Plum Brook Reactor Facility (Pbrf Survey Unit Release Record EP 1.11
ML080590254
Person / Time
Site: Plum Brook  File:National Aeronautics and Space Administration icon.png
Issue date: 02/18/2008
From: Case R, Wood G
- No Known Affiliation
To:
NRC/RGN-III
References
EP 1.11
Download: ML080590254 (38)


Text

1 Survey Unit Release Record I 1 Design # I EP 1.11 1 Revision # I Original 1 Page 1 of 4 I Survey Unit #(s) Description

1) Embedded Pipe (EP) Survey Unit 1.11 meets the definition of embedded pipe for Plum Brook Reactor Facility (PBRF).
2) EP 1.1 1 is a Class 1, Group 1 survey unit as per the PBRF Final Status Survey Plan (FSSP) and Technical Basis Document (TBD)-06-004.
3) Surveys in EP 1 .I 1 were performed using a scintillation detector optimized to measure beta energies >85 keV (IS0 7503-1 Table3, Tc99). This energy is lower than the beta energy for Co60 (96 keV, IS0 7503-1 Table 3), assuring the nuclide of concern for DCGL is assessed during data acquisition.

1 4) Survey Instructions for this survey unit are incorporated into and performed in accordance with (IAW) the Babcock Services 1nLrporated (BSI)/LVS-003, Work Execution Package (WEP)05-006. Survev instructions described in this -. document constitute "Special ~kthods" and thesurvey design used in the acquisition of survey measurements.

5) Instnunent efficiency determinations are developed in accordance with the BSIILVS-003, WEP 05-006, these determinations are appropriate for the types of radiation involved and the media being surveyed.

FSSICharacterization Engineer FSSICharacterization Manager Approval Signatures Date: I I FSS Design # EP 1.11 Revision # Original Page 2 of 4 Survey Unit: 1.11 1.0 History/Description 1.1 The subject pipe is the 24" hot leg for the PCW system. The function of this piping was to convey heated water away from the reactor core.

1.2 EP 1.11 consists of 24" diameter piping that is approximately 146 feet in length. 2.0 Survey Design Information 2.1 EP 1.11 was surveyed IAW Procedure #BSI/LVS-003.

2.2 106 feet of the 24" pipe was accessible for survey. The inaccessible piping includes elbows (5) and the three feet of piping between the 0' elevation and the -3' elevation in the PPH Room

4. The elbows and their approaches are inaccessible to the pipecrawler. The 3' in PPH Room 4 is released to the structural DCGL and will not be grouted. The survey for this piping will be accomplished as part of the structural release survey in PPH Room
4. 2.3 100% of the accessible piping was scanned.

2.4 16 survey locations were selected by a random number generator for static measurements. The locations were assigned as eight from the vessel access point and eight from the PPH Room 4 access point. Five of these locations were in the inaccessible elbows. At each accessible location four static measurements were acquired IAW BSI/LVS-003 for a total of 44 static measurements (Att. 1A).

2.5 The surface area for the 24" piping is 5837 cm 2 for each foot of piping, corresponding to a piping surface area of 852202 cm 2 (85 m 2) for the 146 feet of embedded pipe 24" piping.

3.0 Survey Unit Measurement Locations/Data 3.1 Pipe interior radiological survey forms are provided in Attachment 2 of this release record.

4.0 Survey Unit Investigations/Results 4.1 None FSS Design # EP 1.11 Revision # Original Page 3 of 4 Survey Unit: 1.11 5.0 Data Assessment Results 5.1 Data assessment results are provided in the EP/Buried Pipe (BP) Survey Report provided in Attachment 1A & 1B.

5.2 This survey unit was assessed for compliance with the release criterion attributing all activity derived dose as a 100% Co60 nuclide distribution. This is the most conservative DCGL for the facility.

5.3 Scan measurements require a 90 second scan time to survey each section of accessible 24"piping at

< 1inch/second. The documented gross cpm measurement for each scan is the highest, instantaneous, cpm count rate

observed during the 90 second scan. The derived activity from these scan measurements is the most conserva tive quantity for that section of assessed piping. This conservatism is replicated when determining compliance with the DCGL releas e criterion. (BSI/LVS 003, WEP 05-000-6). 5.4 When implementing the Unity Rule, provided in Section 3.6.3 of the FSSP, the survey unit that is constituted by EP 1.11 passes FSS.

5.5 Background was not subtracted from the survey measurements and the Elevated Measurement Comparison (EMC) was not employed for this

survey unit.

5.6 Based upon the results of the final survey measurements including the scan survey of the upper piping boundary in the Primary Pump House, it is reasonable to conclude that the fina l survey of the accessible portions of this pipe system is appropriate to demonstrate the radi ological condition of the entire pipe. Survey Unit EP 1.11 demonstrates compliance with the inaccessible piping acceptance criteria of Section 7.5 of the PBRF FSSP.

5.7 The physical configuration of this surv ey unit consists of a 24" pipe in a conformal steel support box whic h is surrounded by a concrete sarcophagus of at least two feet in th ickness for the entire length of the piping bounded by the survey unit. There is no access into the survey unit from any adjacent survey units, and the steel support box is inaccessible to personnel.

5.8 It is presented that this piping consti tutes a single, contiguous and distinct survey unit unto itself. This survey units' dose contribution is <2 mr/yr and is significantly within a release criterion of 25mr/yr. The dose contribution of this survey unit does not impact adjacent structural survey units.

FSS Design # EP 1.11 Revision # Original Page 4 of 4 Survey Unit: 1.11 5.9 Statistical Summary Table Statistical Parameter 24" Pipe Total Number of Static Survey Measurements 44 Number of Measurements >MDC 44 Number of Measurements Above 50% of DCGL 20 Number of Measurements Above DCGL 0 Mean 0.505 Median 0.498 Standard Deviation 0.074 Maximum 0.699 Minimum 0.348 6.0 Documentation of evaluations pertaining to compliance with the unrestricted use limit of 25 mrem/yr and dose contributions from Embedded Pipe and radionuclides contributing 10% in aggregat e of the total dose for both structural scenarios and soils.

6.1 A review of the survey results has shown that the dose contribution for EP 1.11 to be less than 2 mrem/yr. The dose contribution is estimated to be 1.009 mrem/yr based on the average of the actual gross counts measured.

7.0 Attachments Attachment 1A - BSI EP/BP Survey Report Static & Random Number Generated Static Locations Attachment 1B - BSI EP/BP Survey Report Scan Attachment 2 - Pipe Interior Radiological Survey Form Attachment 3 - DQA Worksheet Attachment 4 - EP 1.11 SURR & Spreadsheet Disc SECTION 7 ATTACHMENT 1A 5 PAGES BSI EPIBP SURVEY REPORT (STATIC) Survey Technlc~an(s)

CTlVlTY VALUES NOT BACKGROUND CORRECTED.

RP Engineer I Date EP 1.11 24" Pipe TBD 06-004 Group 1Measurement ID #gcpmnet cpm Co-60 activity (total dpm)

Co-60 activity (dpm/100cm2)

Unity171539315393245,895 245,895 0.511181487714877237,652 237,652 0.493191679616796268,307 268,307 0.557201470114701234,840 234,840 0.488141398813988223,450 223,450 0.464151692216922270,319 270,319 0.561161591915919254,297 254,297 0.528171781117811284,521 284,521 0.591281611216112257,380 257,380 0.534291409114091225,096 225,096 0.467301517315173242,380 242,380 0.503311556615566248,658 248,658 0.51621485214852237,252 237,252 0.49331501715017239,888 239,888 0.49841301113011207,843 207,843 0.43251114911149178,099 178,099 0.370181485214852237,252 237,252 0.493191501715017239,888 239,888 0.498201506615066240,671 240,671 0.500211319113191210,719 210,719 0.438581606616066256,645 256,645 0.533591591915919254,297 254,297 0.528601379313793220,335 220,335 0.458611491414914238,243 238,243 0.495741391113911222,220 222,220 0.461751400414004223,706 223,706 0.465761571915719251,102 251,102 0.521771373213732219,361 219,361 0.455302106121061336,438 336,438 0.699311917919179306,374 306,374 0.636322013920139321,709 321,709 0.668332104721047336,214 336,214 0.698511050210502167,764 167,764 0.348521360913609217,396 217,396 0.451531266212662202,268 202,268 0.420541149711497183,658 183,658 0.381171619216192258,658 258,658 0.537181703317033272,093 272,093 0.565191557715577248,834 248,834 0.517 1 OF 2 EP 1.11 24" Pipe TBD 06-004 Group 1Measurement ID #gcpmnet cpm Co-60 activity (total dpm)

Co-60 activity (dpm/100cm2)

Unity201583915839253,019 253,019 0.525331381713817220,719 220,719 0.458341412114121225,575 225,575 0.468351532315323244,776 244,776 0.508361447914479231,294 231,294 0.480MEAN0.505MEDIAN0.498STD DEV0.074MAX0.699MIN0.348 2 OF 2 RANDOM GENERATED STATIC MEASUREMENT LOCATIONS VESSEL 1.11 SURVEY LOCATION COMMENTS 8 9 INACCESSIBLE 19 35 INACCESSIBLE 47 53 71 77 RANDOM GENERATED STATIC MEASUREMENT LOCATIONS PPH ROOM 4 1.11 SURVEY LOCATION COMMENTS 6 INACCESSIBLE 11 20 25 38 INACCESSIBLE 39 INACCESSIBLE 44 50 SECTION 7 ATTACHMENT 1B 6 PAGES BSl EPlBP SURVEY REPORT (SCAN) I Pipe ID 1 1.11 1 I Survey Location I PPH RM4 /Vessel Survey Date Survey Time Pipe Size 50% DCGL (dpm1100cm2)

Routine Survey QA Survey See Survey Sheets 2350-1 # see survey sheets Detector-Sled

  1. Detector Efficiency 203438 188383-LVS CRLR24 0.0595 Pipe Area Incorporated by Detector Efflclency (in cm2) I I Nominal MDC (dpmllOOcm2)

I 8,856 Survey Measurement Results 100 Field BKG (cpm) Field MDCR (CP~) I Total Number of Survey Measurements I 197 180 49 I Number of Measurements

>MDC I 197 I Mean I 0.542 Number of Measurements Above 50% DCGL Number of Measurements Above DCGL I Median I 0.544 156 0 Standard Deviation Maximum 0.056 0.674 Minimum 0.380 Survey Unit Classification TBD 06-004 Piping Group SR-13 Radionuclide Distribution Sample Area FactorIEMC Used I COMMENTS:

1 1 EP 3-9 No PassIFail FSS MREMNR Contribution I ACTIVITY VALUES NOT BACKGROUND CORRECTED.

Survey Technician(s)

Pass <2 WOOD RP Engineer I Date / 2-1 8-08 /"

EP 1.11 24" Pipe TBD 06-004 Group 1Measurement ID #gcpmnet cpm Co-60 activity (total dpm)

Co-60 activity (dpm/100cm2)

Unity11420014200238,655 238,655 0.49621680016800282,353 282,353 0.58631810018100304,202 304,202 0.63241720017200289,076 289,076 0.60051650016500277,311 277,311 0.57661660016600278,992 278,992 0.57971510015100253,782 253,782 0.52781610016100270,588 270,588 0.56291680016800282,353 282,353 0.586101730017300290,756 290,756 0.604111490014900250,420 250,420 0.520121470014700247,059 247,059 0.513131530015300257,143 257,143 0.534141550015500260,504 260,504 0.541151510015100253,782 253,782 0.527161600016000268,908 268,908 0.558211560015600262,185 262,185 0.544221630016300273,950 273,950 0.569231490014900250,420 250,420 0.52011660016600278,992 278,992 0.57921580015800265,546 265,546 0.55131510015100253,782 253,782 0.52741590015900267,227 267,227 0.55551800018000302,521 302,521 0.62861730017300290,756 290,756 0.60471770017700297,479 297,479 0.61881790017900300,840 300,840 0.62591790017900300,840 300,840 0.625101530015300257,143 257,143 0.534111540015400258,824 258,824 0.537121630016300273,950 273,950 0.569131610016100270,588 270,588 0.562181660016600278,992 278,992 0.579191600016000268,908 268,908 0.558201700017000285,714 285,714 0.593211770017700297,479 297,479 0.618221610016100270,588 270,588 0.562231680016800282,353 282,353 0.586241530015300257,143 257,143 0.534251720017200289,076 289,076 0.600261810018100304,202 304,202 0.632271800018000302,521 302,521 0.628321770017700297,479 297,479 0.618331710017100287,395 287,395 0.597 1 OF 5 EP 1.11 24" Pipe TBD 06-004 Group 1Measurement ID #gcpmnet cpm Co-60 activity (total dpm)

Co-60 activity (dpm/100cm2)

Unity11440014400242,017 242,017 0.50361490014900250,420 250,420 0.52071550015500260,504 260,504 0.54181530015300257,143 257,143 0.53491610016100270,588 270,588 0.562101540015400258,824 258,824 0.537111460014600245,378 245,378 0.510121530015300257,143 257,143 0.534131580015800265,546 265,546 0.551141610016100270,588 270,588 0.562151440014400242,017 242,017 0.503161510015100253,782 253,782 0.527171720017200289,076 289,076 0.600221430014300240,336 240,336 0.499231440014400242,017 242,017 0.503241570015700263,866 263,866 0.548251600016000268,908 268,908 0.558261620016200272,269 272,269 0.565271610016100270,588 270,588 0.562281490014900250,420 250,420 0.520291470014700247,059 247,059 0.513301390013900233,613 233,613 0.485311390013900233,613 233,613 0.485321530015300257,143 257,143 0.534331300013000218,487 218,487 0.454341410014100236,975 236,975 0.492351560015600262,185 262,185 0.544361610016100270,588 270,588 0.562371530015300257,143 257,143 0.534381400014000235,294 235,294 0.489391390013900233,613 233,613 0.485401430014300240,336 240,336 0.499411510015100253,782 253,782 0.527421570015700263,866 263,866 0.548431560015600262,185 262,185 0.544441610016100270,588 270,588 0.562451600016000268,908 268,908 0.558461620016200272,269 272,269 0.565471490014900250,420 250,420 0.520481510015100253,782 253,782 0.527491630016300273,950 273,950 0.569501600016000268,908 268,908 0.558511480014800248,739 248,739 0.516521390013900233,613 233,613 0.485 2 OF 5 EP 1.11 24" Pipe TBD 06-004 Group 1Measurement ID #gcpmnet cpm Co-60 activity (total dpm)

Co-60 activity (dpm/100cm2)

Unity531660016600278,992 278,992 0.579541570015700263,866 263,866 0.548551390013900233,613 233,613 0.485561400014000235,294 235,294 0.489571510015100253,782 253,782 0.527621600016000268,908 268,908 0.558631730017300290,756 290,756 0.604641610016100270,588 270,588 0.562651500015000252,101 252,101 0.523661570015700263,866 263,866 0.548671320013200221,849 221,849 0.461681490014900250,420 250,420 0.520691700017000285,714 285,714 0.593701630016300273,950 273,950 0.569711570015700263,866 263,866 0.548721610016100270,588 270,588 0.562731330013300223,529 223,529 0.464781490014900250,420 250,420 0.520791500015000252,101 252,101 0.52311570015700263,866 263,866 0.54821530015300257,143 257,143 0.53431660016600278,992 278,992 0.57941490014900250,420 250,420 0.52051390013900233,613 233,613 0.48561700017000285,714 285,714 0.59371560015600262,185 262,185 0.54481500015000252,101 252,101 0.52391490014900250,420 250,420 0.520101530015300257,143 257,143 0.534111550015500260,504 260,504 0.541121600016000268,908 268,908 0.558131630016300273,950 273,950 0.569141660016600278,992 278,992 0.579151660016600278,992 278,992 0.579161700017000285,714 285,714 0.593171710017100287,395 287,395 0.597181620016200272,269 272,269 0.565191690016900284,034 284,034 0.590201800018000302,521 302,521 0.628211810018100304,202 304,202 0.632221730017300290,756 290,756 0.604231800018000302,521 302,521 0.628241810018100304,202 304,202 0.632251770017700297,479 297,479 0.618 3 OF 5 EP 1.11 24" Pipe TBD 06-004 Group 1Measurement ID #gcpmnet cpm Co-60 activity (total dpm)

Co-60 activity (dpm/100cm2)

Unity261840018400309,244 309,244 0.642271720017200289,076 289,076 0.600281910019100321,008 321,008 0.667291900019000319,328 319,328 0.663341930019300324,370 324,370 0.674351870018700314,286 314,286 0.653361850018500310,924 310,924 0.646371710017100287,395 287,395 0.597381810018100304,202 304,202 0.632391430014300240,336 240,336 0.499401470014700247,059 247,059 0.513411440014400242,017 242,017 0.503421500015000252,101 252,101 0.523431530015300257,143 257,143 0.534441610016100270,588 270,588 0.562451570015700263,866 263,866 0.548461500015000252,101 252,101 0.523471480014800248,739 248,739 0.516481190011900200,000 200,000 0.415491200012000201,681 201,681 0.419501180011800198,319 198,319 0.412551170011700196,639 196,639 0.408561200012000201,681 201,681 0.419571260012600211,765 211,765 0.440581310013100220,168 220,168 0.457591090010900183,193 183,193 0.380601100011000184,874 184,874 0.384611140011400191,597 191,597 0.398621310013100220,168 220,168 0.457631220012200205,042 205,042 0.426641200012000201,681 201,681 0.41911900019000319,328 319,328 0.66321620016200272,269 272,269 0.56531730017300290,756 290,756 0.60441610016100270,588 270,588 0.56251570015700263,866 263,866 0.54861220012200205,042 205,042 0.42671390013900233,613 233,613 0.48581470014700247,059 247,059 0.51391480014800248,739 248,739 0.516101510015100253,782 253,782 0.527111530015300257,143 257,143 0.534121470014700247,059 247,059 0.513131390013900233,613 233,613 0.485 4 OF 5 EP 1.11 24" Pipe TBD 06-004 Group 1Measurement ID #gcpmnet cpm Co-60 activity (total dpm)

Co-60 activity (dpm/100cm2)

Unity141400014000235,294 235,294 0.489151460014600245,378 245,378 0.510161450014500243,697 243,697 0.506211420014200238,655 238,655 0.496221390013900233,613 233,613 0.485231470014700247,059 247,059 0.513241600016000268,908 268,908 0.558251550015500260,504 260,504 0.541261630016300273,950 273,950 0.569271470014700247,059 247,059 0.513281510015100253,782 253,782 0.527291310013100220,168 220,168 0.457301370013700230,252 230,252 0.478311430014300240,336 240,336 0.499321590015900267,227 267,227 0.555371430014300240,336 240,336 0.499381620016200272,269 272,269 0.565391570015700263,866 263,866 0.548401630016300273,950 273,950 0.569411410014100236,975 236,975 0.492421400014000235,294 235,294 0.489MEAN0.542MEDIAN0.544STD DEV0.056MAX0.674MIN0.380 5 OF 5 SECTION 7 ATTACHMENT 2 17 PAGES BSULVSPipeCrawler-003

,- ii Original Pipe Interior Radiological Survey Form Date: a Time: /&D Pipe ID#: / Pipe Diameter:

734. I, Access Point Area: Building:

pp/-) Elevation:

D ' System: Type of Survey Investigation Characterization Final Survey

% Other Gross % Co60 Cs137 Detector ID# I Sled ID# !s?63&3 I LK<&& Detector Cal Date: R-d-Vb Detector Cal Due Date:

4-'5-@7 Instrument:.

2360-1 Instrument D #: -ZVS#&~+ Instrument Cal Date: q-d -~6 Instrument Cal Due Date:

9-5 -07 From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value 1 80 cpm MDCRstauc 44 cpm Efficiency Factor for Pipe Diameter 0, 0Lz6 (from detector efficiency determination)

MDCSmc ~fl dpmi ~DD cm2 Is the MDCsmUc acceptable?

@ NO (~f no, adjust sample count bme and recalculate MDCL) Comments: . S~WLR~ .&9S, SPM ~7 &g&6 n Technician Signature Pipe Interior Radiological Survey Package Page 1 of & Attachment 3, Page 1 I 1 BSILVSPipeCrawler-003

\J I . 1 Original Pipe Interior Radiological Survey Form (Continnation Form) I Date: ,s;i-k-o7 Pipe ID#: I, 11 pipe beta: 1 zy 1 ACC~SS point hea: Building:

ff Elevation:

System: I Package page Zof 5 Attachment 3, Page 2

BSYLVSPipeCrawler-003 .J Original Pipe Interior Date: Time: - Pipe ID# Pipe Diameter Building:

Elevation:

S ystem: I Type of Survey Investigation Characterization inal Survey Other2 Gross )Q Co60 Cs137 Detector ID# I Sled ID# I % gakn Detector Cd Date: 476 *'o & -A -p 7 Instnunent:

z3SL.l - \ ~3i4/38 Instrument Cd Date: 4-5-2, b 4-5-07 From the Daily Pipe Survey Detector Control Form for the Selecte Detector Background Value ] cpm MDCRxtmc 49 cPm Efficiency Factor for Pipe Diameter Db Z6 4 (fiom del:ector efficiency determination) hfDCsm"c 7R-7 dpm/ . /- cm2 Is the MDC,ut,c acceptable?

@ NO (if no, adjust s ple count bme and recalculate MDCF&,) Comments:

7 I Technician Signature Pipe Interior Radiological Survey Package Page 1 of Z Attachment 3, Page 1

.d Pipe Interior Radiological Suwey Form (Continuation Form) 07 Date: 3 Pipe ID#: 1, \ \ PipeDiameter " 1 Building:

ffd Elevation:

0 j System: f'cd '. ., Package Page >of z - - Attachment 3, Page 2

BSI/LVSPipeCrawler-003 - - Original Pipe Interior R+diological Survey Form Date: 2-s-07 Time: 13 453 [ 1 Pipe ID#: I,\\ Pipe Diameter:

24 " Access Point Area: \/-4 Building:

ad Elevation:

-2~5 ' System: h Type of Survey Investigation - Characterization Final Survey & Other I( Gross X C06O Cs137 Detector ID# / Sled ID# 1%6383 / LGBC? L@- 4 Detector Cal Date: 4-5 -Z, (P Detector Cal Due Date: 9 0-7 Instrument:.

z~c5 I Instrument ID #: 203 4.36 Instrument Cal Date: i? b Instrument Cal Due Date:

$ 0 7 From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value 1 80 cpm MDCKmtlC 4 '7 cpm Efficiency Factor for Pipe Diameter D, D~P tb (from detector efficiency determination)

MDCsmc 7 b7 d~m/ IW cmZ Is the MDCSD,, acceptable?

a NO (if no, adjust sample count time and recalculate MDCR,,,c)

Comments:

.51,& 3 .oScj.(, 5k.7 *cz

  • 8U6 Technician Signature Pipe Interior Radiological Survey Package Page 1 of 3 Attachment 3, Page 1

--, Pipe Interior Radiological Survey Form (Conhation Form) BSIILVSPipeCrawler-003 - Original Date: '3-8-07 ~ipe ID* 1 .\\ u/ Pipewyonex 4 I' A-s Point h: ~~4 Building: -a' System: Package Page 2 of? Attachment 3, Page 2 Pipe Interior Radiological Survey Form (Continuation Form) BSYLVSPipeCrawler-003 Original Date: 3--~-~7 I( Pipe ID#: \.\II Pipe Diameter:

~"4 Access Point Area: Building:

'ppit Elevation:

--225" System: Package page 2 of 3 Attachment 3, Page 2 r z - o 7 Pipe Interior Radiological Survey Form BSJLVSPipeCrawler-003 Original Date: Time: 0 @830 Pipe ID#: 1-11 Pipe Diameter:

ZX/ " Access Point Area: Building:

'7 Elevation:

-25 System: Type of Survey Investigation - Characterization Final Survey K Other % Gross h Co60 Cs137 Detector ID# I Sled ID# \%a 3 83 1 CV'~P@L-R.ZL~! Detector Cal Date:

4-5 -Wb Detector Cal Due Date: 4-3-0 7 Instnunent: . 2350- 1 Instrument ID #: -a734'3@ Instrument Cal Date: 0-5 -0b Instnunent Cal Due Date:

4-8-277 From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value ) cpm MDClZrailc 44 CPm Efficiency Factor for Pipe Diameter 0. ObZb (fiorn detector efficiency determination)

MDCsmhc 7g7 dpd I /x, CUI' Is the MDCsa,,, acceptable?

a NO (if no, adjust sample count tune and recalculate MDcR,t.ac)

Comments:

rr? SPA 9856 Srax, etfr> Q. 044~ A Technician Signature Pipe Interior Radiological Survey Package Page 1 of 2 EFERENCE COP Attachment 3, Page 1

.- Pipe Interior Radiological Survey Form (Continuation Form) BSVLVSPipeCrawler-003 Original Date: 3-12-67 pipe hem: &" Access Point Area: Building:

-25 System: REFERENCECOPY Attachment 3, Page 2

., Pipe Interior Radiological Survey Form (Continuation Form) BSIILVSPipeCrawler-003 Original Date: 3- r 2-07 Pipe ID#: \.It Pipe Diameter:

a " Access Point Area: I/-,/ Building:

(1A/ Elevation:

-~5! System: pL?d REFERENCE COPY Package Page 3 of 3 Attachment 3, Page 2

BSIiLVSPipeCrawler-003 Original - - Pipe Interior Radiological Survey Form Date: L/- 1-07 Time: /oL/~ Pipe ID#: /, // Pipe Diameter:

Building:

Pp C) Elevation:

System: Type of Survey Investigation Characterization Final Survey F- Other Gross )c C06O Cs137 Detector ID# / Sled ID# 88383 / LJ~POLR-Z~

Detector Cal Date:

4 Ole Detector Cal Due Date: 5 87 Instrument:

2350 - 1 btrument ID #: -3.t3& Instrument CaI Date: 4-5 -o& Instnunent Cal Due Date: Q-U5-07 From the Daily Plpe Survey Detector Control Fonn for the Selected Detector Background Value 1 %2 cpm MDCIttPtlo L-P? cpm Efficiency Factor for Pipe Diameter 5,~ W (from detector efficiency determination)

MDcsmc 7 87 dpml !p cm2 Is the MDCSun, acceptable?

@ No (if no, adjust sample count time and recalculate MDCF&,,) Comments: - 5aa7?dkr>

-0d'id, LSOCL?~ ~a@- 9 Technician Signature Pipe Interior Radiological Survey Package Page 1 of 5 Attachment 3, Page 1

.d' Pipe Interior Radiological Survey Form (Continuation Form) Date: 4-a-137 Pipe ID#: I.\\ Pipemeter:

Zd " Access Point Area: ~f'14 &fl Building:

f'fd Elevation:

0' System: f'&d Package Page L of 5 Attachment 3, Page 2

SECTION 7 ATTACHMENT 3 1 PAGE DQA Check Sheet Design # EP 1.11 Revision # Original Survey Unit # EP 1.11 Preliminary Data Review' Answers to the following questions should be fully documented in the Survey Unit Release Record Yes No NIA 1. Have surveys been performed in accordance with survey instructions in the Survey Design? X 2. Is the instrumentation MDC for structure static measurements below the DCGLw for Class 1 and 2 survey units, or below 0.5 DCGLw for Class 3 survey units? X 3. Is the instrumentation MDC for embeddedlburied piping static measurements below the DCGLW? X 4 Was the Instrumental on MDC for structure scan measdrements, so11 scan measurements, and emoeddedlbuned PIPI~Q scan measurements below tne DCGLW or. 11 not, *as the need for addltlonal X I static measurements or-soil samples addressed in the survey ddsign? 5. Was the instrumentation MDC for volumetric measurements and smear analvsis c 10% DCGLw ? 1 X 6. Were the MDCs and assumptions used to develop them appropriate for the instruments and techniques used to perform the survey? 7. Were the survey methods used to collect data proper for the types of radiation involved and for the media being surveyed?

8. Were "Special Methods" for data collection properly applied for the survey unit under review?
9. Is the data set comprised of qualified measurement results collected in accordance with the survey design, which accurately reflects the radiological status of the facility?

Gra~hical Data Review

1. Has a posting plot been created?

X 2. Has a histogram (or other frequency plot) been created?

X 3. Have other graphical data tools been created to assist in analyzing the data? X Data Analysis 1. Are all sample measurements below the DCGLw (Class 1 8 2). or 0.5 DCGLw (Class 3)?

X I 2. Is the mean of the sample data c DCGLW? I x I I .- . . . . - - 3. If e evated areas have been oenl.fied by sans and/or sampling is theiierage activity In each elevatea ar~._yD-c (CkassJ!..

%GLw (cle)s 2-5 DCGLw (c@)7, ,, . '1 . ,,Ix 4. Is the result of the Elevated Measurements Test c 1.0? I I I X 5. Is the result of the statistical test (S+ for Sign Test or W, for WRS Test) > the critical value? X -- Comments:

Page 1 of 1 SECTION 7 ATTACHMENT 4 1 DISC