Dresden Nuclear Power Station, Units 2 and 3 - NRC Initial License Examination Report 05000237/2017301; 05000249/2017301 (Rkw)
ML17275A040
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/29/2017
From: Orlikowski R J
NRC/RGN-III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Shared Package
ML17068A430 List:
References
50-237/17-301, 50-249/17-301 50-237/OL-17, 50-249/OL-17
Download: ML17275A040 (10)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532

-4352 September 29, 2017 Mr. Bryan Senior VP, Exelon Generation Co., LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NRC INITIAL LICENSE EXAMINATION REPORT 05000 237/20 17 301; 05000 249/20 17 301

Dear Mr. Hanson:

On September 21, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for license applicants employed at your Dresden Nuclear Power Station. The enclosed report documents the results of those examination s. Preliminary observations noted during the examination process were discussed on August 29, 2017, with yourself and other members of your staff

. An exit meeting was conducted by telephone on September 12, 2017 , with D. Thomas , Dresden Training Manager and Mr. R. K. Walton, Chief Operator Licensing Examiner, to review the proposed final grading of the written examination for the license applicants.

The NRC examiners administered an initial license examination operating test during the week of August 21 and 28, 2017. The written examination was administered by Dresden Nuclear Power S tation training department personnel on August 31, 2017. Eight Senior Reactor Operator applicants were administered license examinations. The results of the examinations were finalized on September 14, 2017. All eight applicants passed all sections of their respective examinations

eight applicant s were issued senior operator license s. The administered written examination and operating test, as well as documents related to the development and review (outlines, review comments and resolution, etc.) of the examination will be withheld from public disclosure until Augu st 21, 2019. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading

-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Sincerely,/RA/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safe ty Docket Nos. 50

-237; 50-249 License Nos. DPR

-19; DPR-25 Enclosure s: 1. OL Examination Report 05000 237/20 17 301; 05000 249/20 17 301 2. Simulation Facility Fidelity Report cc: Distribution via LISTSERV D. Thomas, III, Training Manager, Dresden Nuclear Power Station Letter to Bryan Hanson from Robert Orlikowski dated September 29, 2017

SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NRC INITIAL LICENSE EXAMINATION REPORT 05000 237/20 17301; 05000 249/20 17 301 DISTRIBUTION

Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson James Trapp Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado

Colleen Schmidt

ADAMS Accession Number: ML17275A040 OFFICE RIII RIII RIII NAME RKWalton:jw ROrlikowski DATE 09/28/17 09/29/17 OFFICIAL RECORD COPY

Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket No s: 50-237; 50-249 License N o s: DPR-19; DPR-25 Report No s: 05000 237/20 17 301; 05000 249/20 17 301 Licensee: Exelon Generation Company, LLC Facilit y: Dresden Nuclear Power Station Location: Morris , Illinois Dates: July 24 through August 31, 2017 Examiners: R. K. Walton , Senior Operations Engineer

- Chief Examiner C. Zoia , Senior Operations Engineer

-- Examiner J. Seymour, Reactor Operations Engineer

- Examiner Approved by:

R. Orlikowski, Chief Operations Branch Division of Reactor Safety 2

SUMMARY

Inspection Report 05000237/2017301, 05000249/2017301; 07/24/2017

- 08/31/2017

Dresden Nuclear Power Station, Units 2 and 3; Initial License Examination Report.

The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG

-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 1 1. Examination Summary Eight of eight applicants passed all sections of their respective examinations. Eight applicant s were issued senior operator licenses. (Section 4OA5.1).

3

REPORT DETAILS

4OA5 Other Activities

.1 Initial Licensing Examinations

a. Examination Scope

The U.S. Nuclear Regulatory Commission (NRC)examiners and members of the facility licensee's staff used the guidance prescribed in NUREG

-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 1 1, to develop, validate, administer, and grade the written examination and operating test. The written examination outlines were prepared by the NRC staff and were transmitted to the facility licensee's staff.

Members of the facility licensee's staff prepared the operating test outlines and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of Ju l y 24, 2017, with the assistance of members of the facility licensee's staff. During the on

-site validation week, the examiners audited all license application s for accuracy. The NRC examiners, with the assistance of members of the facility licensee's staff, administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of August 21 to August 29 , 2017. The facility licensee administered the written examination on August 31, 2017.

b. Findings

(1) Written Examination The NRC examiners determined that the written examination, as proposed by the licensee, was within the range of acceptability expected for a proposed examination.

Less than 20% of the proposed examination questions were determined to be unsatisfactory and required modification or replacement.

All changes made to the proposed written examination, were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," and documented on Form ES 9, "Written Examination Review Worksheet

." On September 5, 2017 , the licensee submitted documentation noting that there were no post-examination comment s for consideration by the NRC examiners when grading the written examination

. The written examination outlines and worksheets, the proposed written examination, as well as the final as

-administered examination and answer key (ADAMS Accession Number ML17068A43 2), will be available

, in 24 months

, electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Document Access and Management System (ADAMS). The NRC examiners graded the written examination on Septemb er 6, 2017, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.

4

(2) Operating Test The NRC examiners determined that the operating test, as originally proposed by the licensee, was within the range of acceptability expected for a proposed examination. Following the review and validation of the operating test, minor modifications were made to several Job Performance Measures (JPMs), and some minor modifications were made to the dynamic simulator scenarios. Changes made to the operating test

, documented on Form ES 7, "Operating Test Review Worksheet" as well as the final

, as-administered

, dynamic simulator scenarios and JPMs, will be available, in 24 months, electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's ADAMS. The NRC examiners completed operating test grading on September 14, 2017.

(3) Examination Results Eight applicants at the senior reactor operator level were administered written examinations and operating tests.

All eight applicants passed all portions of their examinations and were issued their respective operating licenses on September 21, 2017.

.2 Examination Security

a. Scope

The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title 10 of the Code of Federal Regulations, Section 55.49, "Integrity of Examinations and Tests

." The examiners used the guidelines provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors

," to determine acceptability of the licensee

's examination security activities.

b. Findings

None

4OA6 Management Meetings

.1 Debrief The chief examiner presented the examination team's preliminary observations and findings on August 29, 2017 , to J. Washko , Plant Manager

, and other members of the Dresden Nuclear Power S tation staff.

.2 Exit Meeting

The chief examiner conducted an exit meeting on September 12, 2017, with Mr. D. Thomas III , Training Manager

, by telephone

. The examiners asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or debrief/exit meetings.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

SUPPLEMENTAL INFORMATION KEY POINTS OF CONTAC

T Licensee

J. Washko, Station Plant Manager
R. Bauman, Shift Operations Superintendent
B. Franzen, Regulatory Assurance Manager
F. Gogliotti, Director, Site Engineering
P. Hansett, Operations Director
J. Quinn, Director, Site Maintenance
B. Sampson, Organizational Effectiveness Manager
D. Thomas, Director, Site Training
J. Nelson, Operations Training Manager
B. Pigg, Shift Manager

-Initial License Trainer

U.S Nuclear Regulatory

Commission

R. K. Walton, Chief Examiner
G. Roach, Senior Resident Inspector

ITEMS OPENED, CLOSED, AND DISCUSSED

Opened, Closed, and Discussed None LIST OF ACRONYMS USE

D ADAMS Agencywide Document Access and Management System

JPM Job Performance Measures

NRC U.S. Nuclear Regulatory Commission

SIMULATION FACILITY FIDELITY REPORT

Facility Licensee:

Dresden Nuclear Power

S tation Facility Docket No: 50-237; 50-249 Operating Tests Administered:

August 21 through 29, 2017 The following documents observations made by the U.S. Nuclear Regulatory

Commission (NRC) examination team during the initial operator license examination. These observations do

not constitute audit or inspection findings and are not, without further verification and review, indicative of non

-compliance with Title 10 of the Code of Federal Regulations

55.45(b). These observations do not affect NRC certification or approval of th

e simulation facility other than to provide information which may be, used in future evaluations.

No licensee action is required in response to these observations.

During the conduct of the simulator portion of the operating tests, the following items wer

e observed: ITEM DESCRIPTION

2-8540-2/4; Drywell Pressure Indicator

During Scenario 2, the Drywell Pressure Indicator did not respond to lowering drywell pressure. After initiating drywell sprays with drywell pressure about 9 psig, about 3 minutes later, the indicator dropped from 9 psig to 3 psig. The licensee replaced a degraded cable which repaired the sluggish indicator.