01/24/2007 - Summary of Public Meeting with Beaver Valley, Davis-Besse, and Perry Nuclear Power Plants to Discuss FENOC Fleet Performance
ML070310147
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 01/29/2007
From: Duncan E R
NRC/RGN-III/DRP/RPB6
To:
References
Download: ML070310147 (5)


Text

January 29, 2007LICENSEE:FirstEnergy Nuclear Operating CompanyFACILITIES:Beaver Valley, Davis-Besse, and Perry Nuclear Power Plants

SUBJECT:

SUMMARY

OF THE JANUARY 24, 2007, PUBLIC MEETING TO DISCUSSFENOC FLEET PERFORMANCEOn January 24, 2007, the Nuclear Regulatory Commission (NRC) held a public meeting at theFour Points By Sheraton Akron West, Fairview, Ohio. The meeting was between NRC Regions I and III, and FirstEnergy Nuclear Operating Company (FENOC) management todiscuss fleet performance. The meeting notice and licensee presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML063390281 and ML070260353, respectively. A list of principal NRC and licensee meeting participants can befound in the attached Enclosure.The NRC began the meeting with a brief introduction, then FENOC management discussedindividual plant performance, their fleet-wide approach to sustaining performanceimprovements, and improving site performance at the Beaver Valley, Davis-Besse, and Perry Nuclear Power Plants. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and FENOC representatives./RA/Eric R. Duncan, ChiefBranch 6 Division of Reactor ProjectsDocket Nos.50-334, 50-412, 50-346, and 50-440 License Nos.DPR-66, NPF-73, NPF-3, NPF-58

Enclosure:

As Stated DISTRIBUTION:See next page LICENSEE:FirstEnergy Nuclear Operating CompanyFACILITIES:Beaver Valley, Davis-Besse, and Perry Nuclear Power Plants

SUBJECT:

SUMMARY

OF THE JANUARY 24, 2007, PUBLIC MEETING TO DISCUSSFENOC FLEET PERFORMANCEOn January 24, 2007, the Nuclear Regulatory Commission (NRC) held a public meeting at theFour Points By Sheraton Akron West, Fairview, Ohio. The meeting was between NRC Regions I and III, and FirstEnergy Nuclear Operating Company (FENOC) management todiscuss fleet performance. The meeting notice and licensee presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML063390281 and ML07070260353, respectively. A list of principal NRC and licensee meeting participants can befound in the attached Enclosure.The NRC began the meeting with a brief introduction, then FENOC management discussedindividual plant performance, their fleet-wide approach to sustaining performanceimprovements, and improving site performance at the Beaver Valley, Davis-Besse, and Perry Nuclear Power Plants. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and FENOC representatives.Eric R. Duncan, ChiefBranch 6 Division of Reactor ProjectsDocket Nos.50-334, 50-412, 50-346, and 50-440 License Nos.DPR-66, NPF-73, NPF-3, NPF-58

Enclosure:

As Stated See Attached DistributionDOCUMENT NAME:C:\FileNet\ML070310147.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIINAMERRuiz:slsEDuncanDATE01/29/0701/29/07OFFICIAL RECORD COPY FirstEnergy Nuclear Operating Companycc w/encl:G. Leidich, President and Chief Nuclear Officer - FENOCJ. Hagan, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight R. Anderson, Vice President, Nuclear Support Director, Fleet Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health FirstEnergy Nuclear Operating CompanyADAMS Distribution

DXC1 TEB TJW2 RidsNrrDirsIrib GEG KGO GLS MEF1 CAA1 DRPIII DRSIII PLB1 TXN EnclosurePrincipal Meeting Participants NRCJ. Caldwell, Regional Administrator, RIIIM. Dapas, Deputy Regional Administrator, RI T. McGinty, Deputy Director, Division of Operating Reactor Licensing, NRR E. Duncan, Chief, Projects Branch 6, RIII R. Bellamy, Chief, Projects Branch 7, RIFirstEnergy Nuclear Operating CompanyG. Leidich, President and Chief Nuclear OfficerJ. Hagan, Senior Vice President - Operations and Chief Operating Officer J. Rinckel, Vice President - Oversight J. Lash, Site Vice President - Beaver Valley M. Bezilla, Site Vice President - Davis-Besse B. Pearce, Site Vice President - Perry