Calendar Year 2017 Baseline Inspection Completion
ML18057B084
Person / Time
Issue date: 02/26/2018
From: Pruett T W
NRC/RGN-IV/DRP
To: Christopher Miller
Division of Inspection and Regional Support
Ruesch E A
References
Download: ML18057B084 (27)


Text

February 26, 2018 MEMORANDUM TO: Christopher G. Miller, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM: Troy W. Pruett, Director /RA/ Division of Reactor Projects Region IV

SUBJECT:

CALENDAR YEAR 201 7 BASELINE INSPECTION COMPLETION This memorandum documents Region IV's completion of the Reactor Oversight Process (ROP) Baseline Inspection Program for calendar year (CY) 201 7 in accordance with Inspection Manual Chapter (IMC) 2515.

Region IV completed the baseline inspection program at all regional reactor licensees subject to the ROP. Reactor Program System (RPS) Report 8a is enclosed. With one exception, the report documents completion of all required samples for the 2017 inspection cycle. The biennial problem identification and resolution sample at Grand Gulf was begun during 2016

-2017 biennial inspection cycle, but was not completed until January 18, 2018. It is therefore documented as incomplete on the enclosed report. However, because it was completed in the first quarter of 2018, and was the only sample not completed in 2017, it meets the IMC 2515 criteria for regional completion of the ROP. Note that along with the status, some procedures have attached notes as described in IMC 0306. In some cases, procedures are performed on a biennial or triennial frequency and were not required to be performed in CY2017. Also, in some cases, procedures were considered complete with less than the minimum samples because sufficient samples were not available. In other cases, all requirements of the procedure were met by work done in another procedure. Lastly, in some cases, procedures are marked as not applicable if they were not required to be performed this inspection cycle.

CONTACT: Eric A. Ruesch , RIV/DRS 817-200-1 126 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011

-4511 C. Miller 2 Reactor Program System Report 8a does not include security and safeguards inspection program status. However, the baseline program for security and safeguards for all Region IV sites was also verified complete for CY2017.

Enclosure:

Reactor Program System Report 8a

Region No: 4

Arkansas Nuclear One (ANO)

Inspection Cycle: 2017

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 4

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment

Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual

Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly

Quarterly 21 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 1

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 4

2 Complete Complete 71111.08P Inservice Inspection Activities - PWR

Biennial 2

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual

Annually 2

1 Complete Complete 71111.11B Licensed Op Requal & Perform - Biennial

Biennial 2

1 Complete Complete - in previous year(s)

71111.11Q Licensed Op Requal & Perform - Quarterly

Quarterly 17 8

Complete Complete 71111.12 Maintenance Effectiveness

Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 22 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 22 19 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 0

18 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.18 Plant Modifications

Annually 7

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 22 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

4 2

Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.21N DBA (Programs)

Triennial 10 6

Complete Complete 71111.22 Surveillance Testing

Annually 17 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete - in previous year(s)

71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies

Biennial 1

1 Complete Complete Page 1 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.06 Drill Evaluation

Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete - in previous year(s)

71124.01 Rad Haz Assess Exposure Controls

Annually 7

7 Complete Complete 71124.02 Occupational ALARA

Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity

Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment

Biennial 5

5 Complete Complete 71124.05 Radiation Monitoring Instrumentation

Biennial 3

3 Complete Complete - in previous year(s)

71124.06 Rad Gas & Liquid Treatment

Biennial 6

6 Complete Complete - in previous year(s)

71124.07 Radiological Environmental Monitoring Program

Biennial 3

3 Complete Complete - in previous year(s)

71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 6

6 Complete Complete - in previous year(s)

71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 24 24 Complete Complete 71152 PI&R Annually 9

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED

Annually 5

1 Complete Complete 994OA7 LINCVs Annually 4

1 Complete Complete Page 2 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 4

Callaway (CALL)

Inspection Cycle: 2017

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 4

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 12 12 Complete Complete 71111.04S Equipment Alignment

Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual

Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly

Quarterly 18 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 1

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.08P Inservice Inspection Activities - PWR

Biennial 3

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual

Annually 0

1 Complete Complete - by reference iaw IMC 0306

71111.11B Licensed Op Requal & Perform - Biennial

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 15 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 19 15 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 0

18 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.18 Plant Modifications

Annually 4

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

1 2

Complete Complete - minimum sample not available iaw IMC 0306 71111.21M DBA (Teams)

Triennial 17 9

Complete Complete 71111.21N DBA (Programs)

Triennial 0

6 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.22 Surveillance Testing

Annually 17 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete - in previous year(s)

71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete - in previous year(s)

71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 5

1 Complete Complete Page 3 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.05 Correction of EP Weaknesses & Deficiencies

Biennial 1

1 Complete Complete - in previous year(s)

71114.06 Drill Evaluation

Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls

Annually 7

7 Complete Complete 71124.02 Occupational ALARA

Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity

Biennial 4

4 Complete Complete - in previous year(s)

71124.04 Occupational Dose Assessment

Biennial 5

5 Complete Complete - in previous year(s)

71124.05 Radiation Monitoring Instrumentation

Biennial 3

3 Complete Complete 71124.06 Rad Gas & Liquid Treatment

Biennial 6

6 Complete Complete 71124.07 Radiological Environmental Monitoring Program

Biennial 3

3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 6

6 Complete Complete 71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 16 13 Complete Complete 71152 PI&R Annually 6

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete - in previous year(s)

71153 Followup of Events and NOED

Annually 4

1 Complete Complete 994OA7 LINCVs Annually 1

1 Complete Complete Page 4 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 4

Columbia Generating Station (WNP)

Inspection Cycle: 2017

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 5

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 13 12 Complete Complete 71111.04S Equipment Alignment

Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual

Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly

Quarterly 17 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 2

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.08G Inservice Inspection Activities - BWR

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform - Biennial

Biennial 1

1 Complete Complete - in previous year(s)

71111.11Q Licensed Op Requal & Perform - Quarterly

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 10 8

Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 18 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 20 15 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 29 18 Complete Complete 71111.18 Plant Modifications

Annually 7

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 23 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

2 2

Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.21N DBA (Programs)

Triennial 0

6 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.22 Surveillance Testing

Annually 24 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete - in previous year(s)

71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies

Biennial 1

1 Complete Complete Page 5 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.06 Drill Evaluation

Annually 4

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete - in previous year(s)

71124.01 Rad Haz Assess Exposure Controls

Annually 7

7 Complete Complete 71124.02 Occupational ALARA

Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity

Biennial 4

4 Complete Complete - in previous year(s)

71124.04 Occupational Dose Assessment

Biennial 5

5 Complete Complete - in previous year(s)

71124.05 Radiation Monitoring Instrumentation

Biennial 3

3 Complete Complete 71124.06 Rad Gas & Liquid Treatment

Biennial 6

6 Complete Complete 71124.07 Radiological Environmental Monitoring Program

Biennial 3

3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 6

6 Complete Complete 71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 13 13 Complete Complete 71152 PI&R Annually 11 6

Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED

Annually 7

1 Complete Complete 994OA7 LINCVs Annually 3

1 Complete Complete Page 6 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 4

Comanche Peak (CP)

Inspection Cycle: 2017

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 4

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 12 12 Complete Complete 71111.04S Equipment Alignment

Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual

Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly

Quarterly 17 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 4

4 Complete Complete 71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Complete Complete - by reference iaw IMC 0306

71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 1

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 3

2 Complete Complete 71111.08P Inservice Inspection Activities - PWR

Biennial 3

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual

Annually 0

1 Complete Complete - by reference iaw IMC 0306

71111.11B Licensed Op Requal & Perform - Biennial

Biennial 2

1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 19 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 21 19 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 0

18 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.18 Plant Modifications

Annually 4

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

3 2

Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.21N DBA (Programs)

Triennial 9

6 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.22 Surveillance Testing

Annually 18 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete - in previous year(s)

71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete - in previous year(s)

71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies

Biennial 1

1 Complete Complete - in previous year(s)

71114.06 Drill Evaluation

Annually 3

3 Complete Complete Page 7 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls

Annually 7

7 Complete Complete 71124.02 Occupational ALARA

Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity

Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment

Biennial 5

5 Complete Complete 71124.05 Radiation Monitoring Instrumentation

Biennial 1

3 Complete Complete - in previous year(s)

71124.06 Rad Gas & Liquid Treatment

Biennial 1

6 Complete Complete - in previous year(s)

71124.07 Radiological Environmental Monitoring Program

Biennial 1

3 Complete Complete - in previous year(s)

71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 6

6 Complete Complete - in previous year(s)

71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 27 24 Complete Complete 71152 PI&R Annually 6

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED

Annually 5

1 Complete Complete 994OA7 LINCVs Annually 4

1 Complete Complete Page 8 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 4

Cooper (CNS)

Inspection Cycle: 2017

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 4

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 12 12 Complete Complete 71111.04S Equipment Alignment

Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual

Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly

Quarterly 16 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 2

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.08G Inservice Inspection Activities - BWR

Biennial 1

1 Complete Complete - in previous year(s)

71111.11A Licensed Op Requal & Perform - Annual

Annually 0

1 Complete Complete - by reference iaw IMC 0306

71111.11B Licensed Op Requal & Perform - Biennial

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 21 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 21 15 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 0

18 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.18 Plant Modifications

Annually 3

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 22 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

0 2

Complete Complete - opportunity to apply full procedure not

available iaw IMC 0306

71111.21M DBA (Teams)

Triennial 0

9 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.21N DBA (Programs)

Triennial 10 6

Complete Complete 71111.22 Surveillance Testing

Annually 21 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete - in previous year(s)

71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 6

1 Complete Complete Page 9 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.05 Correction of EP Weaknesses & Deficiencies

Biennial 1

1 Complete Complete 71114.06 Drill Evaluation

Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete - in previous year(s)

71124.01 Rad Haz Assess Exposure Controls

Annually 7

7 Complete Complete 71124.02 Occupational ALARA

Biennial 5

5 Complete Complete - in previous year(s)

71124.03 Airbore Radioactivity

Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment

Biennial 5

5 Complete Complete - in previous year(s)

71124.05 Radiation Monitoring Instrumentation

Biennial 3

3 Complete Complete 71124.06 Rad Gas & Liquid Treatment

Biennial 6

6 Complete Complete 71124.07 Radiological Environmental Monitoring Program

Biennial 3

3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 6

6 Complete Complete 71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 13 13 Complete Complete 71152 PI&R Annually 9

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED

Annually 10 1

Complete Complete 994OA7 LINCVs Annually 2

1 Complete Complete Page 10 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 4

Diablo Canyon (DIAB)

Inspection Cycle: 2017

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 5

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment

Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual

Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly

Quarterly 19 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 2

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.08P Inservice Inspection Activities - PWR

Biennial 2

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual

Annually 0

1 Complete Complete - by reference iaw IMC 0306

71111.11B Licensed Op Requal & Perform - Biennial

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 16 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 22 19 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 19 18 Complete Complete 71111.18 Plant Modifications

Annually 4

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 22 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

1 2

Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.21N DBA (Programs)

Triennial 0

6 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.22 Surveillance Testing

Annually 18 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete - in previous year(s)

71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 2

1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies

Biennial 1

1 Complete Complete Page 11 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.06 Drill Evaluation

Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete - in previous year(s)

71124.01 Rad Haz Assess Exposure Controls

Annually 7

7 Complete Complete 71124.02 Occupational ALARA

Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity

Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment

Biennial 5

5 Complete Complete 71124.05 Radiation Monitoring Instrumentation

Biennial 3

3 Complete Complete - in previous year(s)

71124.06 Rad Gas & Liquid Treatment

Biennial 6

6 Complete Complete - in previous year(s)

71124.07 Radiological Environmental Monitoring Program

Biennial 3

3 Complete Complete - in previous year(s)

71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 6

6 Complete Complete - in previous year(s)

71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 29 24 Complete Complete 71152 PI&R Annually 7

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete - in previous year(s)

71153 Followup of Events and NOED

Annually 4

1 Complete Complete 994OA7 LINCVs Annually 1

1 Complete Complete Page 12 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 4

Grand Gulf (GG)

Inspection Cycle: 2017

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 4

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 12 12 Complete Complete 71111.04S Equipment Alignment

Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual

Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly

Quarterly 18 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 7

4 Complete Complete 71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 1

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.08G Inservice Inspection Activities - BWR

Biennial 1

1 Complete Complete - in previous year(s)

71111.11A Licensed Op Requal & Perform - Annual

Annually 0

1 Complete Complete - by reference iaw IMC 0306

71111.11B Licensed Op Requal & Perform - Biennial

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly

Quarterly 13 8

Complete Complete 71111.12 Maintenance Effectiveness

Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 18 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 16 15 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 0

18 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.18 Plant Modifications

Annually 4

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 22 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

6 2

Complete Complete 71111.21M DBA (Teams)

Triennial 19 9

Complete Complete 71111.21N DBA (Programs)

Triennial 0

6 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.22 Surveillance Testing

Annually 16 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies

Biennial 1

1 Complete Complete Page 13 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.06 Drill Evaluation

Annually 4

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls

Annually 7

7 Complete Complete 71124.02 Occupational ALARA

Biennial 5

5 Complete Complete - in previous year(s)

71124.03 Airbore Radioactivity

Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment

Biennial 5

5 Complete Complete - in previous year(s)

71124.05 Radiation Monitoring Instrumentation

Biennial 3

3 Complete Complete 71124.06 Rad Gas & Liquid Treatment

Biennial 6

6 Complete Complete 71124.07 Radiological Environmental Monitoring Program

Biennial 3

3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 6

6 Complete Complete 71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 16 13 Complete Complete 71152 PI&R Annually 8

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Incomplete

71153 Followup of Events and NOED

Annually 3

1 Complete Complete 994OA7 LINCVs Annually 10 1

Complete Complete Page 14 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 4

Palo Verde (PALO)

Inspection Cycle: 2017

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 4

4 Complete Complete - by reference iaw IMC 0306

71111.04 Equipment Alignment (Quarterly)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment

Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual

Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly

Quarterly 21 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 5

2 Complete Complete 71111.07A Heat Sink Performance

Annually 2

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.08P Inservice Inspection Activities - PWR

Biennial 5

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform - Biennial

Biennial 1

1 Complete Complete - in previous year(s)

71111.11Q Licensed Op Requal & Perform - Quarterly

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 18 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 25 22 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 34 18 Complete Complete 71111.18 Plant Modifications

Annually 3

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

3 2

Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.21N DBA (Programs)

Triennial 0

6 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.22 Surveillance Testing

Annually 20 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete - in previous year(s)

71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete - in previous year(s)

71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 3

1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies

Biennial 1

1 Complete Complete - in previous year(s)

Page 15 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.06 Drill Evaluation

Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls

Annually 7

7 Complete Complete 71124.02 Occupational ALARA

Biennial 7

5 Complete Complete 71124.03 Airbore Radioactivity

Biennial 4

4 Complete Complete - in previous year(s)

71124.04 Occupational Dose Assessment

Biennial 5

5 Complete Complete - in previous year(s)

71124.05 Radiation Monitoring Instrumentation

Biennial 3

3 Complete Complete 71124.06 Rad Gas & Liquid Treatment

Biennial 6

6 Complete Complete 71124.07 Radiological Environmental Monitoring Program

Biennial 3

3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 6

6 Complete Complete 71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 35 35 Complete Complete 71152 PI&R Annually 7

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete - in previous year(s)

71153 Followup of Events and NOED

Annually 5

1 Complete Complete 994OA7 LINCVs Annually 1

1 Complete Complete Page 16 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 4

River Bend (RBS)

Inspection Cycle: 2017

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 4

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 12 12 Complete Complete 71111.04S Equipment Alignment

Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual

Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly

Quarterly 17 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 1

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 4

2 Complete Complete 71111.08G Inservice Inspection Activities - BWR

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform - Biennial

Biennial 1

1 Complete Complete - in previous year(s)

71111.11Q Licensed Op Requal & Perform - Quarterly

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 14 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 15 15 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 0

18 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.18 Plant Modifications

Annually 3

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 20 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

1 2

Complete Complete 71111.21M DBA (Teams)

Triennial 22 9

Complete Complete 71111.21N DBA (Programs)

Triennial 0

6 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.22 Surveillance Testing

Annually 14 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete - in previous year(s)

71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 0

1 Complete Complete - minimum sample not available iaw IMC 0306 71114.05 Correction of EP Weaknesses & Deficiencies

Biennial 1

1 Complete Complete Page 17 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.06 Drill Evaluation

Annually 4

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete - in previous year(s)

71124.01 Rad Haz Assess Exposure Controls

Annually 7

7 Complete Complete 71124.02 Occupational ALARA

Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity

Biennial 4

4 Complete Complete - in previous year(s)

71124.04 Occupational Dose Assessment

Biennial 5

5 Complete Complete - in previous year(s)

71124.05 Radiation Monitoring Instrumentation

Biennial 3

3 Complete Complete 71124.06 Rad Gas & Liquid Treatment

Biennial 6

6 Complete Complete 71124.07 Radiological Environmental Monitoring Program

Biennial 3

3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 6

6 Complete Complete 71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 13 13 Complete Complete 71152 PI&R Annually 6

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED

Annually 9

1 Complete Complete 994OA7 LINCVs Annually 3

1 Complete Complete Page 18 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 4

South Texas Project (STP)

Inspection Cycle: 2017

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 6

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment

Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual

Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly

Quarterly 20 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 6

4 Complete Complete 71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Complete Complete - by reference iaw IMC 0306

71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 1

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.08P Inservice Inspection Activities - PWR

Biennial 2

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual

Annually 0

1 Complete Complete - by reference iaw IMC 0306

71111.11B Licensed Op Requal & Perform - Biennial

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 17 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 20 19 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 27 18 Complete Complete 71111.18 Plant Modifications

Annually 3

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

2 2

Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.21N DBA (Programs)

Triennial 0

6 Complete Complete - in previous year(s)

71111.22 Surveillance Testing

Annually 19 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete - in previous year(s)

71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 0

1 Complete Complete - minimum sample not available iaw IMC 0306 71114.05 Correction of EP Weaknesses & Deficiencies

Biennial 1

1 Complete Complete - in previous year(s)

71114.06 Drill Evaluation

Annually 4

3 Complete Complete Page 19 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete - in previous year(s)

71124.01 Rad Haz Assess Exposure Controls

Annually 7

7 Complete Complete 71124.02 Occupational ALARA

Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity

Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment

Biennial 5

5 Complete Complete 71124.05 Radiation Monitoring Instrumentation

Biennial 3

3 Complete Complete - in previous year(s)

71124.06 Rad Gas & Liquid Treatment

Biennial 6

6 Complete Complete - in previous year(s)

71124.07 Radiological Environmental Monitoring Program

Biennial 3

3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 6

6 Complete Complete - in previous year(s)

71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 24 24 Complete Complete 71152 PI&R Annually 6

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete - in previous year(s)

71153 Followup of Events and NOED

Annually 3

1 Complete Complete 994OA7 LINCVs Annually 0

1 Complete Complete - by reference iaw IMC 0306

Page 20 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 4

Waterford (WAT)

Inspection Cycle: 2017

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 5

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment

Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual

Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly

Quarterly 19 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 0

4 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.06 Flood Protection Measures

Annually 2

2 Complete Complete - by reference iaw IMC 0306

71111.07A Heat Sink Performance

Annually 1

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 3

2 Complete Complete 71111.08P Inservice Inspection Activities - PWR

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform - Annual

Annually 0

1 Complete Complete - by reference iaw IMC 0306

71111.11B Licensed Op Requal & Perform - Biennial

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform - Quarterly

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 19 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 17 15 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 0

18 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.18 Plant Modifications

Annually 4

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 20 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

2 2

Complete Complete 71111.21M DBA (Teams)

Triennial 15 9

Complete Complete 71111.21N DBA (Programs)

Triennial 0

6 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.22 Surveillance Testing

Annually 18 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete - in previous year(s)

71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete - in previous year(s)

71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 4

1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies

Biennial 1

1 Complete Complete - in previous year(s)

Page 21 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.06 Drill Evaluation

Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls

Annually 7

7 Complete Complete 71124.02 Occupational ALARA

Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity

Biennial 4

4 Complete Complete - in previous year(s)

71124.04 Occupational Dose Assessment

Biennial 5

5 Complete Complete - in previous year(s)

71124.05 Radiation Monitoring Instrumentation

Biennial 3

3 Complete Complete 71124.06 Rad Gas & Liquid Treatment

Biennial 6

6 Complete Complete 71124.07 Radiological Environmental Monitoring Program

Biennial 3

3 Complete Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 6

6 Complete Complete 71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 13 13 Complete Complete 71152 PI&R Annually 6

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete - in previous year(s)

71153 Followup of Events and NOED

Annually 3

1 Complete Complete 994OA7 LINCVs Annually 1

1 Complete Complete Page 22 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

Region No: 4

Wolf Creek (WC)

Inspection Cycle: 2017

Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection

Annually 5

4 Complete Complete 71111.04 Equipment Alignment (Quarterly)

Annually 14 12 Complete Complete 71111.04S Equipment Alignment

Annually 2

2 Complete Complete 71111.05A Fire Protection - Annual

Annually 1

1 Complete Complete 71111.05Q Fire Protection - Quarterly

Quarterly 20 16 Complete Complete 71111.05T Fire Protection (Triennial)

Triennial 7

4 Complete Complete 71111.05XT

Fire Protection - NFPA 805 (Triennial)

Triennial 0

3 Complete Complete - by reference iaw IMC 0306

71111.06 Flood Protection Measures

Annually 3

2 Complete Complete 71111.07A Heat Sink Performance

Annually 2

1 Complete Complete 71111.07T Heat Sink Performance

Triennial 0

2 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.08P Inservice Inspection Activities - PWR

Biennial 1

1 Complete Complete - in previous year(s)

71111.11A Licensed Op Requal & Perform - Annual

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform - Biennial

Biennial 1

1 Complete Complete - in previous year(s)

71111.11Q Licensed Op Requal & Perform - Quarterly

Quarterly 8

8 Complete Complete 71111.12 Maintenance Effectiveness

Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control

Annually 16 14 Complete Complete 71111.15 Oper Determinations/Functionality

Annually 15 15 Complete Complete 71111.17T Changes, Tests, and Experiments

Triennial 0

18 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.18 Plant Modifications

Annually 3

3 Complete Complete 71111.19 Post Maintenance Testing

Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities

When required

0 2

Complete Complete - minimum sample not available iaw IMC 0306 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71111.21N DBA (Programs)

Triennial 10 6

Complete Complete 71111.22 Surveillance Testing

Annually 18 14 Complete Complete 71114.01 Exercise Evaluation

Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing

Biennial 1

1 Complete Complete - in previous year(s)

71114.03 Emergency Response Organizational

Staffing/Augmentation

Biennial 1

1 Complete Complete - in previous year(s)

71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs

Annually 1

1 Complete Complete 71114.05 Correction of EP Weaknesses & Deficiencies

Biennial 1

1 Complete Complete - in previous year(s)

Page 23 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

71114.06 Drill Evaluation

Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable

Not Applicable - completion not required during this

inspection cycle

71114.08 Exercise Evaluation

Scenario Review

Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls

Annually 7

7 Complete Complete 71124.02 Occupational ALARA

Biennial 5

5 Complete Complete 71124.03 Airbore Radioactivity

Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment

Biennial 5

5 Complete Complete 71124.05 Radiation Monitoring Instrumentation

Biennial 3

3 Complete Complete - in previous year(s)

71124.06 Rad Gas & Liquid Treatment

Biennial 6

6 Complete Complete - in previous year(s)

71124.07 Radiological Environmental Monitoring Program

Biennial 3

3 Complete Complete - in previous year(s)

71124.08 Solid Waste Proc, Handling, Stor, Transp

Biennial 6

6 Complete Complete - in previous year(s)

71151 Performance Indicator Verification

Annually 3

3 Complete Complete 71151 Performance Indicator Verification

Annually 13 13 Complete Complete 71152 PI&R Annually 7

6 Complete Complete 71152B PI&R (Biennial)

Biennial 1

1 Complete Complete - in previous year(s)

71153 Followup of Events and NOED

Annually 3

1 Complete Complete 994OA7 LINCVs Annually 1

1 Complete Complete Page 24 of 24

2/26/2018 6:24:12 PM

Note: Biennial samples completed are the total of

2016 and 2017

. Triennial samples completed are the total between

2017 and 2019

.

Baseline Inspection Completion By Site

IR Report 8a

ML18057B084 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: By:EAR4/rdr Yes No Publicly Available Sensitive NRC-002 OFFICE TL:IPAT D:DRS D:DRP NAME ERuesch TVegel TPruett SIGNATURE /RA/ /RA/ /RA/ DATE 2/26/18 2/26/18 2/26/18