January 3, 2007
Randall K. Edington, Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321
SUBJECT: COOPER NUCLEAR STATION - NRC PHYSICAL SECURITY INSPECTIONREPORT 05000298/2006007
Dear Mr. Edington:
On December 14, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection at your Cooper Nuclear Station facility. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results which were discussed on December 14, 2006, with Mr. S. Minahan, General Manager, Plant Operations, and other members of your staff.This inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.No findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
Nebraska Public Power District-2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC's document system ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information - Withhold under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,/RA/Michael P. Shannon, ChiefPlant Support Branch Division of Reactor SafetyDocket No.: 50-298License No.: DRP- 46Nonpublic
Enclosure:
Inspection Report 05000298/2006007
w/attachment:
Supplemental Information cc w/enclosure:Gene Mace Nuclear Asset Manager Nebraska Public Power District P.O. Box 98 Brownville, NE 68321John C. McClure, Vice President and General Counsel Nebraska Public Power District P.O. Box 499 Columbus, NE 68602-0499P. V. Fleming, Licensing ManagerNebraska Public Power District P.O. Box 98 Brownville, NE 68321 Nebraska Public Power District-3 Ronald D. Asche, President and Chief Executive Officer Nebraska Public Power District 1414 15th Street Columbus, NE 68601Jerry C. Roberts, Director of Nuclear Safety Assurance Nebraska Public Power District P.O. Box 98 Brownville, NE 68321H. Floyd Gilzow, State Liaison OfficerMissouri Department of Natural Resources Lewis and Clark State Office Building 1101 Riverside Drive Jefferson City, MO 65101