CLINTON POWER STATIONJob Performance MeasureDetermine an emergency dose for a job and select a worker to perform the jobJPM Number: 997777.0301Revision Number: 00 Date: 7/29/03Developed By: T. Pickley 8/10/03 InstructorDateValidated By: J. Anderson 10/16/03SME or InstructorDateReview By: P. Ryan _8/18/03Operations RepresentativeDate Page 2 of 8JOB PERFORMANCE MEASURE VALIDATION CHECKLISTNOTE:All steps of this checklist should be performed upon initial validation. Prior to JPMusage, revalidate JPM using steps 8 through 11 below.________1. Task description and number, JPM description and number are identified.________2. Knowledge and Abilities (K/A) references are included.
________3. Performance location specified. (in-plant, control room, or simulator)
________4. Initial setup conditions are identified.
________5. Initiating and terminating cues are properly identified.________6. Task standards identified and verified by SME review.________7. Critical steps meet the criteria for critical steps and are identified with anasterisk (*).________8. Verify the procedure referenced by this JPM matches the most currentrevision of that procedure:
Procedure Rev. _____ Date _____________________9. Pilot test the JPM:a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.________10. If the JPM cannot be performed as written with proper responses, then revisethe JPM.________11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/InstructorDate SME/InstructorDate SME/InstructorDate CLINTON POWER STATIONSYSTEM JPMJPM NUMBER: 997777.0301 REVISION: 00Page 3 of 8Revision Record (Summary)
- 1. Revision 00,This is a new JPM CLINTON POWER STATIONSYSTEM JPMJPM NUMBER: 997777.0301 REVISION: 00Page 4 of 8Operator's Name: SSN:
Job Title: NLO RO SRO STA SRO CertJPM Title/Number: 997777.0301, Determine an emergency dose for a job and select a worker toperform the jobRevision Number: 00 Task Number and Title: 997777.03, Complete Emergency Plan Activities performed by an SROSuggested Testing Environment:Any Actual Testing Environment: Simulator Plant Control RoomTesting Method:SimulateFaulted:NoPerform Alternate Path:NoTime Critical:NoEstimated Time to Complete: 6 _minutesActual Time Used:
minutes
References:
EVALUATION
SUMMARY
- Were all the Critical Elements performed satisfactorily?YesNoThe operator's performance was evaluated against the standards contained in this JPM, and has beendetermined to be:SatisfactoryUnsatisfactoryComments:
Evaluator's Name: __________________________Evaluator's Signature: Date:
CLINTON POWER STATIONSYSTEM JPMJPM NUMBER: 997777.0301 REVISION: 00Page 5 of 8READ TO THE OPERATORI will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complet ethe task successfully, the objective of this Job Performance Measure will be satisfied.SIMULATOR SET-UP CONDITIONS
- NoneTASK STANDARDS
- The dose is determined to be 30 Rem and Ted Knight is selected to perform the jobTOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS
- NonePROCEDURAL/REFERENCES
- EP-AA-113r4 Personnel Protective ActionsEVALUATOR INSTRUCTIONS
- Amplifying cues are provided within the JPM steps.Supply the operator the partially filled out EP-AA-113 Attachment 2's for the volunteers.INITIAL CONDITIONS AND INITIATING CUE
- An emergency life saving operation must be performed. The operation will take 10 minutes in a 180 Rem/hr field.Three personnel have volunteered for the operation: Alvin Jones age 35, Bob Smith age 35 and Ted Knight age 45.
One person is needed for the operation. What will the dose for the operation be? Which volunteer would be at the least risk of health effects?START TIME:
CLINTON POWER STATIONSYSTEM JPMJPM NUMBER: 997777.0301 REVISION: 00Page 6 of 8
==========================================================================PERFORMANCE INFORMATIONCritical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meetthe standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
==========================================================================PERFORMANCE STEPS*1.Determines total dose for the operationStandardDose is 30 Rem CUECommentsSAT UNSAT Comment Number*2.Determines volunteer at least risk of health effectsStandardVolunteer is Ted Knight CUECommentsSAT UNSAT Comment NumberSTOP TIME:_____________
CLINTON POWER STATIONSYSTEM JPMJPM NUMBER: 997777.0301 REVISION: 00Page 7 of 8TERMINATING CUES:Total dose and volunteer are determined.K/A REFERENCE NUMBERS Importance RatingK/A SYSTEM NUMBERK/A NUMBER RO SRO 2.3.42.53.1 CLINTON POWER STATIONSYSTEM JPMJPM NUMBER: 997777.0301 REVISION: 00Page 8 of 8INITIATING CUEAn emergency life saving operation must be performed. The operation will take 10 minutes in a 180 Rem/hr field. Threepersonnel have volunteered for the operation: Alvin Jones age 35, Bob Smith age 35 and Ted Knight age 45. One person is needed for the operation. What will the dose for the operation be? Which volunteer would be at the least risk of health effects?