05000458/FIN-2012004-03
From kanterella
Revision as of 14:06, 30 September 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Finding | |
|---|---|
| Title | Failure To Appropriately Tune The Reactor Core Isolation Cooling Turbine Speed Controller |
| Description | The inspectors identified a non-cited violation of 10 CFR 50 Appendix B, Criterion V, Instructions, Procedures, and Drawings, associated with inadequate instructions for tuning the reactor core isolation cooling (RCIC) terry turbine speed governor. The licensees immediate corrective actions included revising the maintenance procedure and recalibrating the RCIC turbine speed - 4 - Enclosure controller. The station documented the finding in Condition Reports CR-RBS- 2012-01750 and CR-RBS-2012-01904. This performance deficiency is more-than-minor and is therefore finding because it is associated with the equipment performance attribute of the Mitigating Systems cornerstone and affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, during operation, this performance deficiency resulted in improper tuning of the turbine speed control system, which caused the turbine exhaust check valve to repeatedly slam against its open and shut valve stops and abnormally large turbine governor valve oscillations. Because the licensee had not tuned the turbine speed control system to run at a steady speed, the licensee removed RCIC from service to properly calibrate the control system, thereby adversely affecting RCIC availability. Using NRC Inspection Manual Chapter 0609, Attachment 4, Initial Characterization of Findings, the inspectors determined that the issue affected the Mitigating Systems Cornerstone. Using NRC Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings at Power, the inspectors determined that the issue had very low safety significance (Green) because the finding was not a deficiency affecting the design or qualification; did not represent a loss of system and/or function, did not represent either an actual loss of function of at least a single train for greater than its Technical Specification Allowed Outage Time, or two separate safety systems out-of-service for greater than its Technical Specification Allowed Outage Time; and did not represent an actual loss of function of one or more non-Technical Specification trains of equipment designated as high safety-significant in accordance with the licensees maintenance rule program for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The inspectors determined the apparent cause of this finding was the licensees failure to incorporate industry and vendor operating experience into the work instructions on February 12, 2011, to correct RCIC governor valve oscillations. Therefore, this finding has a cross-cutting aspect in the area of problem identification and resolution associated with the operating experience component because the licensee did not implement and institutionalize industry knowledge, including vendor recommendations, to support plant safety. |
| Site: | River Bend |
|---|---|
| Report | IR 05000458/2012004 Section 1R15 |
| Date counted | Sep 30, 2012 (2012Q3) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.15 |
| Inspectors (proximate) | G Guerra P Elkmann A Barrett W Sifre J Laughlin R Hagar M Young G Larkin G Apger B Rice C Steely D Strickland |
| CCA | P.5, Operating Experience |
| INPO aspect | CL.1 |
| ' | |
Finding - River Bend - IR 05000458/2012004 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (River Bend) @ 2012Q3