NRC Generic Letter 1988-09
-UNITED STATES NUCLEAR REGULATORY
COMMISSION
WASHINGTON, D. C. 20555 May 17, 1988 TO LICENSEES
OF ALL BOILING-WATER
REACTORS AND APPLICANTS
FOR A BOILING WATER REACTOR OPERATORS'
LICENSE UNDER 10 CFR 55 SUBJECT: PILOT TESTING OF FUNDAMENTALS
EXAMINATION (Generic Letter 88-09 )This letter is to inform facility licensees and potential applicants under 10 CFR 55 of a pilot testing program of a fundamentals examination for Boiling Water Reactors (BWRs). The pilot test is to refine the examination development methodology, administration, and grading process..
Applicants who participate in this pilot test and achieve a passing grade of 70 percent or more will receive a waiver under 10 CFR 55.47 of the applicable section of the written examination under §55.41 or §55.43.The staff's review of the content of examinations under 10 CFR 55, which is contained in Examiner Standards
202 and 402 of NUREG-1021, Operator Licensing Examiner Standards," indicates that the subject matter presented in some sections is generic to all BWRs. The subject matter includes reactor theory, heat transfer, thermodynamics, fluid flow and component operations.
The staff's review of current training programs indicates that those topics are normally presented early in the operator and senior operator training programs.
Mastery of these fundamentals is an important first step of training, which include systems and plant characteristics, on-the-job training, and simulator training.In developing the fundamentals examination, the staff used subject matter contained in the 291000 to 293000 series of the "Knowledge and Abilities (K/A) Catalog for Nuclear Power Plant Operators:
Boiling Water Reactors" (NUREG-1123).
The K/As provided the basis of testing objectives and a bank of multiple choice questions has been developed and screened for use in this examination.
The examination will contain approximately
50 multiple choice questions and will require approximately three hours to complete.
For pilot testing, we expect to simultaneously administer the pilot examination at each regional office throughout the country. Since the examination will be graded by machine, we expect to promulgate the test results within 10 days after administration of the examination.
Copies of the fundamentals examination test sheets will be returned to each volunteer and facility training department.
Comments by the volunteers and training department managers will be accepted and summarized in a subsequent Commission Paper. The Commission will evaluate a policy to require passing the fundamentals examination as a condition for nuclear power plant operator license applications under 10 CFR 55.31.LT12-
-2 -The conditions listed below will apply for pilot testing of the fundamentals examination.
° The Commission will waive the usual requirements under 10 CFR 55.31 Subpart D -Applications.
Therefore, Form NRC-398 does not need to be submitted.
V Volunteers who pass the fundamental examination with a score of 70 percent or greater will be granted a waiver of the written examination under §55.47 of Section 1 or Section 5, as appropriate.
o Volunteers who do not achieve a grade of 70 percent will be able to take the entire regularly scheduled written examination at the site. Since a formal application under §55.31 is not required, the provision of §55.35, Re-applications, will not apply.o Pilot testing of this examination is planned for Summer 1988. Licensees and volunteers will be informed of the date, time, and location of the examinations within 60 days after the date of this generic letter.Licensees interested in participating in this program are requested to submit the enclosed application for each candidate to Mr. John N. Hannon, Chief, Operator Licensing Branch, Office of Nuclear Reactor Regulation, U. S.Nulear Reguatoy Commission, Wasingtnn, DC 20555, witha-copytothe- appropriate Regional Administrator.
We appreciate the cooperation of each participant.
If you have any questions concerning this generic letter, please call Mr. Hannon at (301) 492-1031.This request was approved by the Office of Management and Budget under clearance number 3150-0131.
Clearance number 3150-0131 expires August 31, 1988. Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management, Room 3208, New Executive Office Building, Washington, DC 20503.Sincerely, Frank J. Q4ragla ssoclate Director for Projects Office of Nuclear Reactor Regulation Enclosure:
Application for Pilot Testing of Fundamentals Examination I: v -N Enclosure (GL 88-09)I, _, employed at the (Name) (Station Name)50- request participation in the Pilot Test Program of (Docket Number)the Fundamentals Examination for operator or senior operator licenses.
I agree to the conditions outlined in GL-88-( ).Applicant:
Date e:;41 U4 1 14wv --I -T a->Approved: Training Department Manager Date EIOF RCINTIV ISSULE GENERIC LETTERS Generic Date :, L*cttf Nc. Suojec: Issuancu tssued To GL 38-OS MAIL SENT DR DELIVERED
To THO 09/03/S ALL LICENSEES OFFICE OF NUCLEAR REACTOR FOR POWER AND REGULATION
NON-POWER REACTORS AND HOLDERS OF CONSTRUCT
I ON PERMITS FOR NUCLEAR POWER REACTORS DL 88-07 MODIFIED ENFORCEMENT
POLICY 04/07/89 ALL POWER RELATING TO 10 CFR S0.49. REACTOR'ENVtRONMENTALCUALIFtCATION
OF LICENSEES
AND ELECTRICAL
EQUIPMENT
IMPORTANT
APPLICANTS
To SL aa-0o REMOVAL OF ORGANIZATION
CHARTS 03/22/S8 ALL POWER FROM TECHNICAL
SPECIFICATION
REACTOR ADMINISTRATIVE
CONTROL LICENSEES
AND REQUIREMENTS
APPLICANTS
GL 9S-05 8ORtC ACID CORROSION
OF CARsON 031t7/38 ALL LICENSEES
-STEEL REACTOR PRESSURE OF OPERATING NOUNDARY COMPONENTS
IN PWRS AND PWR PLANTS HOLDERS OF CONSTRUCTION
PERMITS FOR PWRS GL S9-04 DISTRISUTION
OF GEMS 02/23/S8 ALL NON-POWER IRRADIATED
IN RESEARCH REACTOR REACTORS LICENSEES aL S9-03 RESOLUTION
OF GENERIC SAFETY 02/17/89 ALL LICENSEES.
IStSU 93, "STEAM SINDIND OF APPLICANTS
FOR AUXILIARY
PUMPS' OPERATING LICENSES, AND HOLDERS Or CONSTRUCTION
PERMITS FOR PRESSUR I ZED WATER REACTORS SL 88-02 'INTEGRATED
SEFETY ASSESSMENT
Ot/20/89 ALL POWER PROGRAM tl (ISAP tl)' REACTOR LICENSEES DL 93-01. "NRC POSITION ON 19SCC IN *WR 01/29/33 ALL LICENSEES AUSTENITIC
STAINLESS
STEEL OF OPERATINS PIPINS" 'OILINS WATER REACTCRS AND HOLDERS OF CONSTRUCT
ION PERMITS FOR BWRS UNITED STATES MAIL NUCLEAR REGULATORY
COMMISSION
POSTAGE
- FEES PAID WASHINGTON, D.C. 20555 USNRC PERMIT No. O-Z7 OFFICIAL BUSINESS PENALTY FOR PRIVATE USE, $300
Distribution Fundamentals DISTRIBUTION:
uoLRFw Central Files JJBuzy SFShankman LAWiens TLSzymanski JNHannon JWRoe JHSniezek FJMiraglia and Concurrence for Ge tr on Pilot Testing Of Examination dated -fo e ((A A DW/COMMISSION
PAPER/JB1^ 1a 11 a TA:NR 87 II /8i OLB:DLPQ JJBuzy 11/30/87 OLB:DLPQ LAWiens 11/30/87 OLB:DLPQ JNHannon 11/30/87 DDIR:DLPQ JAZwolinski
12/01/87 DIR:DLPQ JWRoe 12/02/87 TE AThoma 12/04/I OFFICIAL FILE COPY bJA2 ktg 4%/7/Sd Ap; 1 4* 5Vm*'~:k k&LA-I ' t