Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY System: Conduct of Operations JTA Task #: (New) Task Title: Determine Pressuriz er Heater Op erability KSA Ref: 2.1.3 3 PEO: RO: 3.4 SRO: 4.0 Operator's Name: Performance Environment:
C L A S S R O O M CONT ROL ROOM S I M U L A T O R Performance Method:
PERFORM E D SIMULATED D I S C U S SE D Time to co mplete JP M: Estim a t e d 1 5 m i n u t e s A c t u a l The operator's perform a nce was evalua ted against the standards contained in this JPM and was determ ined to be: SATISF ACTORY UNS ATISF ACTORY Reason, if unsatisfactory:
Evaluato r's Signatur e: Date: Comm e n t s (l i s t a l l step s not satisfact orily com p leted):
References:
IPO-001A "Plant Heatup from Cold Shutdo w n t o Hot Standby" Tools, Equipm ent, Job Aids, etc:
Selected param e ters from the plant, captured on Attachm e nt 1 of this JPM, and a calculator.
Page 1 of 5 Rev Date: 1/19/05 Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Saf e ty Considera tions: If this JPM is to be perform e d in the plant/c ontrol room , the candidate is NOT to m a nipulate any plant com ponents unless he/she has perm ission from the Shift/Unit Supervisor.
Hum a n Perform ance Measures
- During this Job Performance Measure, MONITOR for de monstrations of the following as outlin ed in Operations departm e nt guidance
- Peer check ing Three-way comm unications Phonetic alphabet Self checkin g ALM use Unit designators Conservative decision making Procedure p l ace keep ing Procedure rules of usage Comm e n t s: Instru c t i o n s: You m a y us e any approved reference m a terials, incl uding logs. Make or sim u late all written/oral reports as if the evolution is ac tually being perform e d. You a r e expected to discuss all steps you would take, including id entifying wh at switches/i ndications you would use Initiating Cue:
The plant is ready to enter Mode 3. The Unit Supervisor has directed you to determ ine the operability of the Pressurizer Heaters by perfor m i ng step 5.3.1 of IPO-001A, "Plant Heatup from Cold Shutdown to Hot Standby". Plant data is provided.
Term inating Conditions:
Calculations are com p lete and an Oper ability determ ination has been m a de. Page 2 of 5 Rev Date: 1/19/05 Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY STEP# *Critical ELEMENT STANDARD NOTES SAT/ UNS AT 1 Provide the candidate with the initiating cu e, the plant data sheet, and a copy of IPO-001A step 5.3.1.
Note Start time.
2 C a n d i d a t e correctly t r a n s f e r s data to the procedure.
See Attached Key 3 C a n d i d a t e perform s calcu lations. See Attached Key
- 4 C a n d i d a t e determ i n e s operability TASK COM PLETE. B/U Heater Groups A, B and Control Heater Group C are OPER ABL E. B/U Heater Group D is INOPER AB LE Note Completion time.
Page 3 of 5 Rev Date: 1/19/05 Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY INITIATING CUE:
The plant is ready to enter Mode 3. The Unit Superv isor has directed you to dete rm ine the ope rab ility of the Pressurizer Heaters by perform i ng step 5.3.1 of IPO-001A, "Plant Heatup from Cold Shutdown to Hot Standby". Plant data is provided.
Plant Data Param e ter Value f r om Last Readin g Sheets (OPT-XXX) Current Value 1/1-PCPR1 Am ps 580 580 1/1-PCPR Amps 0 200 1/1-PCPR2 Am ps 565 565 1/1P-CPR3 Am ps 0 176 1B1 Volts 474 468 1B2 Volts 483 476 1B3 Volts 476 470 1B4 Volts 485 480 PC point V6303A 487.2 486.9 PC point V6302A 488.1 487.1 PC point V6301A 487.2 486.9 PC point V6304A 488.3 487.1 PC point A6801A 571.2 570.1 PC point A6802A 0 193 PC point A6803A 559.8 560 PC point A6804A 0 176 1EA1 Amps 282.7 261.4 1EA2 Amps 358.5 423.7 NOTE: The candidate can use either the MCB mete r am perages or the plant com puter values for heater am pe rages. The IPO allows both and there is no significant difference.
NOTE: The shaded param e ters should NOT be use
- d. The following problem s exist with the shaded data: 1. The pressurizer heaters are supplied by 1EB1-4, NOT 1B1-4
- 2. 1EA1/2 am perage is not necessary to com p lete the calcu lation s. 3. Data from the last set of logs should NOT be used for the Operability determ ination. Plant conditions could have changed significantly si nce the readings were taken. The IPO wants curren t plan t data to d e te rm ine Operability.
Page 4 of 5 Rev Date: 1/19/05 Initial License Exam 03/2005 Job Performance Measure JPM: SRO/RO A1.a KEY Page 5 of 5 Rev Date: 1/19/05 Circle the correct status for each Bank of Pressurizer Heaters Heater Bank Status Status B/U Heater Grp. A Operable Inoperable B/U Heater Grp. B Operable Inoperable Control Grp. C Operable Inoperable B/U Heater Grp. D Operable Inoperable Example of the completed procedure:
5.3 Heatup
And Pressurization For MODE 3 Entry
[C] This section describes steps for heatup and pressurization to enter MODE 3. 5.3.1 Verify at least two groups of pressurizer heaters have a capacity of at least 150KW each.(TS SR 3.4.9.2) A. Energize each group of heaters, as required, to measure current. _____
B. Record voltage and current AND calculate power for each group of heaters. (Voltage x current x 0.001732 = power)
Backup Heater Group A 1EB3 1-II-PCPR1or Or 486.9__x or _570.1 _
x 0.001732 =
480.77 KW _____
V6303A A6801A Backup Heater Group B 1EB2- 1-II-PCPR2 or 487.1 x or _193 _
x 0.001732 =
162.8 KW _____
V6302A A6803A ! Control Heater Group C 1EB1 1-II-PCPR or 486.9 x or __560 x 0.001732 =
_472.54_ KW _____
V6301A A6803A ! Backup Heater Group D 1EB4 1-II-PCPR3 or 487.1 x or _176 x 0.001732 =
__148.5__ KW _____
V6304A A6804A C. Operate pressurizer heaters as needed for plant conditions. _____
D. IF any group(s) of pressurizer heaters does NOT have a capacity of > 150KW, THEN initiate a LCOAR per ODA-308. _____
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 1 of 5 Rev Date: 1/24/05 System: Conduct of Operations JTA Task #: (New) Task Title: Calculate RCS Leakrate KSA Ref: 2.1.23 PEO: RO: 3.9 SRO: 4.0 Operator's Name:
Performance Environment:
CLASSROOM CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operator's performance was evalua ted against the standards contained in this JPM and was determined to be: SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator's Signature:
Date: Comments (list all steps not satisfactorily completed):
References:
ABN-103 "Excessive Reactor Coolant Leakage" Tools, Equipment, Job Aids, etc:
Selected parameters from the plant, captured on Attachment 1 of this JPM, and a calculator.
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 2 of 5 Rev Date: 1/24/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor. Human Performance Measures:
During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:
Peer checking Three-way communications Phonetic alphabet Self checking ALM use Unit designators Conservative decision making Procedure place keeping Procedure rules of usage Comments:
Instructions:
You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/i ndications you would use Initiating Cue:
The plant is operating at 100% power , BOL. The crew is responding to the indications of a Reactor Coolant System leak. The Unit Supervisor has directed you to determine the size of the leak by performing Attachment 1 of ABN-103, "Excessive Reactor Coolant Leakage". Plant data is provided. Terminating Conditions:
Calculations are complete and a RCS Leak Rate determination has been made.
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 3 of 5 Rev Date: 1/24/05 STEP# *Critical ELEMENT STANDARD NOTES SAT/ UNSAT 1 Provide the candidate with the initiating cue, the plant data sheet, and a copy of ABN-103 Attachment 1.
Note Start time.
2 Candidate correctly transfers data to the procedure.
See Attached Key 3 Candidate performs calculations.
See Attached Key
- 4 Candidate determines operability TASK COMPLETE. Leak rate is determined to be approx 5 gpm.
See key for allowed variances in parameters Note Completion time.
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 4 of 5 Rev Date: 1/24/05 INITIATING CUE:
Parameter Value at 1429 Value at 1446 CHG FLO (F6138A) 140.7 143.8 LTDN FLO (F6134A) 130.9 130.9 FR-157 (RCP 1 Leak Off) 2.8 2.8 FR-156 (RCP 1 Leak Off) 2.8 2.8 FR-155 (RCP 1 Leak Off) 2.8 2.8 FR-154 (RCP 1 Leak Off) 2.8 2.8 VCT LVL (L6112A) 52.8 50.4 T0400A (Loop 1 Tave) 589.8 589.8 T0420A (Loop 2 Tave) 588.6 588.6 T0440A (Loop 3 Tave) 589.7 589.7 T0460A (Loop 4 Tave) 588.7 588.7 L6480A (PZR Level 1) 60 59.5 L6481A (PZR Level 2) 60 59.5 L6482A (PZR Level 3) 60 59.5 NOTE: There was no VCT auto make-up. There we re no diversions of letdown flow during this period.
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 5 of 5 Rev Date: 1/24/05 Attachment 1 CPSES ABNORMAL CONDITIONS PROCEDURES MANUAL UNIT 1 AND 2 PROCEDURE NO.
ABN-103 EXCESSIVE REACTOR COOLANT LEAKAGE REVISION NO 8 PAGE 22 OF 28 ATTACHMENT 1 PAGE 2 OF 2 PARAMETER INITIAL VALUE FINAL VALUE AVERAGE VALUE TIME (-) __1429____ + __1446____ = ____17___ t
- CHRG FLO (F6138A) __140.7____ + ___143.8___
(__________284.5____________) 2 = __142.25___ GPM
- LTDN HX OUT FLOW (F6134A) ___130.9__ + ___130.9___
(__________261.8______________) 2 = __130.9__ GPM
- RCP SEAL LKOFF FLO (FR-157, 156, 155
& 154) ___11.2______ + ____11.2____
(___________5.6______________
.) 2 = ___11.2___ GPM
- VCT LVL (L6112A) (_52.8___ - __50.4___)(19.4gal/%)
(_________46.56__________________) (__17____)t in MIN)
= __2.74___ GPM RC LOOP 1-4 TAVE (T0400A,T0420A,T0440A OR T0460A)
(________ - ________)(93gal/°F)
(_____________0__________________) (_____17_____)t in MIN)
= ____0___ GPM PRZR LVL (L6480A,L6481A OR L6482A) (_60___ - ___59.5__)(65gal/%)
(_________32.5___________________) (__17_____)t in MIN)
= ___1.9___ GPM Shaded areas NOT REQUIRED CALCULATION FORMULA Flow adjust method: (+) ________
CHRG FLO -________
LTDN FLOW -________
SEAL LKOFF FLO -( )_________
TAVG ADJUST
+( )________
PRZR LVL ADJUST = ______GPM RCS LEAKAGE OR VCT level adjust method ( )__2.74___ VCT LVL ADJUST Allowed (2.5-3.0)
-( )_0___ TAVG ADJUST +(+ )__1.9__
PRZR LVL ADJUST Allowed (1.6 -
2.2) = __4.65_GPM RCS LEAKAGE Allowed (4.1
- 5.2)
- Either Chrg Flo, Ltdn Flow, and RCP Seal Lkoff Flo (Flow adjust method) OR VCT Lvl (VCT level adjust method) should be used, but NOT both.
Initial License Exam 03/2005 Job Performance Measure JPM: RO A1.b KEY Page 6 of 5 Rev Date: 1/24/05
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 1 of 13 Rev Date: 1/25/05 System: Equipment Control JTA Task #: (New) Task Title: Check Completed Surveillance Procedure for Accuracy KSA Ref: 2.2.12 PEO: RO: 3.0 SRO: 3.4 Operator's Name:
Performance Environment:
CLASSROOM CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM: Estimated 15 minutes Actual The operator's performance was evalua ted against the standards contained in this JPM and was determined to be: SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator's Signature:
Date: Comments (list all steps not satisfactorily completed):
References:
OPT-207A "Service Water System" Tools, Equipment, Job Aids, etc:
Selected parameters from the plant, captured on Attachment 1 of this JPM..
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 2 of 13 Rev Date: 1/25/05 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor. Human Performance Measures:
During this Job Performance Measure, MONITOR for demonstrations of the following as outlined in Operations department guidance:
Peer checking Three-way communications Phonetic alphabet Self checking ALM use Unit designators Conservative decision making Procedure place keeping Procedure rules of usage Comments:
Instructions:
You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/i ndications you would use Initiating Cue:
The plant is operating at 100% power , BOL. You are the CPC RO. Th e Unit Supervisor has directed you to review the just completed OPT-207 A, Service Water System, for accuracy. Circle any mistakes in the OPT and return the marked up copy to the Lead Examiner. Terminating Conditions:
The OPT has been reviewed and 2 of the three errors have been correctly identified.
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 3 of 13 Rev Date: 1/25/05 STEP# *Critical ELEMENT STANDARD NOTES SAT/ UNSAT 1 Provide the candidate with the initiating cue.
Note Start time.
2 Candidate reviews completed data sheet.
See Attached Key
- 3 Candidate determines the errors in the completed OPT.
TASK COMPLETE. Two of the three errors are identified. See Attached Key for the three errors.
Note Completion time.
NOTE: The
vibration alert error should be noted in 4 places.
It is critical that the ODA -308
Tracking LOCAR be noted. The others are less important.
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 4 of 13 Rev Date: 1/25/05 INITIATING CUE:
The plant is operating at 100% power , BOL. You are the CPC RO. Th e Unit Supervisor has directed you to review the just completed OPT-207A, Service Water System, for accuracy. Circle any mistakes in the OPT and return the marked up copy to the Lead Examiner.
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 5 of 13 Rev Date: 1/25/05 Attachment 1. Completed OPT.
NOTE TO EXAMINER: Ensure candida te is provided the filled out OPT. This must be done manually.
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 6 of 13 Rev Date: 1/25/05 ROUTINE TEST-SURVEILLANCE page 1 WORK ORDER Resp. Group: POSS OPS SHIFT MANAGER WO # : 5-05-505395-AA Tag #: CP1-SWAPSW-01 Unit: 1 Train (Sys) : A See Equipment List System: SW Train (Elect) : NA More Tags and Locations Bldg/Elev : SI 0796 Room: X-275 Tag Desc: STATION SERVICE WATER PUMP 1-01 Comp't Quality: Y Safety Class: 3 SEIS CAT: I MOV XI: N PVO: A EQ: M ***************************************** SURVEILLANCE
SUMMARY
- DESC: OPT-207A, TRN A STATION SERVICE WATER PMP/VLV OPERBILITY TEST Compliance Date/Time : 03/21/2005 10:05 Source Doc't : IST Violation Date/Time : 04/05/2005 10:05 Test Section : 8.2 Adj Schedule Date/Time : __/__/____ Test Procedure: OPT-207A Work Week Test Type : FI Frequency : 92 Days Last Performed Date/Time : 01/09/2005 10:005 Last Perf. WO : 5-04-505395-AE
- SPECIAL INSTRUCTI ONS**********************
- Permit-RWP : N #: ____________________ Confined Space : N #: ____________________ Fire Permit : N #: ____________________ Combust. Loading : N #: ____________________ Fire Impair : N #: ____________________ Cleanliness Class: C Housekeeping Zone: IV Clearance/MTD : N #: ____________________ STA-720 Req'd : No Barrier Impair Form: No Postwork Testing Reqt: N Ventilation Pressure Boundary Breach: No
- APPROVAL/AUTHORIZATION TO START*************************************** Ops-Shift Manager Technical : _____________________________ Date: __/__/____ Radiation Protection : _____________________________ Date: __/__/____ Shift Manager : _____________________________ Date: __/__/____ Ops-Shift Manager Safety : _____________________________ Date: __/__/____ Revisions 1 2 3 4 5 6 ------------------------------------------------------------------------------------- POSS ______ ______ ______ ______ ______ ______ QC ______ ______ ______ ______ ______ ______ ANII ______ ______ ______ ______ ______ ______ RP ______ ______ ______ ______ ______ ______ Ops SM ______ ______ ______ ______ ______ ______ ********************************************INITIAL SURVEILLANCE RESULTS********************************************** As Found Condition: _____ Unsat (Sign&Date) ____________________________ Date: __/__/____ Shift Manage Informed (Sign&Date) _________________________________ Date: __/__/____ ***************************************FINAL SURVEILLANCE RESULTS*************************************************** Duration (Est/Act) 7 / ___ Start Time ____ Date: __/__/____ Test Completed: ___ Sat ___ Unsat Tech Spec Acceptance Checked: ___ Sat ___ Unsat Test Completed by: ________________________________________ Time: ____ Date: __/__/____ ************************************SURVEILLANCE ACCEPTANCE******************************************************* Tech Spec Acceptance Criteria Met: ___ Sat ___ Unsat Shift Manager: ________________________________________ Date: __/__/____ Time: ____ ************************************** SURVEILLANCE REVIEWS******************************************************** Ops-Shift Manager : _____________________________ Date: __/__/____ Ops-Shift Manager : _____________________________ Date: __/__/____ Ops-Shift Manager : _____________________________ Date: __/__/____ Ops-Shift Manager : _____________________________ Date: __/__/____ *******************************************************************************************************************************
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 7 of 13 Rev Date: 1/25/05 ROUTINE TEST-SURVEILLANCE page 2 WORK ORDER Tag # CP1-SWAPSW-01 WO # : 5-04-505395-AA ********************************************** WORK PLAN ****************************************************************
MANPOWER ESTIMATES MEASURING AND TEST EQUIPMENT (enter actual manhours)
Discipline MANHOURS CAL DUE CAL DUE Code Est/Act M&TE TAG# DATE M&TE TAG# DATE IWCM 0/ ___ ___________ __/__/__ ___________ __/__/__ POS 0/ ___ ___________ __/__/__ ___________ __/__/__ POSS 0/
_1_ ___________ __/__/__ ___________ __/__/__ ______ ___ / ___ ___________ __/__/__ ___________ __/__/__ ______ ___ / ___ ___________ __/__/__ ___________ __/__/__ ______ ___ / ___ ___________ __/__/__ ___________ __/__/__ ______ ___ / ___ ___________ __/__/__ ___________ __/__/__ ______ ___ / ___ ___________ __/__/__ ___________ __/__/__ ______ ___ / ___ ___________ __/__/__ ___________ __/__/__
- SPECIAL PARTS AND SPECIAL TOOLS *******************************************
Enter actual quantity used and unique identifier such as Serial #, Heat # RR#, RIR #, QAT # etc. if applicable Unique ID ISSUE/ Qnty UI Qnty It ID) (SN, RR, RIR, STAGED PMMS Reqd Used (TSN) QAT, HT# etc) Description Flag STATUS ----- ---- ----- ------- ---------------- --------------------------- ---- ----------
N/A ___ ___ ____ ___________ __________________ ___ ______
N/A ___ ___ ____ ___________ __________________ ___ ______
N/A ___ ___ ____ ___________ __________________ ___ ______
N/A ___ ___ ____ ___________ __________________ ___ ______
N/A ___ ___ ____ ___________ __________________ ___ ______
N/A ___ ___ ____ ___________ __________________ ___ ______
N/A ___ ___ ____ ___________ __________________ ___ ______
N/A ___ ___ ____ ___________ __________________ ___ ______
N/A ___ ___ ____ ___________ __________________ ___ ______
N/A ___ ___ ____ ___________ __________________ ___ ______
N/A ___ ___ ____ ___________ __________________ ___ ______
N/A ___ ___ ____ ___________ __________________ ___ ______
Initial License Exam 03/2005 Job Performance Measure JPM: RO A2 Page 8 of 13 Rev Date: 1/25/05 ROUTINE TEST-SURVEILLANCE pa ge 3 WORK ORDER Tag # CP1-SWAPSW-01 WO # : 5-05-505395-AA ************************************RELATED EQUIPMENT / VERIFICATION LIST***********************************
+ Stop + Locate + Touch +Verify + Anticipate + Manipulate + Observe +
Verify the Equipment Tags being worked / tested relate to the work order. Verify W.O. tags using the following related equipment / verification list.