Intro February 5-6, 2007, Program for the Inspection of Nickel Alloy Components (Pinc) 8th Meeting
ML070860321
Person / Time
Site: North Anna Dominion icon.png
Issue date: 02/05/2007
From: Moyer C E
NRC/RES/DFERR
To:
Shared Package
ML070860236 List:
References
Download: ML070860321 (6)


Text

United States Nuclear Regulatory Commission United States Nuclear Regulatory Commission Program for the Inspection of Nickel Alloy Components (PINC) 8 th Meeting February 5-6, 2007 Rockville, Maryland, USA Carol E. Moyer

, Materials Engineer US NRC O f fice of Nuclear Regulatory Research 301-415-6764 cem3@nrc.gov 5-6 February 2007PINC-8 2 Objectives for PINC Cooperative Research Project

  • D ocument the range of locations and crack morphologies associated with PWSCC and observed NDE responses
  • F abricate / obtain representative NDE mock-ups with flaws to simulate tight PWSCC cracks
  • I dentify and quantitatively assess NDE methods for accurately detecting, sizing and characterizing tight cracks such as PWSCC
  • I ncorporate findings from other ongoing PWSCC research programs, as appropriate 5-6 February 2007PINC-8 3 Project Organization
  • T ask 1 -M orphology Atlas (TG-Atlas)

-C ompile exis ting work on crack morphology of PWSCC

-C orrelate with NDE data, when available

-D evelop an electronic Atlas (database) of NDE and metallography information

-P erform new NDE, fractography, metallography

  • T ask 2 -N DE Technology Assessment (TG-NDE)

-R ound Robin of NDE techni ques on PWSCC and simulated cracks-A ssess techniques to de tect an d size cracks

-A ssess techniques to manufacture test blocks

-C onsider relevant materials, geometries

-I ntegrate findings for regul atory applic ation, process qualification 5-6 February 2007PINC-8 4 Status of Agreements

  • S igned Members

-SKI-J N E S-T ohoku University

-K ansai Electric Power Co. (Japanese PWR Industry)

-V TT / HUT (Finland)

-K INS / KAERI (Korea)

  • C ommitted Members (Agreements in Process)

-EPRI 5-6 February 2007PINC-8 5 Meeting Agenda: February 5 th Opening of meeting, introductions, logistics C. Moyer Welcome, opening comments J. Wiggins Review of minutes from PINC-7 meeting P. Merck Review of action items from PINC-7 meeting P. Merck/G. Schuster Lessons learned from Piping RRT in Japan I. Komura Break Proposed CRDM and BMI mockups G. Schuster Lunch Discussion -

RRT schedule development S. Doctor/P. Merck Data analysis group (DAG)

C. Moyer/S. Doctor Break Discussion -

p lans for subsequent RRTs Finland program update P. Kauppinen Adjourn for the day 5-6 February 2007PINC-8 6 Meeting Agenda: February 6th Resume meeting, introductions, logistics C. Moyer TG-Atlas update G. Schuster Break TG-NDE summary S. Doc t or Rev i ew of action items P. Merck/G. Schuster Lunch Steering Committee Meeting C. Moyer Discussion -

p rogram extension through 2008 Discussion -

D AG Discussion -

RRT schedule Schedule for future meetings Adjourn