER RESOURCES CONTROL BOARD 2006-2007 ANNUAL REPORT FOR STORM WATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITIES Reporting Period July 1, 2006 through June 30, 2007 An annual report is required to be submitted to your local Regional Water Quality Control Board (Regional Board) by July 1 of each year. This document must be certified and signed, under penalty of perjury, by the appropriate official of your company. Many of the Annual Report questions require an explanation.

Please provide explanations on a separate sheet as an attachment.

Retain a copy of the completed Annual Report for your records.Please circle or highlight any information contained in Items A, B, and C below that is new or revised so we can update our records. Please remember that a Notice of Termination and new Notice of Intent are required whenever a facility operation is relocated or changes ownership.

If you have any questions, please contact your Regional Board Industrial Storm Water Permit Contact.The names, telephone numbers and e-mail addresses of the Regional Board contacts, as well as the Regional Board office addresses can be found at http://www.waterboards.ca.gov/stormwtr/contact.html.

To find your Regional Board information, match the first digit of your WDID number with the corresponding number that appears in parenthesis on the first line of each Regional Board office.GENERAL INFORMATION:

A. Facility Information:

Facility Business Name: Diablo Canyon Power Plant (DCPP)Physical Address: 9 Miles North West of Avila Beach Facility WDID No: 3401018248 Contact Person: Trevor D. Rebel e-mail: tdr5(apqe.com State: CA Zip: 93424 Phone: 805.545.3607 City: Avila Beach Standard Industrial Classification (SIC) Code(s) 4911 B. Facility Operator Information:

Operator Name: Pacific Gas and Electric Company Mailing Address: P.O. Box 56 City: Avila Beach Contact Person: Trevor D. Rebel e-mail: tdr5(,p~qe.com State: CA Zip: 93424 Phone: 805.545.3607 C. Facility Billing Information:

Operator Name: Pacific Gas and Electric Company -DCPP Mailing Address: P.O. Box 56 City: Avila Beach Contact Person: Bryan K. Cunningham e-mail: bkc3cWDae.com State: CA Zip: 93424 Phone: 805.545.4439 2006-2007 ANNUAL REPORT SPECIFIC INFORMA TION MONITORING AND REPORTING PROGRAM D. SAMPLING AND ANALYSIS EXEMPTIONS AND REDUCTIONS

1. For the reporting period, was your facility exempt from collecting and analyzing samples from two storm events in accordance with sections B.12 or 15 of the General Permit?E- YES Go to Item D.2 NO Go to Section E 2. Indicate the reason your facility is exempt from collecting and analyzing samples from two storm events. Attach a copy of the first page of the appropriate certification if you check boxes ii, iii, iv, or v.i. -] Participating in an Approved Group Monitoring Plan Group Name: ii Submitted No Exposure Certification (NEC) Date Submitted:

Re-evaluation Date: / /Does facility continue to satisfy NEC conditions?

YES NO iii. LI Submitted Sampling Reduction Certification (SRC) Date Submitted:

/Re-evaluation Date: / I Does facility continue to satisfy SRC conditions?

R YES -1 NO iv. I Received Regional Board Certification Certification Date: v. [] Received Local Agency Certification Certification Date: 3. If you checked boxes i or iii above, were you scheduled to sample one storm event during the reporting year?[I YES Go to Section E [I NO Go to Section F 4. If you checked boxes ii, iv, or v, go to Section F.E. SAMPLING AND ANALYSIS RESULTS 1. How many storm events did you sample? 2 If less than 2, attach explanation (if you checked item D.2.i or iii.above, only attach explanation if you answer "0").2. Did you collect storm water samples from the first storm of the wet season that produced a discharge during scheduled facility operating hours? (Section B.5 of the General Permit)LI YES NO attach explanation (Please note that if you do not sample the first storm event, you are still required to sample 2 storm events)3. How many storm water discharge locations are at your facility?

18 2006-2007.

ANNUAL REPORT 4. For each storm event sampled, did you collect and analyze a sample from each of the facility's' storm water discharge locations?

5. Was sample collection or analysis reduced in accordance with Section B.7.d of the General Permit?If "YES", attach documentation supporting your determination that two or more drainage areas are substantially identical.

Date facility's drainage areas were last evaluated 6/2/07 6. Were all samples collected during the first hour of discharge?

7. Was all storm water sampling preceded by three (3)working days without a storm water discharge?
8. Were there any discharges of storm water that had been temporarily stored or contained? (such as from a pond)9. Did you collect and analyze samples of temporarily stored or contained storm water discharges from two storm events?(or one storm event if you checked item D.2.i or iii. above)-YES, go to Item E.6 Z NO n YES S II F NO, attach explanation LI YES NO, attach explanation

[j YES NO, attach explanation YES [ NO,gotoltemE.10 Z YES 0 NO, attach explanation

10. Section B.5. of the General Permit requires you to analyze storm water samples for pH, Total Suspended Solids (TSS), Specific Conductance (SC), Total Organic Carbon (TOC) or Oil and Grease (O&G), other pollutants likely to be present in storm water discharges in significant quantities, and analytical parameters listed in Table D of the General Permit.a. Does Table D contain any additional parameters related to your facility's SIC code(s)?b. Did you analyze all storm water samples for the applicable parameters listed in Table D?l\ YES [:] NO, Goto Item E.11 0 YES li NO c. If you did not analyze all storm water samples for the applicable Table D parameters, check one of the following reasons: In prior sampling years, the parameter(s) have not been detected in significant quantities from two consecutive sampling events. Attach explanation The parameter(s) is not likely to be present in storm water discharges and authorized non-storm water discharges in significant quantities based upon the facility operator's evaluation.

Attach explanation Other. Attach explanation

11. For each storm event sampled, attach a copy of the laboratory analytical reports and report the sampling and analysis results using Form 1 or its equivalent.

The following must be provided for each sample collected:

0 S S S 0 Date and time of sample collection Name and title of sampler Parameters tested Name of analytical testing laboratory Discharge location identification

  • Testing results" Test methods used* Test detection limits* Date of testing* Copies of the laboratory analytical results 2006-2007 ANNUAL REPORT F. QUARTERLY VISUAL OBSERVATIONS
1. Authorized Non-Storm Water Discharges Section B.3.b of the General Permit requires quarterly visual observations of all authorized non-storm water discharges and their sources.a. Do authorized non-storm water discharges occur at your facility?YES NO GotoltemF.2
b. Indicate whether you visually observed all authorized non-storm water discharges and their sources during the quarters when they were discharged.

Attach an explanation for any "NO" answers. Indicate "N/A" for quarters without any authorized non-storm water discharges.

July-September

[-] YES NO [: N/A October-December E YES [] NO [] N/A January-March 12 YES L] NO -]N/A April-June EYES OI NO LI N/A c. Use Form 2 to report quarterly visual observations of authorized non-storm water discharges or provide the following information:

i. name of each authorized non-storm water discharge ii. date and time of observation iii. source and location of each authorized non-storm water discharge iv. characteristics of the discharge at its source and impacted drainage area/discharge location v. name, title, and signature of observer vi. any new or revised BMPs necessary to reduce or prevent pollutants in authorized non-storm water discharges.

Provide new or revised BMP implementation date.2. Unauthorized Non-Storm Water Discharges Section B.3.a of the General Permit requires quarterly visual observations of all drainage areas to detect the presence of unauthorized non-storm water discharges and their sources.a. Indicate whether you visually observed all drainage areas to detect the presence of unauthorized non- storm water discharges and their sources. Attach an explanation for any "NO" answers.July-September E] YES " NO October-December

[n YES -- NO January-March

[u YES E] NO April-June EYES [L NO b. Based upon the quarterly visual observations, were any unauthorized non-storm water discharges detected?,s] YES f- NO Go to Item F.2.d c. Have each of the unauthorized non-storm water discharges been eliminated or permitted?

YES LI NO Attach explanation

d. Use Form 3 to report quarterly unauthorized non-storm water discharge visual observations or provide the following information:
i. name of each unauthorized non-storm water discharge ii. date and time of observation iii. source and location of each unauthorized non-storm water discharge iv. characteristics of the discharge at its source and impacted drainage area/discharge location v. name, title, and signature of observer vi. any corrective actions necessary to eliminate the source of each unauthorized non-storm water discharge and to clean impacted drainage areas. Provide date unauthorized non-storm water discharge(s) was eliminated or scheduled to be eliminated.

2006-2007 ANNUAL REPORT G. MONTHLY WET SEASON VISUAL OBSERVATIONS Section B.4.a of the General Permit requires you to conduct monthly visual observations of storm water discharges at all storm water discharge locations during the wet season. These observations shall occur during the first hour of discharge or, in the case of temporarily stored or contained storm water, at the time of discharge.

1. Indicate below whether monthly visual observations of storm water discharges occurred at all discharge locations.

Attach an explanation for any "NO" answers. Include in this explanation whether any eligible storm events occurred during scheduled facility operating hours that did not result in a storm water discharge, and provide the date, time, name and title of the person who observed that there was no storm water discharge.

YES 1: October November December January I-I NO D D February March April May YES 0 NO D D E]D 2. Report monthly wet season visual observations using Form 4 or provide the following information:

a.b.C.d.date, time, and location of observation name and title of observer characteristics of the discharge (i.e., odor, color, etc.) and source of any pollutants observed any new or revised BMPs necessary to reduce or prevent pollutants in storm water discharges.

Provide new or revised BMP implementation date.ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION (ACSCE)H. ACSCE CHECKLIST Section A.9 of the General Permit requires the facility operator to conduct one ACSCE in each reporting period (July 1-June 30). Evaluations must be conducted within 8-16 months of each other. The SWPPP and monitoring program shall be revised and implemented, as necessary, within 90 days of the evaluation.

The checklist below includes the minimum steps necessary to complete a ACSCE. Indicate whether you have performed each step below. Attach an explanation for any "NO" answers.1. Have you inspected all potential pollutant sources and industrial activities areas? YES The following areas should be inspected:

M NO* areas where spills and leaks have occurred

  • buildin during the last year 0 materik* outdoor wash and rinse areas 0 vehicle* process/manufacturing areas 9 truck p.* loading, unloading, and transfer areas 0 rooftop* waste storage/disposal areas
  • vehicle" dust/particulate generating areas
  • non-st(* erosion areas 2. Have you reviewed your SWPPP to assure that its BMPs address existing potential pollutant sources and industrial activities areas?3.. Have you inspected the entire facility to verify that the SWPPP's site map is up-to-date?

The following site map items should be verified: g repair, remodeling, and construction Il storage areas/equipment storage areas arking and access areas equipment areas fueling/maintenance areas rm water discharge generating areas YES YES Zl NO[ NO" facility boundaries" outline of all storm water drainage areas* areas impacted by run-on* storm water discharges locations" storm water collection and conveyance system* structural control measures such as catch basins, berms, containment areas, oil/water separators, etc.

2006-2007 ANNUAL REPORT 4. Have you reviewed all General Permit compliance records generated since the last annual evaluation?

E YES F] NO The following records should be reviewed: " quarterly authorized non-storm water discharge visual observations

  • monthly storm water discharge visual observation
  • records of spills/leaks and associated clean-up/response activities
  • quarterly unauthorized non-storm water discharge visual observations
  • Sampling and Analysis records* preventative maintenance inspection and maintenance records 5. Have you reviewed the major elements of the SWPPP to assure compliance with the General Permit?The following SWPPP items should be reviewed: 0 YES El, NO 0 0 0 pollution prevention team list of significant materials description of potential pollutant sources* assessment of potential pollutant sources" identification and description of the BMPs to be implemented for each potential pollutant source 6. Have you reviewed your SWPPP to assure that a) the BMPs are adequate in reducing or preventing pollutants in storm water discharges and authorized non-storm water discharges, and b) the BMPs are being implemented?

0 YES[] NO The following BMP categories should be reviewed: 0 0 0 0 0 good housekeeping practices spill response employee training erosion control quality assurance preventative maintenance material handling and storage practices waste handling/storage structural BMPs 7. Has all material handling equipment and equipment needed to implement the SWPPP been inspected?

M YES FI- NO 1. ACSCE EVALUATION REPORT The facility operator is required to provide an evaluation report that includes: 0 0 0 identification of personnel performing the evaluation the date(s) of the evaluation necessary SWPPP revisions* schedule for implementing SWPPP revisions" any incidents of non-compliance and the corrective actions taken Use Form 5 to report the results of your evaluation or develop an equivalent form.J. ACSCE CERTIFICATION The facility operator is required to certify compliance with the Industrial Activities Storm Water General Permit. To certify compliance, both the SWPPP and Monitoring Program must be up to date and be fully implemented.

Based upon your ACSCE, do you certify compliance with the Industrial Activities Storm Water General Permit?[n YES F NO If you answered "NO" attach an explanation to the ACSCE Evaluation Report why you are not in compliance with the Industrial Activities Storm Water General Permit.

2006-2007 ANNUAL REPORT ATTACHMENT

SUMMARY

Answer the questions below to help you determine what should be attached to this annual report. Answer NA (Not Applicable) to questions 2-4 if you are not required to provide those attachments.

1. Have you attached Forms 1,2,3,4, and 5 or their equivalent?
2. If you conducted sampling and analysis, have you attached the laboratoryanalytical reports?3. If you checked box II, Ill, IV, or V in item D.2 of this Annual Report, have you attached the first page of the appropriate certifications?
4. Have you attached an explanation for each "NO" answer in items E.1, E.2, E.5-E.7, E.9, E.10.c, F.1.b, F.2.a, F.2.c, G.1, H.1-H.7, or J?YES (Mandatory)

YES L'- YES YES]NO-NO DNO-NA ZNA-NA ANNUAL REPORT CERTIFICATION I am duly authorized to sign reports required by the INDUSTRIAL ACTIVITIES STORM WATER GENERAL PERMIT (see Standard Provision C.9) and I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those person directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete.

I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Printed Name: James R. Becker Signat&uýe...

Title: Vice President

-Diablo Canyon Operations and Station Director Date: G 2006-2007 ANNUAL REPORT DESCRIPTION OF BASIC ANZALYTICAL PARAMETERS The Industrial Activities Storm Water General Permit (General Permit) requires you to analyze storm water samples for at least four parameters.

These are pH, Total Suspended Solids (TSS), Specific Conductance (SC),and Total Organic Carbon (TOC). Oil and Grease (O&G) may be substituted for TOC. In addition, you must monitor for any other pollutants whichyou believe to be present in your storm water discharge as a result of industrial activity and analytical parameters listed in Table D of the General Permit. There are no numeric limitations for the parameters you test for.The four parameters which the General Permit requires to be tested are considered indicator parameters.

In other words, regardless of what type of facility you operate, these parameters are nonspecific and general enough to usually provide some indication whether pollutants are present in your storm water discharge.

The following briefly explains what each of these parameters mean: pH is a numeric measure of the hydrogen-ion concentration.

The neutral, or acceptable, range is within 6.5 to 8.5. At values less than 6.5, the water is considered acidic; above 8.5 it is considered alkaline or basic. An example of an acidic substance is vinegar, and a alkaline or basic substance is liquid antacid. Pure rainfall tends to have a pH of a little less than 7. There may be sources of materials or industrial activities which could increase or decrease the pH of your storm water discharge.

If the pH levels of your storm water discharge are high or low, you should conduct a thorough evaluation of all potential pollutant sources at your site.Total Suspended Solids (TSS) is a measure of the undissolved solids that are present in your storm water discharge.

Sources of TSS include sediment from, erosion of exposed land, and dirt from impervious (i.e. paved) areas. Sediment by itself can be very toxic to aquatic life because it covers feeding and breeding grounds, and can smother organisms living on the bottom of a water body. Toxic chemicals and other pollutants also adhere to sediment particles.

This provides a medium by which toxic or other pollutants end up in our water ways and ultimately in human and aquatic life. TSS levels vary in runoff from undisturbed land. It has been shown that TSS levels increase significantly due to land development.

Specific Conductance (SC) is a numerical expression of the ability of the water to carry an electric current. SC can be used to assess the degree of mineralization, salinity, or estimate the total dissolved solids concentration of a water sample.Because of air pollution, most rain water has a SC a little above zero. A high SC could affect the usability of waters for drinking, irrigation, and other commercial or industrial use.Total Organic Carbon (TOC) is a measure of the total organic matter present in water. (All organic matter contains carbon)This test is sensitive and able to detect small concentrations of organic matter. Organic matter is naturally occurring in animals, plants, and man. Organic matter may also be man made (so called synthetic organics).

Synthetic organics include pesticides, fuels, solvents, and paints. Natural organic matter utilizes the oxygen in a receiving water to biodegrade.

Too much organic matter could place a significant oxygen demand on the water, and possibly impact its quality. Synthetic organics either do not biodegrade or biodegrade very slowly. Synthetic organics are a source of toxic chemicals that can have adverse affects at very low concentrations.

Some of these chemicals bioaccumulate in aquatic life. If your levels of TOC are high, you should evaluate all sources of natural or synthetic organics you may use at your site.Oil and Grease (O&G) is a measure of the amount of oil and grease present in your storm water discharge.

At very low concentrations, O&G can cause a sheen (that floating "rainbow")

on the surface of water (1 qt. of oil can pollute 250,000 gallons of water). O&G can adversely affect aquatic life and create unsightly floating material and film on water, thus making it undrinkable.

Sources of O&G include maintenance shops, vehicles, machines and roadways.If you have any questions regarding whether or not your constituent concentrations are too high, please contact your local Regional Board office. The United States Environmental Protection Agency (USEPA) has published stormwater discharge benchmarks for a number of parameters.

These benchmarks may be helpful when evaluating whether additional BMPs are appropriate.

These benchmarks can be accessed at our website at http://www.waterboards.ca.gov.

It is contained in the Sampling and Analysis Reduction Certification.

See Storm Water Contacts at http://www.waterboards.ca.gov/stormwtr/contact.html SIDE A FORM 1-SAMPLING

& ANALYSIS RESULTS FIRST STORM EVENT" If analytical results are less than the detection limit (or non detect the numerical value of the detection limit (example:

<.05)" If you did not analyze for a required parameter, do not report "0".able), show the value as less than 0 When analysis is done using portable analysis (such as portable pH meters, SC meters, etc.), indicate PA" in the appropriate test method used box.Instead, leave the appropriate box blank = Make additional copies of this form as necessary.

TITLE: Environmental Specialist SIGNATURE:

C ._/(,iL-NAME OF PERSON COLLECTING SAMPLE(S):

Trevor Rebel ANALYTICAL RESULTS DESCRIBE For First Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS SC O&G Fe Marine Refuel 11-26-06 Facility Runoff 20:30 20:20 7.6 390 480 ND 17 003 11-26-06 Yard Storm Drain 20:22 20:20 6.9 580 3400 8.0 23 004 11-26-06 Yard Storm Drain 20:43 21:15 (1) -7.3 250 1000 ND 11 to Retention Basin 005 11-26-06 Yard Storm Drain 21:00 20:45 9.1 660 2100 10 14 TEST REPORTING UNITS: pH Units mgIl umho/cm mgIl mgI _0.1 5 1 5 0.1 TEST METHOD DETECTION LIMIT: EPA EPA SM EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 LAB LAB LAB LAB LAB ANALYZED BY (SELF/LAB):----------

ITS -I otal Suspended Solos SC -Specitic Conductance (1) Point sampled pre-released as explained in comments under Section E, Number 2.(O&{3 -(Oil & Grease I UU -T otal Organic C~arbon SIDE A FORM 1-SAMPLING

& ANALYSIS RESULTS FIRST STORM EVENT" If analytical results are less than the detection limit (or non detectable), show the value as less than

  • When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example:

<.05) meters, etc.), indicate "PA" in the appropriate test method used box.* If you did not analyze for a required parameter, do not report "0V. Instead, leave the appropriate box blank

  • Make additional copies of this form as necessary.

NAME OF PERSON COLLECTING SAMPLE(S):

Trevor Rebel TITLE: Environmental Specialist SIGNATURE:

_ANALYTICAL RESULTS DESCRIBE For First Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS SC O&G Fe Pb 006 11-26-06 Yard Storm Drain 21:10 20:30 9.3 57 170 ND 2.1 n/a (At Discharge) 006 11-26-06 Range Immediate 21:56 21:00 8.4 100 150 ND 2.7 .14 Outlet 008 11-26-06 Yard Storm Drain 21:39 20:45 6.8 18 940 ND 1.2 n/a 009 11-26-06 Yard Storm Drain 22:30 20:30 (1) 7.0 11 450 ND 0.8 n/a TEST REPORTING UNITS: pH Units mg/I umho/cm mg/I mg/I mg/I 0.1 5 1 5 0.1 .001 TEST METHOD DETECTION LIMIT: EPA EPA SM EPA EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 200.8 LAB LAB LAB LAB LAB LAB ANALYZED BY (SELF/LAB):____

I So -I uLIl Suspernudu Suolids -Specific Conductance uO& -Oil & Grease (1) Sample obtained greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after discharge started as explained in comments under Section E, Number 6.I -Total Organic Carbon SIDE A FORM 1-SAMPLING

& ANALYSIS RESULTS FIRST STORM EVENT* If analytical results are less than the detection limit (or non detectable), show the value as less than

  • When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example:

<.05) meters, etc.), indicate "PA" in the appropriate test method used box." If you did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank 0 Make additional copies of this form as necessary.

NAME OF PERSON COLLECTING SAMPLE(S):

Trevor Rebel TITLE: Environmental Specialist SIGNATURE:

Z:7i 1L..ANALYTICAL RESULTS DESCRIBE For First Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS Sc O&G Fe 011 11-26-06 Yard Storm Drain 21:32 20:45 7.3 38 230 ND 2.0 013 11-26-06 Yard Storm Drain 21:21 20:45 8.5 760 320 ND 16 015 11-26-06 Yard Storm Drain 21:26 20:45 8.2 190 180 ND 8.8 023 11-26-06 Yard Storm Drain 20:25 20:20 6.7 210 940 ND 10 TEST REPORTING UNITS: pH Units mgI1 umho/cm mgIl mgIl 0.1 5 1 5 0.1 TEST METHOD DETECTION LIMIT: EPA EPA SM EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 LAB LAB LAB LAB LAB ANALYZED BY (SELF/LAB):


TSS -Total Susoended Solids SC -Soecific Conductance O&G -Oil & Grease TOC -Total Organic Carbon... .........

F ....... ..v SIDE B FORM 1-SAMPLING

& ANALYSIS RESULTS SECOND STORM EVENT" If analytical results are less than the detection limit (or non detectable), show the value as less than

  • When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example:

<.05) meters, etc.), indicate "PA" in the appropriate test method used box." If you did not analyze for a required parameter, do not report V0". Instead, leave the appropriate box blank

  • Make additional copies of this form as necessary.

NAME OF PERSON COLLECTING SAMPLE(S):

Trevor Rebel TITLE: Environmental Specialist SIGNATURE:

  • °ANALYTICAL RESULTS DESCRIBE For Second Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS Sc O&G Fe Marine Refuel 2-7-07 Facility Runoff 14:34 14:25 7.8 230 240 ND 10 003 2-7-07 Yard Storm Drain 14:27 14:25 7.3 330 610 8 18 004 2-7-07 Yard Storm Drain 14:38 14:40 (1) 7.0 44 480 ND 1.9 to Retention Basin 005 2-7-07 Yard Storm Drain 14:42 14:30 7.8 86 630 ND 2.7 TEST REPORTING UNITS: pH Units mgIl umho/cm mglI mgII 0.1 5 1 5 0.1 TEST METHOD DETECTION LIMIT: EPA EPA SM EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 LAB LAB LAB LAB LAB ANALYZED BY (SELF/LAB):

--ITS -I otal Suspenaea Solids SC -Specitic Conductance (1) Point sampled pre-released as explained in comments under Section E, Number 2.rO&G -Oil & Grease TOC -Total Organic Carbon SIDE B FORM 1-SAMPLING

& ANALYSIS RESULTS SECOND STORM EVENT" If analytical results are less than the detection limit (or non detectable), show the value as less than = When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example:

<.05) meters, etc.), indicate "PA" in the appropriate test method used box." If you did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank 0 .Make additional copies of this form as necessary.

NAME OF PERSON COLLECTING SAMPLE(S):

Trevor Rebel TITLE: Environmental Specialist SIGNATURE:

_ _ -_______ANALYTICAL RESULTS DESCRIBE For Second Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS SC O&G Fe Pb 006 2-7-07 Yard Storm Drain -14:49 14:25 8.3 44 120 ND 2.0 .004 (At Discharge) 006 2-7-07 Range Immediate 14:56 14:40 8.0 40 130 ND 1.2 .13 Outlet 008 2-7-07 Yard Storm Drain 14:30 14:25 (1) 6.7 33 2100 ND 1.6 n/a 009 2-7-07 Yard Storm Drain 14:45 14:25 (1) 6.6 18 130 ND 0.17 n/a TEST REPORTING UNITS: pH Units mg/I umho/cm mglI mgIl mgIl 0.1 5 1 5 0.1 .001 TEST METHOD DETECTION LIMIT: 0115010 EPA EPA SM EPA EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 200.8 LAB LAB LAB LAB LAB LAB ANALYZED BY SELF/LAB: ()- a uSapl upta uenby toried C s T -SDpecific Caonductance s&G -Oil ('i) Sample taken by trained Chemistry Technician Dean Novotny under the supervision of Trevor Rebel.& Grease TOC -Total Organic Carbon SIDE B FORM 1-SAMPLING

& ANALYSIS RESULTS-SECOND STORM EVENT" If analytical results are less than the detection limit (or non detectable), show the value as less than

  • When analysis is done using portable analysis (such as portable pH meters, SC the numerical value of the detection limit (example:

<.05) meters, etc.), indicate "PA" in the appropriate test method used box." If you did not analyze for a required parameter, do not report "0". Instead, leave the appropriate box blank

  • Make additional copies of this form as necessary.

NAME OF PERSON COLLECTING SAMPLE(S):

Trevor Rebel TITLE: Environmental Specialist SIGNATURE: ( T 4 ANALYTICAL RESULTS DESCRIBE For Second Storm Event DISCHARGE DATE/TIME TIME LOCATION OF SAMPLE DISCHARGE Example: NW Out Fall COLLECTION STARTED BASIC PARAMETERS OTHER PARAMETERS PH TSS SC O&G Fe 011 2-7-07 Yard Storm Drain 15:12 14:40 7.5 30 190 ND 1.3 013 2-7-07 Yard Storm Drain 15:03 14:40 7.8 200 260 ND 4.8 015 2-7-07 Yard Storm Drain 15:07 14:40 8.0 86 140 ND 2.6 7 023 2-7-07 Yard Storm Drain 14:30 14:25 6.9 180 370 ND 3.1 TEST REPORTING UNITS: pH Units mgIl umho/cm mg/I mgIl 0.1 5 1 5 0.1 TEST METHOD DETECTION LIMIT: EPA EPA SM EPA EPA TEST METHOD USED: 150.1 160.2 2510 1664 200.7 LAB LAB LAB LAB LAB ANALYZED BY (SELF/LAB):-ITotal S3uspended SoliIds SC -Specific Conductance U&(G -Oil & G~rease I UC -I otal Organic C~aroon FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)* Quarterly dry weather visual observations are required of each authorized NSWD." Observe each authorized NSWD source, impacted drainage area, and discharge location." Authorized NSWDs must meet the conditions provided in Section D (pages 5-6), of the General Permit." Make additional copies of this form as necessary.

QUARTER: Observers Name: JULY-SEPT.

D7 YES Title: WERE ANY AUTHORIZED NSWDS If YES, complete See Comment F.1.b DISCHARGED DURING THIS QUARTER? reverse side of w7 NO this form.Signature:

QUARTER: Observers Name: Trevor Rebel OCT.-DEC. YES OCT.DEC.YESIf YES, complete Title: Environmental Specialist WERE ANY AUTHORIZED NSWDs reverse side of DATE: DISCHARGED DURING THIS QUARTER? reethis form.12/21/06 Signature:

_______________-________NO ti om QUARTER: Observers Name: Trevor Rebel JAN.-MARCH YES JAN.MARC YESIf YES, complete Title: Environmental Specialist WERE ANY AUTHORIZED NSWDs If s, om DATE: 03/29/07 DISCHARGED DURING THIS QUARTER? reverhis form.03/29/07 Signature:

____________________L NO ti om QUARTER: Observers Name: Trevor Rebel APRIL-JUNE YES Title: Environmental Specialist WERE ANY AUTHORIZED NSWDs EIf YES, complete DATE: DISCHARGED DURING THIS QUARTER? reNOrthis form.*06/04/07 Signature:

NO this form SIDE B FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)DATE /TIME OF SOURCE AND NAME OF DESCRIBE AUTHORIZED NSWD DESCRIBE ANY REVISED OR NEW OBSERVATION LOCATION OF AUTHORIZED CHARACTERISTICS BMPs AND PROVIDE THEIR AUTHORIZED NSWD Indicate whether authorized NSWD is clear, cloudy, or IMPLEMENTATION DATE NSWD discolored, causing staining, contains floating objects or an oil sheen, has odors, etc.EXAMPLE: EXAMPLE: At the NSWD At the NSWD Drainage Air conditioner Units Air conditioner Source Area and Discharge on Building C condensate Location Admin Building Landscape water Clean and Clear Clean and Clear None 12/21/06 Landscape water to 004 07:30 Training Building Landscape water Clean and clear Clean and Clear None 12/21/06 Landscape water to 004 07:30 Air Compressor.

Air Compressor Clean and clear Clean and Clear None 12/21/06 Condensates Condensates To 004 10:00 SWRO facility pump Saltwater pump Clean and clear Clean and Clear None 12/21/06 leak off drains to leak off 005 10:30 Potable water Fresh water Clean and Clear Clean and Clear None 12/21/06 system to 006 at approximately lgpm 13:00 SIDE B FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)DATE /TIME OF SOURCE AND NAME OF DESCRIBE AUTHORIZED NSWD DESCRIBE ANY REVISED OR NEW OBSERVATION LOCATION OF AUTHORIZED CHARACTERISTICS BMPs AND PROVIDE THEIR AUTHORIZED NSWD Indicate whether authorized NSWD is clear, cloudy, IMPLEMENTATION DATE NSWD or discolored, causing staining, contains floating objects or an oil sheen, has odors, etc.EXAMPLE: EXAMPLE: At the NSWD At the NSWD Drainage Air conditioner Units Air conditioner Source Area and Discharge on Building C condensate Location Admin Building Landscape water Clean and clear Clean and Clear None 03/29/07 Landscape water to 004 07:30 Training Building Landscape water Clean and clear Clean and Clear None 03/29/07 Landscape water to 004 07:35 Air Compressor Air Compressor Clean and clear Clean and Clear None 03/29/07 Condensates Condensates To 004 10:00 SWRO facility pump Saltwater pump Clean and clear Clean and Clear None 03/29/07 leak off drains to leak off 005 07:25 Potable water Potable Clean and Clear Clean and Clear None 03/29/07 system to 006 at water/natural spring approximately 1 gpm 11:00 SIDE B FORM 2-QUARTERLY VISUAL OBSERVATIONS OF AUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)DATE /TIME OF SOURCE AND NAME OF DESCRIBE AUTHORIZED NSWD DESCRIBE ANY REVISED OR NEW OBSERVATION LOCATION OF AUTHORIZED CHARACTERISTICS BMPs AND PROVIDE THEIR AUTHORIZED NSWD Indicate whether authorized NSWD is clear, cloudy, or IMPLEMENTATION DATE NSWD discolored, causing staining, contains floating objects or an oil sheen, has odors, etc.EXAMPLE: EXAMPLE: At the NSWD At the NSWD Drainage Air conditioner Units Air conditioner Source Area and Discharge on Building C condensate Location Admin Building Landscape water Clean and clear Clean and Clear None 06/04/07 Landscape water to 004 07:00 Training Building Landscape water Clean and clear Clean and Clear None 06/04/07 Landscape water to 004 07:05 Air Compressor Air Compressor Clean and clear Clean and Clear None 06/04/07 Condensates Condensates To 004 11:00 SWRO facility pump Saltwater pump Clean and clear Clean and Clear None 06/04/07 leak off drains to leak off 005 06:45 Potable water Potable Clean and Clear Clean and Clear None 06/04/07 system to 006 at water/naturarspring approximately lgpm 14:00 SIDE A FORM 3-QUARTERLY VISUAL OBSERVATIONS OF UNAUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)" Unauthorized NSWDs are discharges (such as wash or rinse waters) that do not meet the conditions provided in Section D (pages 5-6) of the General Permit.* Quarterly visual observations are required to observe current and detect prior unauthorized NSWDs.* Quarterly visual observations are required during dry weather and at all facility drainage areas.* Each unauthorized NSWD source, impacted drainage area, and discharge location must be identified and observed.* Unauthorized NSWDs that can not be eliminated within 90 days of observation must be reported to the Regional Board in accordance with Section A.10.e of the General Permit." Make additional copies of this form as necessary.

QUARTER: JULY-SEPT.

If YES to Observers Name: WERE UNAUTHORIZED either Not Appicable NSWDs OBSERVED?

DYES EINO question, Title: complete See comment F.2.a WERE THERE INDICATIONS OF reverse PRIOR UNAUTHORIZED NSWDs? ElYES E]NO side.Signature:

QUARTER: OCT.-DEC.

If YES to Observers Name: Trevor Rebel WERE UNAUTHORIZED either DATE/TIME OF NSWDs OBSERVED?

YES NO question, OBSERVATIONS Title: Environmental Specialist complete WERE THERE INDICATIONS OF reverse 12/21/06 16:00 Signature:

__ _ _ _ _ PRIOR UNAUTHORIZED NSWDs? Z YES NO side.QUARTER: JAN.-MARCH If YES to Observers Name: Trevor Rebel WERE UNAUTHORIZED either DATE/TIME OF NSWDs OBSERVED?

ElYES Z NO question, OBSERVATIONS Title: Environmental Specialist complete WERE THERE INDICATIONS OF reverse 03/29/07 17:00 PRIOR UNAUTHORIZED NSWDs? ElYES Z NO side.QUARTER: APRIL-JUNE If YES to Observers Name: Trevor Rebel WERE UNAUTHORIZED either DATE/TIME OF NSWDs OBSERVED?

EYES Z NO question, OBSERVATIONS Title: Environmental Specialist complete WERE THERE INDICATIONS OF reverse 06i/04/07 16:00 gnature: PRIOR UNAUTHORIZED NSWDs? E YES Z NO side.

SIDE B FORM 3 QUARTERLY VISUAL OBSERVATIONS OF UNAUTHORIZED NON-STORM WATER DISCHARGES (NSWDs)OBSERVATION NAME OF SOURCE AND DESCRIBE UNAUTHORIZED NSWD CHARACTERISTICS DESCRIBE CORRECTIVE DATE UNAUTHORIZED LOCATION Indicate whether unauthorized NSWD is clear, cloudy, ACTIONS TO ELIMINATE (FROM NSWD OF discolored, causing stains; contains floating objects or an oil UNAUTHORIZED NSWD AND REVERSE SIDE) UNAUTHORIZED sheen, has odors, etc. TO CLEAN IMPACTED NSWD DRAINAGE AREAS.PROVIDE UNAUTHORIZED EXAMPLE: EXAMPLE: AT THE UNAUTHORIZED NSWD ELIMINATION DATE.Vehicle Wash NW Corner of AT THE UNAUTHORIZED NSWD AREA AND Water Parking Lot NSWD SOURCE DISCHARGE LOCATION Rinsing vehicles for West of Warehouse Clean and Clear. No sheen, Clean and Clear. No sheen, Hoses removed.12/21/06 the removal of salt. B in discharge path no odor. no odor. Area was, and remains clean.006. No residue or evidence of 13:00 contamination.

No rinsing signage posted.Fully eliminated as of 2-28-07/ /: AM[-PM I I-AM-PM/ !: IAM 1-1PM FORM 4-MONTHLY VISUAL OBSERVATIONS OF STORM WATER DISCHARGES SIDE A* Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31." Visual observations must be conducted during the first hour of discharge at all discharge locations.

  • Discharges of temporarily stored or contained storm water must be observed at the time of discharge.

S S Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

Make additional copies of this form as necessary.

Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.

  1. 1 Boat #2 003 #3 004 #4 005 Observation Date: October _ 2006 Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain Drainage Location Description Retention Basin Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:

Were Pollutants Observed (If yes, complete reverse side)#1 Boat #2 003 #3 004 #4 005 Drainage Location Description Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain DranagLoatonesciptonRetention Basin Observers Name_ NONE NONE NONE NONE Observation Time Title: ______Time Discharge Began Signature:

Were Pollutants Observed (If yes, complete reverse side)#1 Boat #2 003 #3 004 #-4 005 Observation Date: December 8 2006 # ot# 0 304# 0 Drainage Location Description Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain DranagLoatonesciptonRetention Basin Observers Name: Trevor Rebel 1 15:18 15:10 15:20 15:25 Observation Time Title: Environmental Specialist 15:10 15:10 Pre Release 15:20-- A2t / _ Time Discharge Began Signature:

(,'V-X/ -Were Pollutants Observed No (If yes, complete reverse side) No_ _ _No No oM_ No___#1 Boat #2 003 #3 004 .#4 005 DrainageoLocationnDescription7Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain Drainage Location DescriptionBasin Observers Name: Trevor Rebel 11:30 11:20 12:15 (1) 12:30 Observation Time Title: Environmental Specialist 11:20 11:20 Pre Release 11:40 Time Discharge Began Signature:

,-? VL Were Pollutants Observed No No Yes No (If yes, complete reverse side) --------(1) Jim Kelly, Senior Biologist, performed 004 visual inspection in January.

FORM 4-MONTHLY VISUAL OBSERVATIONS OF S* Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31.* Visual observations must be conducted during the first hour of discharge at all discharge locations.

  • Discharges of temporarily stored or contained storm water must be observed at the time of discharge.

SIDE A TORM WATER DISCHARGES 0 Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

Make additional copies of this form as necessary.

Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.

  1. 5 006 #6 Range #7 007 #8 008 Observation Date: October 2006 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)

Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:

Were Pollutants Observed (If yes, complete reverse side)#5 006 #6 Range #7 007 #8 008 Observation Date: November 2006 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)

Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:

Were Pollutants Observed (If yes, complete reverse side)#5 006 #6 Range #7 007 #8 008 Observation Date: December 8 2006 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)

Observers Name: Trevor Rebel 15:30 No Discharge No Discharge 15:56 Observation Time Title: Environmental Specialist 15:20 No Discharge No Discharge 15:30 Time Discharge Began Signature:

_ Were Pollutants Observed No N/A N/A No ZS](If yes, complete reverse side)#5 006 #6 Range #7 007 #8 008 Observation Date: January 4 2007 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)

Observers Name: Trevor Rebel 11:58 12:00 No Discharge 12:20 (1)Observation Time Title: Environmental Specialist 11:30 11:45 No Discharge 11:30 Time Discharge Began Signature:

Were Pollutants Observed No No N/A No S(If yes, complete reverse tide)(1) Dean Novotny, Chemistry Technician, performed 008 visual inspection in January FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES

.Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31." Visual observations must be conducted during the first hour of discharge at all discharge locations.

  • Discharges of temporarily stored or contained storm water must be observed at the time of discharge.

Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

Make additional copies of this form as necessary.

Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.

  1. 9 009 #10 010 #11 011 #12 012 Observation Date: October 2006 Description Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Observers Name:. NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:

Were Pollutants Observed (If yes, complete reverse side)#9 009 #10 010 #11 011 #12 012 Observation Date: November 2006 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:

Were Pollutants Observed (If yes, complete reverse side)#9 009 #10 010 #11 011 #12 012 Observation Date: December 8 2006 Description Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Observers Name: Trevor Rebel 15:45 (1) 15:3.6 16:00 No Discharge Observation Time Title: Environmental Specialist 15:20 15:20 15:30 No Discharge rn7A Time Discharge Began Signature:

Were Pollutants Observed No No Yes F7 No (If yes, complete reverse side) _ _#9 009 #10 010 #11 011 #12 012 Observation Date: January 4 2007 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel 12:10 (2) 12:02 12:20 12:25 Observation Time Title: EnvirOnmental Specialist 11:20 11:30 11:30 12:25 Time Discharge Began Signat ure:__________

Were Pollutants Observed No No Yes No (If yes, complete reverse side) No No Yes No (1) Trained Chemistry Engineer Clint Gans performed 009 inspection in December.(2) Dean Novotny, Trained Chemistry Technician, performed 009 visual inspection in January.

FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES" Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31." Visual observations must be conducted during the first hour of discharge at all discharge locations.

  • Discharges of temporarily stored or contained storm water must be observed at the time of discharge.

S S Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

Make additional copies of this form as necessary.

Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.

  1. 13 013 #14 014 #15 015 #16 020 Observation Date: October 2006 Description Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm DrainageocationDscriptio Drainr Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:

Were Pollutants Observed (If yes, complete reverse side)#13 013 #14 014 #15 015 #16 020 Observation Date: November 2006 Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm Drainage Location Description Drainr Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:

Were Pollutants Observed (If yes, complete reverse side)#13 013 #14 014 #15 015 #16 020 Observation Date: December 8 2006 Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm Drainage Location Description Drainr Observers Name: Trevor Rebel 15:41 No Discharge 15:45 15:11 Observation Time Title: Environmental Specialist 15:30 No Discharge 15:20 15:10 Time Discharge Began Signature:

____Were Pollutants Observed No No No No SIf yes, complete reverse side) No_ NoNo_____No

  1. 13 013. #14 014 #15 015 #16 020 Observation Date: January 4 2007 Description Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm Drainr Observers Name:, Trevor Rebel 12:06 No Discharge 12:08 11:22 Observation Time Title: Environmental Specialist 11:30 No Discharge 11:30 11:20 j6/~Time Discharge Began Signature:

Were Pollutants Observed No No No No (If yes, complete reverse side) No No No No FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES" Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31.* Visual observations must be conducted during the first hour of discharge at all discharge locations." Discharges of temporarily stored or contained storm water must be observed at the time of discharge.

Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

Make additional copies of this form as necessary.

Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.

  1. 17 021 #18 023 ObservationDrainage Location Description Yard Storm Drain Yard Storm Drain Observers Name: NONE NONE Observation Time Title: Time Discharge Began Signature:

Were Pollutants Observed (If yes, complete reverse side)#17 021 #18 023 Observation Date: November 2006 Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: NONE NONE Observation Time Title: Time Discharge Began Signature:

Were Pollutants Observed (if yes, complete reverse side)#17 021 #18 023 Observation Date: December 8 2006 Yard Storm Drain Yard Storm Drain Drainage Location Description YadSomDinarStmDan Observers Name: Trevor Rebel No Discharge 15:14 Observation Time Title: Environmental Specialist No Discharge 15:10 Time Discharge Began Signature:. , Were Pollutants Observed N/A NoZ (If yes, complete reverse side)#17 021 #18 023 Observation Date: January 4 2007 Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel No Discharge 11:23 Observation Time Title: Environmental Specialist No Discharge 11:20 Time Discharge Began.Signature:

Were Pollutants Observed N/A No (If yes, complete reverse side) I SIDE B FORM 4-MONTHLY VISUAL OBSERVATIONS OF STORM WATER DISCHARGES DATEITIME OF DRAINAGE AREA DESCRIBE STORM WATER DISCHARGE IDENTIFY AND DESCRIBE SOURCE(S)

OF DESCRIBE ANY REVISED OR NEW OBSERVATION DESCRIPTION CHARACTERISTICS POLLUTANTS BMPs AND THEIR DATE OF (From Reverse Side) IMPLEMENTATION Indicate whether storm water discharge is clear, EXAMPLE: Discharge from cloudy, or discolored; causing staining; containing EXAMPLE: Oil sheen caused by oil dripped by material storage Area #2 floating objects or an oil sheen, has odors, etc. trucks in vehicle maintenance area.011 Discharge Foam on top of the water. Foam from recent paving operations in None.12/08/06 the 500kV yard.16:00 004 Retention Basin Some foam on top of the water leading to Foam from recent paving operations in None.01/04/07 the 004 settlement basin. No foam parking lots within the 004 path.discharging to ocean.12:15 011 Discharge Foam on top of the water. Foam from recent paving operations in None.01/04/07 Less foam than was observed at same the 500kV yard.location on 12-8-06.12:20 EAM flPM/1/: AM flPM FORM 4-MONTHLY VISUAL OBSERVATIONS OF STORM WATER DISCHARGES SIDE A" Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31." Visual observations must be conducted during the first hour of discharge at all discharge locations." Discharges of temporarily stored or contained storm water must be observed at the time of discharge.

S S Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

Make additional copies of this form as necessary.

Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.

  1. 1 Boat #2 003 #3 004 #4 005 ObsDrainage Locatio Description00 Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain Drainage______

LocationDescription Retention Basin Observers Name: Trevor Rebel 14:34 14.:27 14:38 14:42 Observation Time Title: Environmental Specialist 14:25 14:25 14:40 14:30 Time Discharge Began _ _ _ _ _Signature:

-' 4- Were Pollutants Observed No No No No_____________________________________ (If yes, complete reverse side) _____________

____________

_____________

___________

  1. 1 Boat '#2 003 #3 004 #4 005 Observation Date: March 20 2007 Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain Drainage Location DescriptionRentoBai Observers Name: Trevor Rebel 13:25 13:15 13:37 13:34 Observation Time Title: Environmental Snecialist 13:10 13:10 13:20 13:20~~~AI ~~~Time Discharge Began__ _ _ _ __ _ _ _ _ _ _Sig atre: __ ___ __ Were Pollutants Observed NoNoNoN (If yes, complete reverse side)#1 Boat #2 003 #3 004 #4 005 ObDrainage Locatio Description0 Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain DrainageLocationDescriptio Retention Basin Observers Name: Trevor Rebel 18:29 18:25 18:33 18:38 Observation Time Title: Environmental Specialist 18:15 18:15 18:30 18:15 Time Discharge Began ____________

Signa tue: __ __ __ Were Pollutants Observed No No No No (If yes, complete reverse side) ____________

___________

  1. 1 Boat #2 003 #3 004 '#4 005 Drainvatge Locatio Descriptio Marine Refuel Station Yard Storm Drain Yard Storm Drain to Yard Storm Drain DrainageocationDscriptio Retention Basin Observers Name: _ ____NONE NONE NONE NONE Observation Time ____________

Title: _______Time Discharge Began ___________

Signature:

__________________

Were Pollutants Observed______________________________________ (If yes, complete reverse side) ____________

____________

____________

___________

FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES" Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31." Visual observations must be conducted during the first hour of discharge at all discharge locations.

  • Discharges of temporarily stored or contained storm water must be observed at the time of discharge." Indicate "None" in the first column of this form if you did not conduct a monthly visual observation." Make additional copies of this form as necessary." Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.
  1. 5 006 #6 Range #7 007 #8 008 Observation Date: February 7 2007 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)

Observers Name: Trevor Rebel 14:49 14:56 No Discharge 14:30 Observation Time Title: Environmental Specialist 14:25 14:40 No Discharge 14:25---- Discharge Began Signature:

_______ __- Were Pollutants Observed No No No 19 No (If yes, complete reverse side)#5 006 #6 Range #7 007 #8 008 Observation Date: March 20 2007 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)

Observers Name: Trevor Rebel 13:45 13:40 No Discharge 14:05 Observation Time Title: Environmental Specialist 13:20 13:20 No Discharge 13:20 Time Discharge Began Signa ture:__ Were Pollutants Observed No NO NO No Signature: (If yes, complete reverse side N o#5 006 #6 Range #7 007 #8 008 Observation Date: April 19 2007 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)

Observers Name: Trevor Rebel 18:47 4-20 06:58 No Discharge 4-20 07:18 Observation Time Title: Environmental Specialist 18:30 4-20 00:00 No Discharge 4-20 00:00-AA1, fTime Discharge Began Signature: .fVL.,'.." Were Pollutants Observed No No NoZ NoZ (if yes, complete reverse side)#5 006 #6 Range #7 007 #8 008 Observation Date: May 2007 Yard Storm Drain Immediate Outlet Storm Water Yard Storm Drain Drainage Location Description (At Discharge)

Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:

Were Pollutants Observed (If yes, complete reverse side)

FORM 4-MONTHLY VISUAL OBSERVATIONS OF S* Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31." Visual observations must be conducted during the first hour of discharge at all discharge locations." Discharges of temporarily stored or contained storm water must be observed at the time of discharge.

SIDE A TORM WATER DISCHARGES 0 Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

Make additional copies of this form as necessary.

Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.

  1. 9 009 #10 010 #11 011 #12 012 Observation Date: February 7 2007 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel 14:45 14:55 15:12 15:20 Observation Time Title: Environmental Specialist 14:25 14:25 14:40 14:40 Time Discharge Began Signature:

___________..__.

_ Were Pollutants Observed No No No No (If yes, complete reverse side) o[ o[ o[ o[#9 009 #10 010 #11 011 #12 012 Observation Date: March 20 2007 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel 13:10 13:48 14!10 14:15 Observation Time Title: Environmental Specialist 13:10 13:20 13:20 14:15 Time Discharge Began Signature:

rWere Pollutants Observed No No No No (If yes, complete reverse side) No No No_ _____#9 009 #10 010 #11 011 #12 012 Observation Date: April 19 2007 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: Trevor Rebel 18:19 4-20 07:04 4-20 07:12 4-20 07:26 Observation Time Title: Environmental Soecialist 18:15 4-20 00:00 4-20 00:00 4-20 00:00 Time Discharge Began Signature:

Were Pollutants Observed No No No No (If yes, complete reverse side) No _ _ _ _ _ _ NoNoNo#9 009 #10 010 #11 011 #12 012 Observation Date: May 2007 Yard Storm Drain Yard Storm Drain Yard Storm Drain Yard Storm Drain Drainage Location Description Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:

Were Pollutants Observed (If yes, complete reverse side)

FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES" Storm water discharge visual observations are required for at least one storm 0 Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

event per month between October 1 and May 31. 0 Make additional copies of this form as necessary.

  • Visual observations must be conducted during the first hour of discharge
  • Until a monthly visual observation is made, record any eligible storm events that do not result in a storm at all discharge locations, water discharge and note the date, time, name, and title of who observed there was no storm water* Discharges of temporarily stored or contained storm water must be observed discharge.

at the time of discharge.

  1. 13 013 #14 014 #15 015 #16 020 Observation Date: February 7 2007 Description Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm DranagLoatonesciptonDrainr Observers Name: Trevor Rebel 15:35 No Discharge 15:30 14:28 Observation Time Title: Environmental Specialist 14:40 No Discharge 14:40 14:251 _ Time Discharge Began: Signature:

Were Pollutants Observed No No No No (If yes, complete reverse side)#13 013 #14 014 #15 015 #16 020 Observation Date: March 20 2007 Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm Drainage Location Description Drainr Observers Name: Trevor Rebel 13:50 13:58 13:55 13:21 Observation Time Title: Environmental Specialist 13:20 13:20 13:20 13:10 Time Discharge Began Signature:

,___/ w__... _ Were Pollutants Observed Yes No Yes No (If yes, complete reverse side) Yes____No____Yes_[__No___

  1. 13 013 #14 014 #15 015 #16. 020 Observation Date: April 19 2007 Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm Drainage Location Description Drainr Observers Name: Trevor Rebel 4-20 07:07 4-20 07:31 18:57 18:25 Observation Time Title: Environmental SDecialjst 4-20 00:00 4-20 00:00 18:45 18:15 Time Discharge Began Signature:

Were Pollutants Observed NoZ7 NoZ NoZ No (if yes, complete reverse side) N 2IN. oNN#13 013 #14 014 #15 015 #16 020 ObservationDrainage Location Description Yard Storm Drain Storm Water Runoff Yard Storm Drain Intake Deck Storm_rainageocationscriptio Drainr Observers Name: NONE NONE NONE NONE Observation Time Title: Time Discharge Began Signature:

Were Pollutants Observed (If yes, complete reverse side)

FORM 4-MONTHLY VISUAL OBSERVATIONS OF SIDE A STORM WATER DISCHARGES" Storm water discharge visual observations are required for at least one storm event per month between October 1 and May 31." Visual observations must be conducted during the first hour of discharge at all discharge locations." Discharges of temporarily stored or contained storm water must be observed at the time of discharge.

Indicate "None" in the first column of this form if you did not conduct a monthly visual observation.

Make additional copies of this form as necessary.

Until a monthly visual observation is made, record any eligible storm events that do not result in a storm water discharge and note the date, time, name, and title of who observed there was no storm water discharge.

  1. 17 021 #18 023 Observation Date: February 7 2007YadSomDin arStmDan Drainage Location DescriptionYadSomDanarStmDai Observers Name: Trevor Rebel 14:28 14:30 Observation Time: Title: Environmental Specialist 14:25 14:25 Time Discharge Began ____________

Sinaur: ___________________Were Pollutants Observed No No ;7 Sintue (If yes, complete reverse side) ____________

___________

_____ ______ __________

  1. 17 021 #18 023 Observation Date: March 20 2007 DangLotinesrponYard Storm Drain Yard Storm Drain Observers Name: Trevor Rebel 13:22 13:23 Observation Time Title: Environmental Specialist 13:10 13:10 Time Discharge Began _______Signaure:____________________Were Pollutants ObservedNoN Signature:

_________________ (if yes, complete reverse side) No___________

______________

No___________

  1. 17 021 #18 023 Obsrvtin at: Ari 1 207Drainage Location Description Yard Storm Drain Yard Storm Drain Observers Name: Trevor Rebel 18:27 18:28 Observation Time Title: Environmental SDecialist 18:15 18:15-R I ~~~Time Discharge Began ______Signature:

L A-'- Were Pollutants Observed No No _(if yes, complete reverse side)__#17 021 #18 023 Obsrvtin at: ay 207Drainage Location Description Yard Storm Drain Yard Storm Drain Observers Name: _ ____NONE NONE Observation Time_____________

_____ _______Title:_____

__Time Discharge Began ____________

Signature:

___________________Were Pollutants Observed (if yes, complete reverse side) _________

_______________

SIDE B FORM 4-MONTHLY VISUAL OBSERVATIONS OF STORM WATER DISCHARGES DATE/TIME OF DRAINAGE AREA DESCRIBE STORM WATER DISCHARGE IDENTIFY AND DESCRIBE SOURCE(S)

OF DESCRIBE ANY REVISED OR NEW OBSERVATION DESCRIPTION CHARACTERISTICS POLLUTANTS BMPs AND THEIR DATE OF (From Reverse Side) IMPLEMENTATION Indicate whether storm water discharge is clear, EXAMPLE: Discharge from cloudy, or discolored; causing staining; containing EXAMPLE: Oil sheen caused by oil dripped by material storage Area #2 floating objects or an oil sheen, has odors, etc. trucks in vehicle maintenance area.013 Drainage Sediment observed in storm water. Extremelyheavy rainfall over 20 min Additional silt check dams 03/20/07 period dislodged some sediment and installed in the 013 path.soil.13:50 015 Drainage Sediment observed in storm water. Extremely heavy rainfall over 20 min Additional silt check dams 03/20/07 period dislodged some sediment and installed in the 015 path.soil.13:55 EAM flPM/ /F lAM F- PM/ /: lAM M PM FORM 5-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE: 06 / 04 1 07 INSPECTOR NAME: Trevor Rebel TITLE: Environmental Specialist SIGNATURE:

POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?

NO implementation FULL IMLEMETED Fx1N 0the next two columns of this Turbine Building form ARE ADDITIONAL/REVISED 0 YES BMPs NECESSARY?

[91 NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES If yes, to either implementation corrective actions and their date(s) of (as identified in your SWPPP) -FULLY IMPLEMENTED?

[91 NO question, complete implementation the next two columns of this Turbine Buttress form ARE ADDITIONAL/REVISED O YES BMPs NECESSARY?

rx! NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCEIINDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES If yes, to either ipeetto orcieatosadterdt~)o qu esto, ompeither implementation corrective actions and their date(s) of (asE/NUSRA identifie inE your SNWBPPNT EN P)E question, complete ipeetto (as identified in your SWPPP) FULLY IMPLEMENTED?

21 NO the next two columns of this U1 and U2 Transformer Yards form ARE ADDITIONAL/REVISED 0 YES BMPs NECESSARY?

[K NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additionallrevised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0YES If yes, to either implementation corrective actions and their date(s) of SUCINUTILATVTARA HVANBMsNTBE

]ESquestion, complete implementation (as identified in your SWPPP) FULLY IMPLEMENTED?

21 NO the next two columns of this Intake Areas form ARE ADDITIONALIREVISED 0 YES BMPs NECESSARY?

N] NO SIDE B FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS/ Y(/(AY6~CUMA IIATIAM flArr- flA I AlA i nl7 tM1Q0fTn0 JARMe Tra-nrw Pchgal Till ~ Fn~,irnnmi~nt~iI

~nrn~i~IiQtN ATI IRF: POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0l YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?

I] NO If yes, to either -implementation question, Hazardous Waste Facility complete the next two columns of this form ARE ADDITIONAL/REVISED 0l YES BMPs NECESSARY?

0] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCEIINDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0l YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?

[91 NO If yes, to either implementation question, Area 10 complete the next two columns of this form ARE ADDITIONAL/REVISED 0l YES BMPs NECESSARY?

IXI NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0l YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?

[M NO If yes, to either implementation question, Sewage Treatment Facility complete the next two columns of this ARE ADDITIONAL/REVISED El YES form BMPs NECESSARY?

[] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN [E YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?

[] NO If yes, to either implementation question, Sea Water Reverse Osmosis complete the Facili next two lity columns of this ARE ADDITIONAL/REVISED El YES form BMPs NECESSARY?

[] NO FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE: 06 / 08 / 07 INSPECTOR NAME: Trevor Rebel TITLE: Environmental Specialist SIGNATURE:

POTENTIAL POLLUTANT

  • Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?

0] NO If yes, to either implementation question, Make Up Water Treatment complete the next two Facility columns of this form ARE ADDITIONAL/REVISED 0 YES BMPs NECESSARY?

0] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?

EM NO If yes, to either implementation question, Waste Water Holding Facility complete the next two columns of this ARE ADDITIONAL/REVISED 0 YES form BMPs NECESSARY?

[K] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?

0] NO If yes, to either implementation question, Vehicle Maintenance Yard complete the next two columns of this ARE ADDITIONAL/REVISED 0 YES form BMPs NECESSARY?

21 NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additionalfrevised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?

[K NO If yes, to either implementation question, Fleet Vehicle Fueling complete the next two columns of this ARE ADDITIONALIREVISED 0 YES form BMPs NECESSARY?

(9J NO FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE: 06 / 04 / 07 INSPECTOR NAME: Trevor Rebel TITLE: Environmental Specialist SIGNATURE:

POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additionallrevised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?

0 NO If yes, to either implementation question, Marine Fueling Facility complete the next two columns of this form ARE ADDITIONAL/REVISED 0 YES BMPs NECESSARY?

IE] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN [91 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?

0 NO If yes, to either implementation question, Additional BMP have been found necessary Shooting Range complete the to control transport of lead (pb) from the Removal of fine sediment and silt from the next two DCPP Shooting Range. shooting range basin by 9-15-07.columns of this Installation of additional check dams and ARE ADDITIONALIREVISED

[K] YES sediment weirs at shooting range by BMPs NECESSARY?

0 NO 10-1-07.POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN E0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?

CRJ NO If yes, to either implementation question, 500 kV Switch Yard complete the next two columns of this ARE ADDITIONALIREVISED

[I YES form BMPs NECESSARY?

0] NO POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?

21 NO If yes, to either implementation question, 230 kV Switch Yard complete the next two columns of this ARE ADDITIONAL/REVISED 0 YES form BMPs NECESSARY?

[] NO FORM 5 (Continued)-ANNUAL COMPREHENSIVE SITE COMPLIANCE EVALUATION POTENTIAL POLLUTANT SOURCE/INDUSTRIAL ACTIVITY BMP STATUS EVALUATION DATE: 06 / 04 / 07 INSPECTOR NAME: Trevor Rebel TITLE: Environmental Specialist SIGNATURE:

POTENTIAL POLLUTANT Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA HAVE ANY BMPs NOT BEEN 0 YES implementation corrective actions and their date(s) of (as identified in your SWPPP) FULLY IMPLEMENTED?

[EX NO If yes, to either implementation question, Remote 12 kV Electrical complete the next two Transformers

-columns of this form ARE ADDITIONAL/REVISED 0 YES BMPs NECESSARY?

[CX NO POTENTIAL POLLUTANT HAVE ANY BMPs NOT BEEN 0 YES Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA FULLY IMPLEMENTED?

IM NO implementation corrective actions and their date(s) of (as identified in your SWPPP) If yes, to either implementation question, complete the next two ARE ADDITIONAL/REVISED

-7 YES columns of this BMPs NECESSARY?

[CX NO form POTENTIAL POLLUTANT HAVE ANY BMPs NOT BEEN 0 YES Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA FULLY IMPLEMENTED?

[CX NO implementation corrective actions and their date(s) of-(as identified in your SWPPP) If yes, to either implementation question, complete the next two ARE ADDITIONAL/REVISED 0] YES columns of this BMPs NECESSARY?

M] NO form POTENTIAL POLLUTANT HAVE ANY BMPs NOT BEEN 0 YES Describe deficiencies in BMPs or BMP Describe additional/revised BMPs or SOURCE/INDUSTRIAL ACTIVITY AREA FULLY IMPLEMENTED?

[CX NO implementation corrective actions and their date(s) of (as identified in your SWPPP) If yes, to either implementation question, complete the next two ARE ADDITIONAL/REVISED 0] YES columns of this BMPs NECESSARY?

[C] NO form The following narrative comments provide explanation, where required, for the 2006-2007 Annual Report for Storm Water Discharges Associated with Industrial Activities, Diablo Canyon Power Plant (DCPP), Facility WDID No. 3401018248.

General Comments: 1. Sample and observation times throughout the report are reported in 24-hr clock format.2. This is the first annual storm water report submitted by the Facility to the Regional Water Quality Control Board. Reference PG&E Letter DCL-2006-556 to the Central Coast Region dated November 09, 2006 regarding DCPP implementation of sampling and visual observations in accordance with provisions of the State General Industrial Storm Water Permit (General Permit).Section Specific Comments: Comments are arranged by section and item number.Section E. Number 2. -Did you collect storm water samples from the first storm of the wet season that produced a discharge during scheduled facility operating hours? (Section B.5 of the General Permit).Checked "No": An unexpected storm event on 11-14-06 dropped 0.28 inches of precipitation between 00:30 and 04:00 hours in the morning. This storm generated unexpected rainfall at the plant site outside of facility operation hours in which support staff were available and staged to conduct sampling.

The next qualifying storm event was sampled on 11-26-06.Section E. Number 5. -Was the sample collection or analysis reduced in accordance with Section B.7.d of the General Permit?Checked "Yes": If "YES", attach documentation supporting your determination that two or more drainage areas are substantially identical.

The following text describes each discharge location and sample point. Additionally, substantially identical drainages, not sampled, are described as required by Section E, Number 5: Boat -Marine Refueling Facility Runoff

Description:

Storm water generated near and around the marine refueling facility.Sample Point: Sample valve leading from concrete bermed area to final discharge approximately 10-ft away.003 -Yard Storm Drain

Description:

Storm water runoff from areas surrounding the seawater intake structure building.Sample Point: Sampled at 003 culvert inlet as close to point of discharge as practicable.

Storm water travels through the 003 culvert before combining with seawater discharge.

2006-2007 Annual Report Conmnents Section Page I of 5 004 -Yard Storm Drain to Retention Basin

Description:

Storm water drains to discharge 004 from the following areas on site: " Southeast side of the Unit 2 Turbine Building," Administration Building," Security Building," Training and Maintenance Shop Buildings," Parking lots 4 and 5," Meteorological tower area," A small area to the west side of the west plant access road," Hazardous Waste Storage Unit," Firewater storage tank," Truck bay, and" Firewater pump building.Sample Point: Sampled at the inlet to the 004 retention basin. When full, the retained water in the de-silting basin overflows a vertical riser then flows through approximately 100-ft of underground conduit to discharge.

005 -Yard Storm Drain

Description:

Storm Water drains to discharge 005 from the following areas on site: " Plant Yard on the Unit 2 side of Radioactive Waste Building" West side of the Turbine Building" Hazardous Materials Warehouse* Construction Offices" Parking lots 2, 3, 6, 7, and 8" Cold Machine Shop" Seawater Reverse Osmosis Facility" Biological Laboratory (not in service)" Fabrication Shop Sample Point: Located in large concrete drainage canal downstream of a de-silting weir. Water flowing past the sample point travels another 600-ft of concrete surface before entering a 4-ft diameter conduit leading to a final discharge location with limited access.006 -Yard Storm Drain

Description:

Storm water drains to discharge 006 from the following areas on site: " Pacific Ocean side of the ridge Southeast of the power plant." Warehouse B" Shooting Range" Outdoor Abrasive Blast Facility" Fleet Vehicle Fueling Facility" Parking Lot #1 Sample Point 006 at Discharge:

Sampled from the culvert outlet as it enters a v-ditch. Storm water travels another 75 feet to discharge.

Sample Point 006 Range Immediate Outlet: Sampled from culvert outlet immediately downstream of Diablo Canyon Shooting Range. Past the sampling point, storm water traverses 25-ft of concrete v-ditch, combining with upstream flows, before entering another underground culvert for 600-ft, then combination with other 006 pathway flows listed above. Combined storm water then travels approximately 75-ft to outfall. This pathway undergoes significant dilution as all 006 flows combine prior to discharge from the plant site.007 -Storm Water Runoff

Description:

Storm water from watershed South and East of the facility.

There are no industrial activities present in this path. Water discharges to an inaccessible rip-rap field west of the facility.Sampling:

This point is not sampled. The point is not downstream of industrial activity and the underground conduitdischarge location is not safely accessible.

2006-2007 Annual Report Cornments Section Page 2 of-5 008 -Yard Storm Drain

Description:

Storm water yard drains from the following areas: " Northwest side of the Turbine Building" Technical Maintenance Building" Watershed on the North Side of Diablo Creek to the Northwest of the power plant.Sample Point: Sample is taken from culvert inlet directly above discharge point. Note, this area has additional security requirements for access that may result in delayed sample times.009 -Yard Storm Drain

Description:

Storm water from the north and northeast side of the Unit I Auxiliary, Containment, Fuel Handling, and Turbine buildings drains to the north side of the yard to discharge.

Sample Point: Sample is taken from an accessible sump nearest the point of discharge.

From the sump, storm water then flows through an underground culvert 300-ft to a discharge location that is not safely accessible during storm events.010 -Yard Storm Drain

Description:

Runoff from the hillside betweenDCPP and the Raw Water Reservoirs drains into a concrete culvert that is routed to the north along steep inaccessible terrain prior to discharge.

Sample Point: This point is not sampled. Storm water collected from discharge 013 is substantially identical to this discharge point.011 -Yard Storm Drain

Description:

Runoff from Diablo Creek Road and the North sides of the 230 kV and 500 kV switch yards.Sample Point: Sample is taken at the inlet of an accessible drop in culvert nearest the point of discharge.

Storm water then travels another 500-ft across a concrete surface to a steep metal conduit leading to the discharge point. The final discharge point is not safely accessible during a storm event and is in an area subject to restricted security access.012 -Yard Storm Drain

Description:

Runoff from the area between the 230 KV Switchyard and the 500 KV Switchyard drains to a vertical shaft leading to an underground culvert and discharge.

Sample Point: This point is not sampled. Storm water sampled from discharge 011 and 013 are substantially identical to this discharge point.013 -Yard Storm Drain

Description:

-Storm water drains to 013 from the following areas: 0 Raw Water Reservoirs 0 Makeup Water Treatment Facility 0 230 kV Switchyard Sample Point: Sample taken from a sample well in the 013 concrete V-ditch. Water flows an additional 200-ft before entering an inaccessible metal conduit to discharge.

014 -Storm Water Runoff

Description:

Storm water runoff from lay down areas and the hillside south and east of the 500 KV Switchyard is collected in a drainage ditch and routed to discharge.

Sample Point: This point is not sampled. Storm water sampled from discharge points 013 and 015 are substantially identical to this discharge point.015 -Yard Storm Drain

Description:

Storm water runoff from the area around the temporary auto facilities and adjacent roadway is collected in a drainage ditch and discharged.

Sample Point: Sample taken from drop in culvert downstream of automotive facility.

After the sampling point, water flows 100-ft through an inaccessible culvert to rip-rap and discharge.

2006-2007 Annual Report Comments Section Page 3 of 5 018 -Yard Storm Drain

Description:

Storm water runoff from the east side of the Intake Structure building.Sample Point: This point is not sampled. Storm water sampled from discharge points 003 and 023 are substantially identical to this discharge point.020 -Intake Deck Storm Drain

Description:

Storm water collected directly in front of seawater traveling screen housings drains that lead to the circulating water pump fore bays through open gratings.Sample Point: This point is not sampled. Storm water sampled from discharge points 003 and 023 are substantially identical to this discharge point.021 -Yard Storm Drain

Description:

Screen wash over spray drains and storm water from the east side of the traveling screen deck.Sample Point: This point is not sampled. Storm water sampled from discharge points 003 and 023 are substantially identical to this discharge point.023 -Yard Storm Drain

Description:

Storm water generated on the North and East sides of Intake Structure Building and Intake roadways is drained through discharge point 023.Sample Point: Sampled at the drop in box culvert inlet approximately 10-ft prior to discharge.

Section E. Number 6. -Were all samples collected during the first hour of discharge?

Checked "No": First storm event sample point 009 yard storm drain discharge started at 11-26-06, 20:30 hrs. The sample was collected at 22:30 hrs due to safety and security concerns for personnel performing collection during night time hours.Section E. Number 9. -Did you collect and analyze samples of temporarily stored or contained storm water discharges from two storm events?Checked, "Yes", with the following clarifying information:

Sample point 004 for both the first and second storm events was sampled as a pre-release.

The 004 discharge path first fills a settling basin before flowing through a riser pipe to discharge.

Section E. Number 11. -Discharge Location and Sample Point Reference narrative comments for Section E. Number 5, above, for a description of discharge and sample point information.

Section F. Number 1.b. -Indicate whether you visually observed all authorized non-storm water discharges and their sources during the quarters when they were discharged.

Attach explanation for any "NO" answers.During the July -September quarter no inspections for authorized storm water discharges were made. In accordance with PG&E Letter DCL-2006-556 dated November 09, 2006 addressed to the California Regional Water Quality Control Board Central Coast Region, monitoring for industrial site storm water discharges in accordance with General Permit provisions were initiated during the October -December quarter.2006-2007 Annoual Report Comments Section Page 4 of 5 Section F. Number 2.a. -Indicate whether you visually observed all drainage areas to detect the presence of unauthorized non-storm water discharges and their sources. Attach explanation for any "NO" answers.During the July -September quarter no inspections for authorized storm water discharges were made. In accordance with PG&E Letter DCL-2006-556 dated November 09, 2006 addressed to the California Regional Water Quality Control Board Central Coast Region, monitoring for industrial site storm water discharges in accordance with General Permit provisions were initiated during the October -December quarter.Section G. Number 1. -Monthly Wet Season Visual Observations Attach an explanation for any "NO" answer months.October 2006 -No qualifying storm events producing discharge to waters of the state during daylight hours. A total of 0.07 inches of precipitation was received at the plant site on 10-13-06, however, the event did not produce sufficient runoff, and was not in daylight hours.November 2006 -An unexpected storm on 11-14-06 dropped 0.28 inches of precipitation between 00:30 and 04:00 hours in the morning. This storm was unexpected and did not occur during daylight hours.April 2007 -Several discharge observation points exceeded the 1-hour requirement.

This was due to the storm arriving in evening hours. Darkness arrived before sufficient runoff occurred at these locations as listed on Form-4 of the Annual Report. Observations were performed as soon as practical during daylight hours the following morning.May 2007 -Insufficient precipitation for May 2007. Rainfall/drizzle received on 05-04-07 produced only 0.03 inches of precipitation as measured at the Diablo Canyon Ocean Lab. The amount of precipitation, 0.03 inches, was insufficient to produce runoff.2006-2007 Annual Repori Conmiments Section Page 5 of 5 CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-o\v/ed BIusiness Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838 9 FAX (805) 545-0107 Page 1 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15462 N7120 Stormwater 11/27/06 12/06/06&NVOP C ýi REPORT OF ANALYTICAL RESULTS Sample Description 2006-Boat-1 (Boat Refuel)AnaLyte Sampled Sampled By Date @ Time Matrix Trevor Rebel 11/26/06@20:30 Aqueous Result DLR Dilution Units Method Date Factor Analyzed 480 1 1 umhos/cm SM 2510 11/27/06 Not Detected 5 1 mg/L EPA 1664 12/05/06 7.6 0.1 1 pH units EPA 150.1 11/27/06 390 5 1 mg/L EPA 160.2 11/29/06 17 0.1 1 mg/L EPA 200.7 12/05/06 Date Batch Prepared Electrical Conductance I" & Grease Suspended Solids Iron 65 272 65 174 261 12/04/06 DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-ownecI BLISkiess Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838
  • FAX (805) 545-0107 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA, 93424 Log Number: Order: Project: Received: Printed: 06-C15461 N7119 Stormwater 11/27/06 12106106 Page 1 , E NV. oPa. )REPORT OF ANALYTICAL RESULTS SampLe Descriptifn Sampled By 2006-ge-1 (NW Intake Btdg) Trevor Rebel= = = == = = == = = = = = = = === --------------------

Sampled Date @ Time 11/26/06@20:22 Matrix Aqueous Anatyte ResuLt DLR Dilution Units Factor----------------- -----------------. -.------------. ---. ------. ---.--------.- --.- -----Electrical Conductance t & Grease 3,400 8 6.9 580 23 1 5 0.1 5 0.1 1 1 1 umhos/cm mg/L pH units mg/L mg/L Method SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date AnaLyzed 11/27/06 12!05/06 11/27/06 11/29/06 12/05/06 Date Batch Prepared 65 272 65 174 Suspended Solids Iron 12/04/06 261 DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 -SAN LUIS OBISPO, CA 93401 * (805) 545-9838

  • FAX (805) 545-0107 Page 1 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15460 N7118 Stormwater 11/27/06 12/05/06 REPORT OF ANALYTICAL RESULTS Sample Description 2006-004-1 (Settle Basin)Analyte Sampled By Trevor Rebel Result Sampled Date @ Time 11126/06@20:43 DLR Dilution Units Factor Matrix Aqueous Method Electrical Conductance

& Grease Suspended Solids Iron 1,000 1 1 umhos/cm SM 2510 Not Detected 5 1 mg/L EPA 1664 7.3 0.1 1 pH units EPA 150.1 250 5 1 mg/L EPA 160.2 11 0.1 1 mg/L EPA 200.7 Date Analyzed 11/27/06 11/30/06 11/27/06 11/29/06 12/05/06 Date Batch Prepared 65 181 65 174 12/04/06 261 DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng () PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-SOSned BuLSiness 3Enrpise8 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838
  • FAX (805) 545-0107 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15464 N7122 Stormwater 11/27/06 12/06/06 Page 1:* -C L '.... .REPORT OF ANALYTICAL RESULTS Sample Description 2006-005-1 (005 Area 10 Ditch)Anatyte Sampled By Trevor Rebel Sampled Date @ Time 11/26/06@21:00 Matrix Aqueous Result DLR Dilution Factor Units Method Date Date Analyzed Prepared Batch Electrical Conductance L & Grease 2,100 10 1 5.1 9.1 0.1 1 Suspended Solids 660 5 1 Iron 14 0.1 1------- ......-----------------------------------.----------.--------------

DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.umhos/cm mg/L pH units mg/L mg/L SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 11/27/06 12/05/06 11127106 11/29/06 12/05/06 65 272 65 174 12/04/06 261 CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng ( PRINTED ON RECYCLED PAPER

  • CREEK ENVIRONMENTAL LABORATORIES,_INC.

A Mino-ity-owned Business Enteuprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838
  • FAX (805) 545-0107 Page 1 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15463 N7121 Stormwater 11/27/06 12/06/06~NV.OPS.REPORT OF ANALYTICAL RESULTS Sampled Date @ Time Sample Description 2006-006B-I (006 Storm Grate in Lot #1)Anatyte Sampled By Trevor Rebel----------

== == == == ==Matrix 11/26/06@21:10 ution Units Aqueous Result DLR DiLu Method Date Date Analyzed Prepared Batch Factor----------------------------------. -.------. ---. -. ---. ------. ---.--------.- --.- -----ectricat Conductance.L & Grease pH Suspended Solids Iron 170 Not Detected 9.3 57 2.1 1 5 0.1 5 0.1 1 1 1 1 umhos/cm mg/L pH units mg/L mg/L SM 2510. 11/27/06 EPA 1664 12/05/06 EPA 150.1 11/27/06 EPA 160.2 11/29/06 EPA 200.7 12/05/06 12/04/06----------------..----------.----------

65 272 65 174 261 DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng% PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minoirity-owneod I3usiness Enterrkie 61M -" 14i SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 e (805) 545-9838
  • FAX (805) 545-0107 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15466 N7124 Stormwater 11/27/06 12/06/06 Page 1 S .. ... .... .L LeNV._OP$

__REPORT OF ANALYTICAL RESULTS Sample Description 2006-006A-1 (Shoot Range Eff)AnaLyte Sampled Sampled By Date @ Time Matrix Trevor Rebel 11/26/06@21:56 Aqueous Result DLR Dilution Factor Units Method Date Date Batch Analyzed Prepared Electrical Conductance L & Grease 150 1 1 umhos/cm SM 2510 11/27/06 65 Not Detected 5 1 mo/L EPA 1664 12105/06 272 Suspended Solids Iron Lead 8.4 100 2.7 0.14 0.1 5 0.1 0.02 1 1 1 1 pH units mg/L mg/L mg/L EPA 150.1 EPA 160.2 EPA 200.7 EPA 200.7 11/27/06 11/29/06 12/05/06 12/05/06 65 174 12/04/06 261 12/04/06 262 DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER C CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-ovnecd Business Eniterprise 141 SUBURBAN ROAD, SUITE C-5 -SAN LUIS OBISPO, CA 93401 -(805) 545-9838

  • FAX (805) 545-0107 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15455 N7113 Stormwater 11/27/06 12/05/06* Pagel1 L~tiNV. OPS.REPORT OF ANALYTICAL RESULTS Sample Description 2006-008-1 (008-Diab Creek)Analyte Sampled By Trevor Rebel Sampled Date @ Time 11/26/06@21:39 Matrix Aqueous Result DLR Dilution Factor Units Method Date Date Analyzed Prepared Batch Electrical Conductance

.& Grease.I Suspended Solids Iron 940 Not Detected 6.8 18 1.2 1 5 0.1 5 0.02 1 1 1 1 1 umhos/cm mg/L pH units mg/L mg/L SM 2510 EPA 1664 11/27/06 11/30/06 65 181 EPA 150.1 11/27/06 65 EPA 160.2 11/29/06 174 EPA 200.7 12/05/06 12/04/06 262----------------.-.--------.--.--------.--.

DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON.RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A 4 UiAnority-o\\ U -SL Fsoness Enter prise 141 SUBURBAN ROAD, SUITE C-5 -SAN LUIS OBISPO, CA 93401 * (805) 545-9838

  • FAX (805) 545-0107 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15458 N7116 Stormwater 11/27/06 12/05/06 Page 1 FNV. OPS.REPORT OF ANALYTICAL RESULTS Sample Description 2006-009-1 (009-N Protected)

AnaLyte Sampled By Trevor Rebel Sampled Date @ Time 11/26/06@22:30 Matrix Aqueous Result DLR Dilution Units Method Factor................-----------------


.----------.------------.-------


Electrical Conductance 450 1 1 umhos/cm SM 2510& Grease Not Detected 5 1 mg/L EPA 1664.1 7.0 0.1 1 pH units EPA 150.1 Suspended Solids 11 5 1 mg/L EPA 160.2 Iron 0.80 0.02 1 mg/L EPA 200.7.....-----------.-------------.---------------------------.------------.--------------------------

DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng Date Date Analyzed Prepared 11/27/06 11/30/06 11/27/06 11/29/06 12/05/06 12/04/06 Batch 65 181 65 174 262 0 PRINTED ON RECYCLED PAPER

  • CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 e SAN LUIS OBISPO, CA 93401 9 (805) 545-9838
  • FAX (805) 545-0107 Page 1 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15456 N7114 Stormwater 11/27/06 12/05/06 REPORT OF ANALYTICAL RESULTS Sampted Sample Description Sampled By Date @ Time Matrix 2006-011-1 (Diablo Creek Dr.) Trevor Rebel 11/26/06@21:32 Aqueous AnaLyte Result DLR Dilution Units Method Factor Electrical Conductance 230 1 1 umhos/cm SM 2510& Grease Not Detected 5 1 mg/L EPA 1664., 7.3 0.1 1 pH units EPA 150.1 Suspended Solids 38 5 1 mg/L EPA 160.2 Iron 2.0 0.02 1 mgIL EPA 200.7 Date Analyzed 11/27/06 11/30/06 11/27/06 11/29/06 12/05/06 Date Batch Prepared 65 181 65 174 12/04/06 262 DIR-----.Detection

limit...for.

Reporting.

Reutso--o Deeced are---....

below.....

DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER C CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owined Business Enterpirise 141 SUBURBAN ROAD, SUITE C-5 e SAN LUIS OBISPO, CA 93401 * (805) 545-9838 -FAX (805) 545-0107 Page 1 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15465 N7123 Stormwater 11/27/06 12/06/06 REPORT OF ANALYTICAL RESULTS Sample Description 2006-013-1 (013-Below reservoir and adj. 230 kv. yard Analyte sampled Sampled By Date @ Time Trevor Rebel 11/26/06@21:21 Matrix Aqueous=============================

Result DLR Dilution Units Method Date Date Analyzed Prepared Batch Factor ectricaL Conductance it & Grease pH 320 Not Detected 8.5 7 0.1 1 umhos/cm 1 mg/L 1 pH units SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 11/27/06 12/05/06 11/27/06 11/29/06 12/05/06 65 272 65 174 12/04/06 261 Suspended Solids 760 5 1 mg/L Iron 16 0.1 1 mg/L DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng Q PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838 o FAX (805) 545-0107 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15457 N7115 Stormwater 11/27/06 12/05/06 Page 1 KN -V. P ENV. OPS.REPORT OF ANALYTICAL RESULTS Sample Description 2006-015-1 (015-Adj Garage)AnaLyte Sampled By Trevor Rebel Result Sampled Date @ Time 11/26/06@21:26 DLR Dilution Units Factor Matrix Aqueous Method Date Date Batch Analyzed Prepared Electrical Conductance

& Grease.6.Suspended Solids Iron 180 Not Detected 8.2 190 8.8 1 5 0.1 5 0.02 1 umhos/cm 1 mg/L 1 pH units 1 mg/L 1 mg/L------------.-.---------

SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 11/27/06 11/30/06 11/27/06 11/29/06 12/05/06 12/04/06----------.-.---------

65 181 65 174 262 DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838 a FAX (805) 545-0107 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 06-C15459 N7117 Stormwater 11/27/06 12/05/06 Page 1 F N.rp;REPORT OF ANALYTICAL RESULTS Sample Description 2006-023-1 (Intake Rd.)Sampled By Trevor Rebel Sampled Date @ Time 11/26/06@20:25 Matrix Aqueous Analyte Result DLR Dilution Units Factor Electrical Conductance 940 1 1 umhos/cm-& Grease Not Detected 5 1 mg/L 6.7 0.1 1 pH units Suspended Solids 210 5 1 mg/L Iron 10 0.1 1 mg/L DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.Method SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date Date Batch Analyzed Prepared----------.-.---------.----

11/27/06 65 11/30/06 181 11/27/06 65 11/29/06 174 12/05/06 12/04/06 261----------.-.---------.-.-

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng ( PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 ° SAN LUIS OBISPO, CA 93401 ° (805) 545-9838 -FAX (805) 545-0107 Page 8 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1782 0825 Stormwater 02/08/07 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time 2006-Boat-2 (Boat Dock) Trevor Rebel 02/07/07@14:34 Analyte Result DLR Dilution Units Factor Matrix Aqueous Method Electrical Conductance 240 1 1 umhos/cm SM 2510-iL & Grease Not Detected 5 1 mg/L EPA 1664 7.8 0.1 1 pH units EPA 150.1 Suspended Solids 230 5 1 mg/L EPA 160.2 Iron 10 0.02 1 mg/L EPA 200.7-------------------------------------------------. -.--------.- .- ----......- -......................DLR Detection Limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng Date Analyzed 02/08/07 02/20/07 02/08/07.02/14/07 02/13/07 Date Batch Prepared 2045 02/15/07 2402 2045 2329 2234 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 -SAN LUIS OBISPO, CA 93401 * (805) 545-9838 -FAX (805) 545-0107 Page 6 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1780 0825 Stormwater 02/08/07 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time 2006-003-2 (NW Intake BLdg) Trevor Rebel 02/07/07@14:27 Analyte Result DLR Dilution Units Factor Electrical Conductance 610 1 1 umhos/cm--it & Grease 8 5 1 mg/L 7.3 0.1 1 pH units Suspended Solids 330 5 1 mg/L Iron 18 0.02 1 mg/L DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.Matrix Aqueous Method SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date Analyzed 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 Date Batch Prepared 2045 02/15/07 2402 2045 2329 2234 CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 ° SAN LUIS OBISPO, CA 93401 -(805) 545-9838

  • FAX (805) 545-0107 Page 12 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1786 0825 Stormwater 02/08/07 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time 2006-004-2 (Settling Basin) Trevor Rebel 02/07/07@14:38 Matrix Aqueous Analyte Result DLR Dilution Factor Units Electrical Conductance nit & Grease Suspended Solids Iron 480 Not Detected 7.0 44 1.9 1 5 0.1 5 0.02 1 1 1 1 1 umhos/cm mg/L pH units mg/L mg/L Method SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date Analyzed 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 Date Batch Prepared 2045 02/15/07 2402 2045 2329 2234 DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838 a FAX (805) 545-0107 Page 11 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1785 0825 Stormwater 02/08/07 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time 2006-Path 005-2 (Area 10 Ditch) Trevor Rebel 02/07/07@14:42 Matrix Aqueous Analyte Result DLR Dilution Factor Units Method Electrical Conductance 630 1 1 umhos/cm SM 2510')il & Grease Not Detected 5 1 mg/L EPA 1664 7.8 0.1 1 pH units EPA 150.1 Suspended Solids 86 5 1 mg/L EPA 160.2 Iron 2.7 0.02 1 mg/L EPA 200.7 DLR Detection limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Date Analyzed 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 Date Prepared Batch 2045 02/15/07 2402 2045 2329 2234 Lab Director, Michael Ng PRINTED ON RECYCLED PAPER Q CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 a SAN LUIS OBISPO, CA 93401 * (805) 545-9838

  • FAX (805) 545-0107 Page 9 Trevor Rebel Diablo Canyon Pc P.O. Box 56 Avila Beach, CA Dwer Plant Log Number: Order: Project: Received: Printed: 07-C1783 0825 Stormwater 02/08/07 02/20/07 93424 REPORT OF ANALYTICAL RESULTS Sample Description 2006-006B-2 (Lot #1)Analyte Sampled Sampled By Date @ Time Trevor Rebel 02/07/07@14:49 Matrix Aqueous Result DLR Dilution Factor Units Method Electrical Conductance 120 1 1 umhos/cm'l & Grease Not Detected 5 1 mg/L 1 8.3 0.1 1 pH units Suspended Solids 44 5 1 mg/L Iron 2.0 0.02 1 mg/L DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date Analyzed 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 Date Batch Prepared 2045 02/15/07 2402 2045 2329 2234 CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 -(805) 545-9838
  • FAX (805) 545-0107 Page. 2 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Received: Printed: 07-C2138 00969 02/14/07 02/27/07 REPORT OF ANALYTICAL RESULTS Sample Description 006 Lot 1 AnaLyte Sampled By Trevor Rebel Result Sampled Date @ Time 02/07107@14:49 DLR Dilution Units Factor Matrix Aqueous Method Date Date Batch Analyzed Prepared EPA 200.8 02/22/07 02/22/07 2509 EPA 6020 02/22/07 2505----------------.-.--------.--.--------.--.

Lead 0.004 0.001 11 mg/L ead, TCLP extract Not Detected O004 0.1 mg/L DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director; Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 ° SAN LUIS OBISPO, CA 93401 * (805) 545-9838

  • FAX (805) 545-0107 Page 10 Trevor Rebel Diablo Canyon Pc P.O. Box 56 Avila Beach, CA ower Plant Log Number: Order: Project: Received: Printed: 07-C1784 0825 Stormwater 02/08/07 02/20/07 93424 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time 2006-006A-2 (Shooting Effluent)

Trevor Rebel 02/07/07@14:56 Matrix Aqueous Analyte-----------


Result DLR Dilution Factor Units Electrical Conductance 130 1 1 nit & Grease Not Detected 5 1 8.0 0.1 1 Suspended Solids 40 5 1 Iron 1.2 0.02 1 DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.umhos/cm mg/L pH units mg/L mg/L Method SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date Analyzed 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 2045 02/15/07 2402 2045 2329 2234 Date Prepared Batch CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.-A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 .SAN LUIS OBISPO, CA 93401 -(805) 545-9838

  • FAX (805) 545-0107 Page 1 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Received: Printed: 07-C2137 00969 02/14/07 02/27/07 REPORT OF ANALYTICAL RESULTS Sample Description 006 Range Analyte Sampled By Trevor Rebel Sampled Date @ Time 02/07/07@14:46 Matrix Aqueous Result DLR Dilution Factor Units Method----------------------------------




Date Analyzed 02/22/07 02/22/07 Date Batch Prepared 02/22/07 2509 2505 Lead 0.13 0.001 1 mg/L'ead, TCLP extract 0.13 0.04 0.1 mg/L DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.EPA 200.8 EPA 6020 CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838
  • FAX (805) 545-0107 Page 4 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1778 0825 Stormwater 02/08/07 02/20/07 REPORT OF ANALYTICAL RESULTS Sample Description 2006-008-2 (Diablo Creek)Analyte Sampled Sampled By Date @ Time Matrix Trevor Rebel 02/07/07@14:30 Aqueous Result DLR Dilution Units Method Date Date Batch Factor Analyzed Prepared Electrical Conductance "2,100 1 1 umhos/cm SM 2510-;L & Grease Not Detected 5 1 mg/L EPA 1664 6.7 0.1 -1 pH units EPA 150.1 Suspended Solids 33 5 1 mg/L EPA 160.2 Iron 1.6 0.02 1 mg/L EPA 200.7 DLR Detection Limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 2045 02/15/07 2402 2045 2329 2234 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 e SAN LUIS OBISPO, CA 93401 * (805) 545-9838

  • FAX (805) 545-0107 Page 1 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1775 0825 Stormwater 02/08/07 02/20/07 REPORT*OF ANALYTICAL RESULTS Sample Description 2006-009-2 (NW Protected Area)Analyte Sampled By Trevor Rebel Sampled Date @ Time 02/07/07@14:45 Matrix Aqueous Result DLR Dilution Units Method Factor Electrical Conductance"iL & Grease 130 Not Detected 6.6 1 5 0.1 1 1 1 umhos/cm mg/L pH units mglL mg/L SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date Date Batch Analyzed Prepared 02/08/07 2045 02/15/07 02/13/07 2268 02/08/07 2045 02/14/07 2329 02/13/07 2234 Suspended Solids 18 5 1 Iron 0.17 0.02 1 DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.I----------

CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838
  • FAX (805) 545-0107 Page 5 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1779 0825 Stormwater 02/08/07 02/20/07 REPORT OF ANALYTICAL RESULTS Sampled Sample Description Sampled By Date @ Time 2006-011-2 (Diabto Creek Rd. Trevor Rebel 02/07/07@15:12 Culvert Inlet)AnaLyte Result DLR Dilution Units Factor Matrix Aqueous Method I Date Date Analyzed Prepared Batch electrical Conductance I & Grease pH Suspended Solids Iron 190 Not Detected 7.5 30 1.3 1 5 0.1 5 0.02 1 1 1 1 1 umhos/cm mg/L pH units mg/L mg/L SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 2045 02/15/07 2402 2045 2329 2234 DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838
  • FAX (805) 545-0107 Page 2 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1776 0825 Stormwater 02/08/07 02/20/07 Sample Description 2006-013-2 (V-Ditch Below Reservoir)

Anatyte REPORT OF ANALYTICAL RESULTS Sampled Sampled By Date @ Time Trevor Rebel 02/07/07@15:03 Result DLR Dilution Units Factor Matrix Aqueous-.....=================

Method*Lectrical Conductance 260 1 1 umhos/cm I & Grease Not Detected 5 1 mg/I pH 7.8 0.1 1 pH units Suspended Solids 200 5 1 mg/L Iron 4.8 0.02 1 mg/L DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date Analyzed 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 Date Batch Prepared 2045 02/15/07 2402 2045 2329 2234 CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng 0 PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC.A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5 -SAN LUIS OBISPO, CA 93401 * (805) 545-9838

  • FAX (805) 545-0107 Page 3 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1777 0825 Stormwater 02/08/07 02/20/07 REPORT OF ANALYTICAL RESULTS Sample Description 2006-015-2 (Downstream NPG Garage)Analyte Sampled By Trevor Rebel Sampled Date @ Time 02/07/07@15:07 ution Units tor Matrix Aqueous Result DLR Dilu Fac Method Date Date Batch Analyzed Prepared-tectrical Conductance At & Grease pH Suspended Solids Iron 140 Not Detected 8.0 86 2.6 I 5 0.1 5 0.02 I umhos/cm mg/L pH units mg/L mg/L SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 2045 02/15/07 2402 2045 2329 2234 DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng t PRINTED ON RECYCLED PAPER CREEK ENVIRONMENTAL LABORATORIES, INC..A Minority-owned Business Enterprise 141 SUBURBAN ROAD, SUITE C-5

  • SAN LUIS OBISPO, CA 93401 * (805) 545-9838 -FAX (805) 545-0107 Page 7 Trevor Rebel Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Log Number: Order: Project: Received: Printed: 07-C1781 0825 Stormwater 02/08/07 02/20/07 REPORT OF ANALYTICAL RESULTS Samp I ed Sample Description Sampled By Date @ Time 2006-023-2 (Intake Road) Trevor Rebel 02/07/07614:30 Anatyte Result DLR Dilution Units Factor Matrix Aqueous Electrical Conductance

'it & Grease 370 Not Detected 6.9 180 3.1 1 5 0.1 5 0.02 1 1 1'1 umhos/cm mg/L pH units mg/L mg/L Method SM 2510 EPA 1664 EPA 150.1 EPA 160.2 EPA 200.7 Date Analyzed 02/08/07 02/20/07 02/08/07 02/14/07 02/13/07 Date Prepared 2045 02/15/07 2402 2045 2329 2234 Batch Suspended Solids Iron DLR = Detection Limit for Reporting.

Results of "Not Detected" are below DLR.CREEK ENVIRONMENTAL LABORATORIES Lab Director, Michael Ng q PRINTED ON RECYCLED PAPER Creek- Environmental Laboratorloms, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 nlamn-oit-usoway Order # /* Please Print in Pen Client Name Contact Phone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Nor~ITEJ Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print, / Comments:

Storm Water Set 1 Matrix Key: DW = Drinking Water"1 Qol r-I AQ = Aqueous SL = Soil/Solid Date/Time Samaled#of Matrix Bottles Preservative, Sample Descriotion Analysis 2006-Boat-I

,,oi- Oil and Grease, ph, EC, TSS, Fe AQ. 3 (Boat Refuel)RELINQUISHED BY DATE/TIME RECEIVED BY UreeV Lnvironmental Laboratorins, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805).545-9838 fax (805) 545-0107* Please Print in Pen Order# # /P?Client Name Contact Phone JJDue Date: ....Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other 7ormaITA#7 Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:

Storm Water Set 1 Matrix Key: DW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time.

  1. of Sample Description A, Sampled Analysis Matrix Bottles Preservative I Type Bottles Creek Lab Sample #2006-0 1 i -~~' Oil and Grease, ph, EC, TSS, Fe AQ 3 ...e .rB (NW In ae Bldg) ___.N .......RELI'NQUISHED BY DATEITIME RECEIVED BY (Sg)(Print) (Organization) (Sign) (Pit (Organization)

"7iFe.,PA-40,Xj.Q.-

ENVE OPS L~-I"ISO I Creek Environmental Laboratories.

Inc.I Ureel' Environmental Laworatori-s, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 unain-oi-uu s-oqy Order# h, 0 leIade rilL in Puen Client Name Cotc IPhone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Normal TAT Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:

Storm Water Set I Matrix Key: DW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time

  1. of Sample Description Sampled Analysis Matrix Bottles Preservative/

Type Bottles Creek Lab Sample #If.n ,-, Oil and Grease, ph, EC, TSS, Fe AQ 3 .-Pu Q- A 2006-004-1 SArn2!S44 100m-(Settle Basin) __V RELINQUISHED BY DATE/TIME RECEIVED BY (Sign) (Print) (Organization) (Sign) (Print) (Organization)

.... .AN V E 0 P ."__-__.I0t-2-74-Itl.A IkK4-Y&A,/,- 0516 r v Creek Environmental T nhnrntnrie.v.

Tne.

Creek- Environmental Laboratories, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Uhain-ot-uustoay Order # ALL 2 2.* PI~,g~ Print in P~n Client Name Contact Phone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other No malTAi Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:

Storm Water Set 1 Matrix Key: DW = Drinking Water I.AQ = Aqueous SL =Soil/Solid Date/Time U of Sample Description Sampled Analysis Matrix Bottles Preservative/

Type Bottles Creek Lab Sample #2006-005-1 Oil and Grease, ph, EC, TSS, Fe AQ 3 P Q R 3 250 444 ,, i , (005 Area 10 Ditch)_ ___i RELINQUISHED BY DATE/TIME RECEIVED BY (Sign)~~~~~4 (Print)4 (Ogaiztin (Sg)(rit Ogaiain J E.44 $$.* 4444S4 L." 7& .1 Creek Environmental Creek- Environmental Laboratorip-s, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Chain-ot-Uustody Order #

  • Pl~i~c~ Pr~rt in P0,, Client Name Contact hone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Normal TAT Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435.

Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:

Storm Water Set I Matrix Key: DW = Drinking Water I AQ = Aqueous SL = Soil/Solid Date/Time

  1. of Sample Description Sampled Analysis Matrix Bottles Preservative IType Bottles Creek Lab Sample #2006-006B-1, (&4o7-' Oil and Grease, ph, EC, TSS, Fe AQ 3 "/n Q 206-0 0 B 1 "G112O 100 ml,.. .(006 Storm Grate in Lot #1) ' -RELINQUISHED BY DATE/TIME RECEIVED BY (Sign) (Print) (Organization) (Sign) (Print) (Organization)

P-)d7- 1/4

%.r1.0 ;, i .vironmental Laborat ies, Inc.Chain-of-Custody Order #_ ______141 Subu. .i Road, Suite C-5,,San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107.Please Print in Pen Client Name Contact Phone 1'DueDate:

N a 1 Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other al Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:

Storm Water Set I MaAQ = Aqueous SL = Soil/Solid Date/Time#of lottles 121 Sample Description 2006-006A-1 (Shoot Range Eff)I I RELINQUISHED BY Cree'- Environmental Laboratorves, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (80)) 545-0107 OrderU _- UY Order # _,J)711-0 Client Name rContact f Phone 1.Due Date: Diablo Canyon Power Plant Trevor Rebel J[805.545.3607 24Hr 48Hr Other Normal TAT Address City State Zip Fax Cell*PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip samPler Name (Print) Comments:

Storm Water Set I Matrix Key: OW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time

  1. of Sample Description Sampled Analysis Matrix Bottles Preservative I Type Bottles Creek Lab Sample #Oil and Grease, ph, EC, TSS, Fe AQ 3 -P/j .. Q-4, A 2006-008-1 AG1-jSO 100 .-(008- Diab Creek)(/LSign) .,... rintg (Organization). (sign) (Print) (Organization)

' " ENVE OPS/f//I//Q I 5~su,.Creek Environmental 1 .ahnpofniAAC T"'.I

,re'-K Invironmental Laboratc ies, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Chain-of-C

~stody Order #_______S* PI~~ Print in PAn Client Name Contact Phone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Normal TAT Address city State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:

Storm Water Set I Matrix Key: DW = Drinking Water I AQ = Aqueous SL = Soil/Solid DatelTime

  1. of Sample Description Sampled Analysis Matrix Bottles Preservative

/ Type Bottles Creek Lab Sample #fv'l-o.-O Oil and Grease, ph, EC, TSS, Fe AQ 3 P/unp Q- Aý2006-009-1.

AGIH2SO41000ml-(009 N Protected) 09- ote t RELINQUISHED BY DATE/TIME RECEIVED BY (Sign) (Print) (Organization (Sign) " (Print) (Organization)

"-- [

j._ ENVEOPS 1 ., ...I QIQ'" I obF2/I & 6~&-HA~4 Creek Environmental T Qh.VQ+hAw1Atn If", Iu k, reeK Lnvironmentai Laborator"s, Inc.141 Suburban Koad, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Chain-of-Cu

..tody Order # -//7///." Please Print in Pen --'%, Client Name Contact Phone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:

Storm Water Set I Matrix Key: DW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time Sampled# Of Matrix Bottles Sample Description Analysis 2006-011-1 t,.z.,4 Oil and Grease, ph, EC, TSS, Fe AQ 3 (DiabloCreek Dr)KtLINQUISHED Y DATE/TIME RE EIVE Y Creek- Environmental Laboratorins, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 unaln-oi-tuswouy Order# Y'/'710Z.Please Print in Pen Client Name Contact Phone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Normal TAT Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:

Storm Water Set I Matrix Key: DW = Drinking Water AQ = Aqueous SL = Soil/Solid Date/Time Sam oled# of Matrix Bottles Samole Descriotion Analvsis 2 0 -1 Oil and Grease, ph, EC, TSS, Fe AQ 3 2006-013-1 (013 -Below reservoir and adj 230 kv yard)RELINQUISHED BY DATEITIME RECEIVED BY

.;relK t-nvironmental Laboratcvies, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Chain-of-C .stody Order #S Please Print in Pen Client Name Contact Phone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Nornral'TAT)II Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.44,1.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:

Storm Water Set I Matrix Key: DW = Drinking Water-AQ = Aqueous SL = Soil/Solid DatelTime

  1. of Sample Description Sampled Analysis Matrix Bottles Preservative I Type Bottles Creek Lab Sample #it-22v-01-, Oil and Grease, ph, EC, TSS, Fe AQ 3 Plu*-0.20106-015-1 AG12Sk 1000___ ______(015 -AdjGarage)

RELINQUISHED BY DATE/TIME RECEIVED BY (Sign) (Prin~t) (Organization) (Sign) (Print) (Organization) j 0 1 rZ_ ENVE OPS -I I I i -1*OL I ~<.63~S~9 Creek Environmental Creek. Environmental Laboratories, Inc.141 Suburban Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Chai-rod-cus# ly Order # tf ' *7J/7 0 D1 0 ; f; D Client Name Contact Phone Due ate: Diablo Canyon Power Plant Trevor Rebel .805.545.3607 24Hr 48Hr Other Normal TAT Address City State Zip Fax Cell P0 Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:

Storm Water Set 1 Matrix Key: DW = Drinking Water I AQ = Aqueous SL = Soil/Solid Date/Time

  1. of Sample Description a led Analysis Matrix Bottles Preservative I Type Bottles Creek Lab Sample #2-v,-o Oil and Grease, ph, EC, TSS, Fe AQ 3 P n AG/12SO4 1000 ~ml-B'2006-023-1 RI0 5 i-](intake Rd), RELINQUISHED BY DATErrlME RECEIVED BY (sign) (Print) (Organization) (Sign) .(Print) (Organization)

NVE OP3/4i i I I1-?<.I XYIý'Creek Environmental Laboratories.

Inc.

SreeFK rnvironmenial LaDoraior*'s, inc.141 Suburbau Road, C-5, Sm Luis Obispo, CA 93401 phont (905) 545-9838 fax (805) 545-0107 Unaln-ol-COd

  1. to Order 4* Please Print in Pen Client Name I Contact " Phone I Due Date: Diablo Canyon Power PlantI Trevor Rebel 805.545.3607 1 24Hr 48Hr Other Normal TAT jc Address City State Zip Fax Cell PO Box 66, Av~la Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number j PO# Copies To: Stormwater Bill to: (if different from above) Address City State Zip Sampler Name (Print) Comments:

Storm Water Set 2 Matrix Key: DW = Drinking Water ,[ AQ = Aqueous SL = SoillSolid DatelTime or Sample Description Sampled Analyis Matrrx Bobes. Pmserv.ITypB SotUs Cm*1.ub Smnmple 9 2006-003-2 (NW Intake Bldg) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 Plump .-A mll; .2006-023-2 (Intake Road) 2-7.07 Oil and Grease, ph, EC, TSS, Fe AQ 3 P/unp --.~~~~~~.A0Ga2idO411ool"-00 : -2006-Boat-2 (Boat Dock) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 Plo.ip ..A'AG./H2,6O410'0-04"Mi

-_- .f--T 2`50 mI-C -137.2.: 2006-006B-2 (Lot#l) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 PlUnp Q1-A.-.AGIH2 O4 OO-I-2006-OO6A-2 (Shooting Effluent) Oil and Grease, ph, EC, TSS, Fe AQ 3 P/l ..A AGNI2ý1010Q mIB _7Q, 2006-Path 005-2 (Area 10 Ditch) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 30Plunp .-.A AG/H29O 100 49:8~2006-004-2 (Settling Basin) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 QP.up-. A .AGH2SO4 1000 mi-B : RELINQUISHED BY DATEOrME RECEIVED BY (sign (?Tnt (Organization)(Sign (Print) (Organization) j / Trevor Rebel ENVE OPS V-6"_7____________

()~Creek Environmental L_ 0 Laboratories, Inc.PORLABl*EONLY:-

od:- *Lab/ Curer: "S ". .eCo lions: Inz "I& Y -Cust dy aleYI-- .--

LrepK :nvlronmental Laboratorz's, Inc.141 Suburbaa Road, Suite C-5, San Luis Obispo, CA 93401 phone (805) 545-9838 fax (805) 545-0107 Chaln-ot-Cu tody Order #SPease Print in Pen Client Name Contact Phone Due Date: Diablo Canyon Power Plant Trevor Rebel 805.545.3607 24Hr 48Hr Other Normal TAT Address City State Zip Fax Cell PO Box 56, Avila Beach CA 93424 805.545.3459 Beeper 805.441.5435 Project Name/Number PO# Copies To: Stormwater Bill to: (If different from above) Address City State Zip Sampler Name (Print) Comments:

Storm Water Set 2 Matrix Key: DW = Drinking Water AQ = Aqueous SL = SofI/Solid DatelTime

  • OF Sample Description Sampled Analysis Matrix Prewwvof Type BaWas Cea, Lab Sa-smple#2006-009-2 (NW Protected Area) 2.7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 .P1Ulip .,Q-:A;-AG/HsO4 1060 ml*l..!_ _ _ _ _ _ __--_ _-_ _._ /H .> 5 0 rm ,-C : ..-_. _ _- _ _- _ _. _2006-013-2 (V-Ditch Below Reservoir) 2-7-0'7 Oil and Grease, ph, EC, TSS, Fe' AQ 3 Plunp.Q.-:

A .'..!2006-015-2 (Downstream NPG Garage) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 J AGMW2"O 16004h mi-B A 2006-008-2 (Diablo Creek) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 .Piu rp ,--.;2006-011-2 (Diablo Creek Rd Culvert Inlet) 2-7-07 Oil and Grease, ph, EC, TSS, Fe AQ 3 Ap 1620--)E : .25 " r.B RELINQUISHED BY DATEITIME RECEIVED BY Pr(s0a) zationS (Sign) "Print) (Organization)

Trevor Rebei ENVE OPS 250 Creek Environmental

_______________

rLaboratorik Inc..."FoLAa S on :e1odf t.Lab! Couri .sa Ccnhlo1ndacti o1W, N C" Sealed:- Cold' W- N