IR 05000461-09-402; 01/20/2009 - 01/22/2009, Exelon Nuclear Corporate; 04/06/2009 - 04/10/2009; Clinton Power Station; Routine Security Baseline Inspection - Cover Letter
ML091350295
Person / Time
Site: Clinton Constellation icon.png
Issue date: 05/14/2009
From: Duncan E R
Plant Support Branch II
To: Pardee C G
Exelon Generation Co, Exelon Nuclear
References
IR-09-402
Download: ML091350295 (4)


Text

May 14, 2009

Mr. Charles Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT: CLINTON POWER STATION NRC SECURITY BASELINE INSPECTION REPORT 05000461/2009402(DRS)

Dear Mr. Pardee:

On April 10, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Clinton Power Station and Exelon Nuclear Corporate Office. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on April 10, 2009, with Mr. F. A. Kearney and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.Enclosure transmitted herewith contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,/RA/ Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-461 License Nos. NPF-62

Nonpublic

Enclosure:

Inspection Report 05000461/2009402(DRS)

w/Attachment:

Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO J. Klinger, State Liaison Officer, Illinois Emergency Management Agency C. Williamson, Clinton Site Security Manager cc w/o encl: Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Manager Regulatory Assurance - Clinton Power Station Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General Chairman, Illinois Commerce Commission