March 2, 2016
Mr. Bryan Hanson Senior Vice President, Exelon Generation President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT: ANNUAL ASSESSMENT LETTER FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2015006 AND 05000278/2015006)
Dear Mr. Hanson:
On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter inspections at your facility. The NRC determined that overall, PBAPS Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at PBAPS Units 2 and 3 during the most recent quarter was within the Licensee inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to ROP baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, nstallation at Operating Plants.The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-s with Regard to Reliable Spent remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for PBAPS Units 2 and 3, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 2515-Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5262 with any questions you have regarding this letter.
Sincerely,/RA/ Daniel L. Schroeder, Chief Division of Reactor Projects Projects Branch 4 Docket Nos. 50-277 and 50-278 License Nos. NPF-44 and NPF-56
Enclosure:
Peach Bottom Inspection/Activity Plan cc w/encl: Distribution via ListServ
ML16060A376 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME ATurilin/ AT BSmith/ BS via email JHeinly/ JH via email DSchroeder/ DLS DATE 02/25 /16 02/ 25 /16 02/24 /16 02/29 /16 Page 1 of 2 02/24/2016 16:00:45Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SitePeach BottomInspection / Activity Plan 01/01/2016
-12/31/20177111117T-PERMANENT PLANT MODIFICATIONS 3 2, 3 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T01/25/2016 01/29/2016 2, 3 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T02/08/2016 02/12/2016 EP-EP EXERCISE EVALUATION 4 2, 3 IPExercise Evaluation711140104/25/2016 04/29/2016 RS1234-HP INSPECTION 1 2, 3 IPRadiological Hazard Assessment and Exposure Controls71124.0103/06/2016 03/10/2016 2, 3 IPOccupational ALARA Planning and Controls71124.0203/06/2016 03/10/2016 2, 3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/06/2016 03/10/2016 2, 3 IPOccupational Dose Assessment71124.0403/06/2016 03/10/2016 RS567PPI-HP TEAM INSPECTION 3 2, 3 IPRadiation Monitoring Instrumentation71124.0506/06/2016 06/10/2016 2, 3 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0606/06/2016 06/10/2016 2, 3 IPRadiological Environmental Monitoring Program71124.0706/06/2016 06/10/2016 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 06/06/2016 06/10/20167111107T-TRIENNIAL HEAT SINK 1 2, 3 IPHeat Sink Performance7111107T06/13/2016 06/17/20163/20EXAM-PEACH BOTTOM INITIAL EXAM 4 2 FY-17-PB INITIAL OPERATOR LICENSING EXAM U0194202/20/2017 02/24/2017 2 FY-17-PB INITIAL OPERATOR LICENSING EXAM U0194203/20/2017 03/31/20177111108G-PB U2 INSERVICE INSPECTION 1 2 IPInservice Inspection Activities - BWR7111108G10/31/201611/04/2016 RS1234PI-HP INSPECTION 1 2, 3 IPRadiological Hazard Assessment and Exposure Controls71124.0110/31/201611/04/2016 2, 3 IPOccupational ALARA Planning and Controls71124.0210/31/201611/04/2016 2, 3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/31/201611/04/2016 2, 3 IPOccupational Dose Assessment71124.0410/31/201611/04/2016 2, 3 IPOccupational Exposure Control Effectiveness71151-OR01 10/31/201611/04/20167111111B-PB REQUAL INSP WITH P/F RESULTS 2 2, 3 IPLicensed Operator Requalification Program7111111B03/06/2017 03/10/2017 CBDI-COMPONENT DESIGN BASIS INSPECTION 6 2, 3 IPComponent Design Bases Inspection711112101/30/2017 02/03/2017 2, 3 IPComponent Design Bases Inspection711112102/13/2017 02/17/2017 2, 3 IPComponent Design Bases Inspection711112102/27/2017 03/03/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 2 02/24/2016 16:00:45Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SitePeach BottomInspection / Activity Plan 01/01/2016
-12/31/2017 EP-EP PROGRAM INSPECTION 1 2, 3 IPAlert and Notification System Testing711140203/27/2017 03/31/2017 2, 3 IPEmergency Preparedness Organization Staffing and Augmentation System711140303/27/2017 03/31/2017 2, 3 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140503/27/2017 03/31/2017 2, 3 IPPerformance Indicator Verification7115103/27/2017 03/31/201771152B-PI&R BIENNIAL 2 2, 3 IPProblem Identification and Resolution71152B03/13/2017 03/17/2017 2, 3 IPProblem Identification and Resolution71152B03/27/2017 03/31/2017 RS12-HP INSPECTION 1 2, 3 IPRadiological Hazard Assessment and Exposure Controls71124.0103/27/2017 03/31/2017 2, 3 IPOccupational ALARA Planning and Controls71124.0203/27/2017 03/31/2017 ISFSI-ISFSI LOADING CAMPAIGN INSPECTION 1 2, 3 IPOperation Of An ISFSI 6085505/08/2017 05/12/2017 2, 3 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.105/08/2017 05/12/2017 RS34-HP INSPECTION 1 2, 3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/08/2017 05/12/2017 2, 3 IPOccupational Dose Assessment71124.0405/08/2017 05/12/2017 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01 05/08/2017 05/12/201771124.08-RADWASTE1 2, 3 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0807/17/2017 07/21/2017 RS123-HP INSPECTION 1 2, 3 IPRadiological Hazard Assessment and Exposure Controls71124.0110/23/2017 10/27/2017 2, 3 IPOccupational ALARA Planning and Controls71124.0210/23/2017 10/27/2017 2, 3 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/23/2017 10/27/2017 2 IPOccupational Exposure Control Effectiveness71151-OR01 10/23/2017 10/27/20177111108G-U3 INSERVICE INSPECTION 1 3 IPInservice Inspection Activities - BWR7111108G10/30/201711/03/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.