CONTACT: Eric A. Ruesch, RIV/DRS 817-200-1126 February 26, 2016
MEMORANDUM TO: Scott A. Morris, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM: Troy W. Pruett, Director/RA/ Division of Reactor Projects Region IV
SUBJECT:
CY 2015 BASELINE INSPECTION COMPLETION
During calendar year 2015, Region IV completed the baseline inspection program at all regional reactor licensees subject to the Reactor Oversight Process (ROP). Attached is a table which provides the completion status of individual baseline procedures (IR Report 8a). Please note that this data includes only activities for which the region had responsibility; those portions of the baseline inspection program for which other Nuclear Regulatory Commission organizations are responsible are not included.
The Fort Calhoun Station was transitioned from the Inspection Manual Chapter (IMC) 0305 ROP to IMC 0350 oversight effective December 11, 2011. The station remained in IMC 0350 oversight until April 1, 2015. Inspection activities at Fort Calhoun Station during the first quarter of calendar year 2015 were managed by the IMC 0350 process; the minimum inspection requirements of the ROP did not apply until April 1. If you have any questions or desire additional details, please contact me at 817-200-1248.
Enclosure:
Baseline Inspection Completion by Site (IR Report 8a) cc w/enclosure: M. Scott, RI J. Clark, RIV M. Franke, RII R. Lantz, RIV P. Louden, RIII T. Hipschman, RIV M. Dapas, RIV J. Peralta, NRR K. Kennedy, RIV N. Sanfilippo, NRR A. Vegel, RIV
SUNSI Review By: ERuesch ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE DRS/IPAT TL:DRS/IPAT D:DRS D:DRP NAME ERuesch THipschman AVegel TPruett SIGNATURE /RA/ /RA/ /RA/ /RA/ DATE 2/25/16 2/25/16 2/25/16 2/26/16 Page:Page 1 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Arkansas Nuclear One (ANO)7111101Adverse Weather ProtectionAnnually54Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually21Complete7111105QFire Protection - QuarterlyAnnually1816Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial32Complete7111108PInservice Inspection Activities - PWRAnnually31Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial21Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually178Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1514Complete7111115Operability DeterminationsAnnually2619Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4723Completecompleted in previous year(s)7111118Plant ModificationsAnnually53Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually32Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2114Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually51Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 2 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Arkansas Nuclear One (ANO)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial21Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually2424Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually76Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually51CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 3 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Callaway (CALL)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1816Complete7111105TFire Protection [Triennial]Triennial04Completeby reference iaw IMC 03067111105XFire Protection - NFPA 805 (Triennial)Triennial103Complete7111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWRAnnually01Completecompleted in previous year(s)7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1814Complete7111115Operability DeterminationsAnnually1715Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually33Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial2615Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Complete7111122Surveillance TestingAnnually1814Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually41Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 4 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Callaway (CALL)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually41CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 5 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Cooper (CNS)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1312Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1716Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial32Complete7111108GInservice Inspection Activities - BWRAnnually01Completecompleted in previous year(s)7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually98Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1714Complete7111115Operability DeterminationsAnnually1815Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually63Complete7111119Post Maintenance TestingAnnually2220Complete7111120Refueling and Other Outage ActivitiesAnnually12Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial2215Complete7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually1614Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually81Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial21Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 6 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Cooper (CNS)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually86Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually61CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 7 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Comanche Peak (CP)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1312Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1716Complete7111105TFire Protection [Triennial]Triennial64Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial42Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWRAnnually11Complete7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1614Complete7111115Operability DeterminationsAnnually2219Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually33Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually12Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial2215Complete7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Complete7111122Surveillance TestingAnnually1814Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually21Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 8 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Comanche Peak (CP)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually2424Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually91CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 9 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Diablo Canyon (DIAB)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually21Complete7111105QFire Protection - QuarterlyAnnually1716Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWRAnnually11Complete7111111AAnnual ReviewAnnually11Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually108Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually2014Complete7111115Operability DeterminationsAnnually1919Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4323Completecompleted in previous year(s)7111118Plant ModificationsAnnually73Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2414Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually161Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually43Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 10 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Diablo Canyon (DIAB)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually2424Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually76Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually101CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 11 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Fort Calhoun (FCS)7111101Adverse Weather ProtectionAnnually74Complete7111104Equipment Alignment (Quarterly)Annually1512Complete7111104SEquipment AlignmentSemiannually32Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually2216Complete7111105TFire Protection [Triennial]Triennial04Completeby reference iaw IMC 03067111105XFire Protection - NFPA 805 (Triennial)Triennial53Complete7111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually21Complete7111107THeat Sink PerformanceTriennial32Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWRAnnually11Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial21Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually138Complete7111112QMaintenance EffectivenessAnnually98Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1914Complete7111115Operability DeterminationsAnnually4915Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually53Complete7111119Post Maintenance TestingAnnually2420Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial2215Complete7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually1914Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually101Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 12 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Fort Calhoun (FCS)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial21Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually126Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually191CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 13 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Grand Gulf (GG)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually2116Complete7111105TFire Protection [Triennial]Triennial44Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108GInservice Inspection Activities - BWRAnnually01Completecompleted in previous year(s)7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1514Complete7111115Operability DeterminationsAnnually1815Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually02Completefull sample not available7111121Component Design Bases InspectionTriennial2215Complete7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2314Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually01Completeopportunity to apply full procedure not available7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 14 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Grand Gulf (GG)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually21CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 15 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Palo Verde (PALO)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment AlignmentSemiannually32Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1816Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial42Complete7111108PInservice Inspection Activities - PWRAnnually21Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial21Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually98Complete7111112QMaintenance EffectivenessAnnually98Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1614Complete7111115Operability DeterminationsAnnually2422Complete7111117TChanges, Tests, Exper, Perm ModsTriennial5423Completecompleted in previous year(s)7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2120Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2214Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually51Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 16 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Palo Verde (PALO)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually3535Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually86Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually91CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 17 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:River Bend (RBS)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1716Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial32Completecompleted in previous year(s)7111108GInservice Inspection Activities - BWRAnnually11Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial11Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1414Complete7111115Operability DeterminationsAnnually1615Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3823Complete7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial2615Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2014Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually61Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 18 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:River Bend (RBS)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial21Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually91CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 19 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:South Texas Project (STP)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually2116Complete7111105TFire Protection [Triennial]Triennial54Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial42Complete7111108PInservice Inspection Activities - PWRAnnually21Complete7111111AAnnual ReviewAnnually11Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually2014Complete7111115Operability DeterminationsAnnually2019Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4323Complete7111118Plant ModificationsAnnually53Complete7111119Post Maintenance TestingAnnually2120Complete7111120Refueling and Other Outage ActivitiesAnnually42Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2314Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually71Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 20 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:South Texas Project (STP)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually2424Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually31CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 21 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Waterford (WAT)7111101Adverse Weather ProtectionAnnually54Complete7111104Equipment Alignment (Quarterly)Annually1412Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1816Complete7111105TFire Protection [Triennial]Triennial44Complete7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually21Complete7111107THeat Sink PerformanceTriennial32Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWRAnnually11Completecompleted in previous year(s)7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1914Complete7111115Operability DeterminationsAnnually1815Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3723Complete7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2120Complete7111120Refueling and Other Outage ActivitiesAnnually12Completefull sample not available7111121Component Design Bases InspectionTriennial2415Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Complete7111122Surveillance TestingAnnually1714Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually41Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 22 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Waterford (WAT)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually61CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 23 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Wolf Creek (WC)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1312Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually2016Complete7111105TFire Protection [Triennial]Triennial84Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually21Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWRAnnually11Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial11Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1914Complete7111115Operability DeterminationsAnnually1715Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3723Complete7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually1814Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually41Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 24 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Wolf Creek (WC)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually86Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually51CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 25 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Columbia Generating Station (WNP)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1616Complete7111105TFire Protection [Triennial]Triennial74Complete7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108GInservice Inspection Activities - BWRAnnually11Complete7111111AAnnual ReviewAnnually01Completeopportunity to apply full procedure not available7111111BLicensed Operator RequalificationBiennial11Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1514Complete7111115Operability DeterminationsAnnually1715Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3923Completecompleted in previous year(s)7111118Plant ModificationsAnnually53Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually12Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually1614Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually51Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 26 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Columbia Generating Station (WNP)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually71CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
CONTACT: Eric A. Ruesch, RIV/DRS 817-200-1126 February 26, 2016
MEMORANDUM TO: Scott A. Morris, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM: Troy W. Pruett, Director/RA/ Division of Reactor Projects Region IV
SUBJECT:
CY 2015 BASELINE INSPECTION COMPLETION
During calendar year 2015, Region IV completed the baseline inspection program at all regional reactor licensees subject to the Reactor Oversight Process (ROP). Attached is a table which provides the completion status of individual baseline procedures (IR Report 8a). Please note that this data includes only activities for which the region had responsibility; those portions of the baseline inspection program for which other Nuclear Regulatory Commission organizations are responsible are not included.
The Fort Calhoun Station was transitioned from the Inspection Manual Chapter (IMC) 0305 ROP to IMC 0350 oversight effective December 11, 2011. The station remained in IMC 0350 oversight until April 1, 2015. Inspection activities at Fort Calhoun Station during the first quarter of calendar year 2015 were managed by the IMC 0350 process; the minimum inspection requirements of the ROP did not apply until April 1. If you have any questions or desire additional details, please contact me at 817-200-1248.
Enclosure:
Baseline Inspection Completion by Site (IR Report 8a) cc w/enclosure: M. Scott, RI J. Clark, RIV M. Franke, RII R. Lantz, RIV P. Louden, RIII T. Hipschman, RIV M. Dapas, RIV J. Peralta, NRR K. Kennedy, RIV N. Sanfilippo, NRR A. Vegel, RIV
SUNSI Review By: ERuesch ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE DRS/IPAT TL:DRS/IPAT D:DRS D:DRP NAME ERuesch THipschman AVegel TPruett SIGNATURE /RA/ /RA/ /RA/ /RA/ DATE 2/25/16 2/25/16 2/25/16 2/26/16 Page:Page 1 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Arkansas Nuclear One (ANO)7111101Adverse Weather ProtectionAnnually54Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually21Complete7111105QFire Protection - QuarterlyAnnually1816Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial32Complete7111108PInservice Inspection Activities - PWRAnnually31Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial21Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually178Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1514Complete7111115Operability DeterminationsAnnually2619Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4723Completecompleted in previous year(s)7111118Plant ModificationsAnnually53Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually32Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2114Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually51Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 2 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Arkansas Nuclear One (ANO)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial21Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually2424Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually76Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually51CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 3 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Callaway (CALL)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1816Complete7111105TFire Protection [Triennial]Triennial04Completeby reference iaw IMC 03067111105XFire Protection - NFPA 805 (Triennial)Triennial103Complete7111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWRAnnually01Completecompleted in previous year(s)7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1814Complete7111115Operability DeterminationsAnnually1715Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually33Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial2615Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Complete7111122Surveillance TestingAnnually1814Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually41Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 4 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Callaway (CALL)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually41CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 5 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Cooper (CNS)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1312Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1716Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial32Complete7111108GInservice Inspection Activities - BWRAnnually01Completecompleted in previous year(s)7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually98Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1714Complete7111115Operability DeterminationsAnnually1815Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually63Complete7111119Post Maintenance TestingAnnually2220Complete7111120Refueling and Other Outage ActivitiesAnnually12Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial2215Complete7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually1614Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually81Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial21Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 6 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Cooper (CNS)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually86Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually61CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 7 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Comanche Peak (CP)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1312Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1716Complete7111105TFire Protection [Triennial]Triennial64Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial42Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWRAnnually11Complete7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1614Complete7111115Operability DeterminationsAnnually2219Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually33Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually12Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial2215Complete7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Complete7111122Surveillance TestingAnnually1814Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually21Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 8 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Comanche Peak (CP)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually2424Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually91CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 9 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Diablo Canyon (DIAB)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually21Complete7111105QFire Protection - QuarterlyAnnually1716Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWRAnnually11Complete7111111AAnnual ReviewAnnually11Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually108Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually2014Complete7111115Operability DeterminationsAnnually1919Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4323Completecompleted in previous year(s)7111118Plant ModificationsAnnually73Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2414Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually161Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually43Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 10 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Diablo Canyon (DIAB)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually2424Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually76Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually101CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 11 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Fort Calhoun (FCS)7111101Adverse Weather ProtectionAnnually74Complete7111104Equipment Alignment (Quarterly)Annually1512Complete7111104SEquipment AlignmentSemiannually32Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually2216Complete7111105TFire Protection [Triennial]Triennial04Completeby reference iaw IMC 03067111105XFire Protection - NFPA 805 (Triennial)Triennial53Complete7111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually21Complete7111107THeat Sink PerformanceTriennial32Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWRAnnually11Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial21Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually138Complete7111112QMaintenance EffectivenessAnnually98Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1914Complete7111115Operability DeterminationsAnnually4915Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually53Complete7111119Post Maintenance TestingAnnually2420Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial2215Complete7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually1914Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually101Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 12 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Fort Calhoun (FCS)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial21Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually126Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually191CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 13 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Grand Gulf (GG)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually2116Complete7111105TFire Protection [Triennial]Triennial44Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108GInservice Inspection Activities - BWRAnnually01Completecompleted in previous year(s)7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1514Complete7111115Operability DeterminationsAnnually1815Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023Not Applicablecompletion not required during this inspection cycle7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually02Completefull sample not available7111121Component Design Bases InspectionTriennial2215Complete7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2314Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually01Completeopportunity to apply full procedure not available7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 14 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Grand Gulf (GG)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually21CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 15 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Palo Verde (PALO)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment AlignmentSemiannually32Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1816Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial42Complete7111108PInservice Inspection Activities - PWRAnnually21Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial21Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually98Complete7111112QMaintenance EffectivenessAnnually98Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1614Complete7111115Operability DeterminationsAnnually2422Complete7111117TChanges, Tests, Exper, Perm ModsTriennial5423Completecompleted in previous year(s)7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2120Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2214Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually51Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 16 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Palo Verde (PALO)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually3535Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually86Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually91CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 17 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:River Bend (RBS)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1716Complete7111105TFire Protection [Triennial]Triennial04Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial32Completecompleted in previous year(s)7111108GInservice Inspection Activities - BWRAnnually11Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial11Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1414Complete7111115Operability DeterminationsAnnually1615Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3823Complete7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial2615Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2014Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually61Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 18 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:River Bend (RBS)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial21Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually91CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 19 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:South Texas Project (STP)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually2116Complete7111105TFire Protection [Triennial]Triennial54Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial42Complete7111108PInservice Inspection Activities - PWRAnnually21Complete7111111AAnnual ReviewAnnually11Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually2014Complete7111115Operability DeterminationsAnnually2019Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4323Complete7111118Plant ModificationsAnnually53Complete7111119Post Maintenance TestingAnnually2120Complete7111120Refueling and Other Outage ActivitiesAnnually42Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually2314Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually71Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 20 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:South Texas Project (STP)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually2424Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually31CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 21 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Waterford (WAT)7111101Adverse Weather ProtectionAnnually54Complete7111104Equipment Alignment (Quarterly)Annually1412Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1816Complete7111105TFire Protection [Triennial]Triennial44Complete7111105XFire Protection - NFPA 805 (Triennial)Triennial03Not Applicablecompletion not required during this inspection cycle7111106Flood Protection MeasuresAnnually33Complete7111107AHeat Sink PerformanceAnnually21Complete7111107THeat Sink PerformanceTriennial32Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWRAnnually11Completecompleted in previous year(s)7111111AAnnual ReviewAnnually01Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11Complete7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1914Complete7111115Operability DeterminationsAnnually1815Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3723Complete7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2120Complete7111120Refueling and Other Outage ActivitiesAnnually12Completefull sample not available7111121Component Design Bases InspectionTriennial2415Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010Complete7111121NCDBI ProgramsTriennial06Complete7111122Surveillance TestingAnnually1714Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually41Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 22 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Waterford (WAT)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually61CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 23 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Wolf Creek (WC)7111101Adverse Weather ProtectionAnnually64Complete7111104Equipment Alignment (Quarterly)Annually1312Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually2016Complete7111105TFire Protection [Triennial]Triennial84Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually21Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWRAnnually11Complete7111111AAnnual ReviewAnnually11Complete7111111BLicensed Operator RequalificationBiennial11Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1914Complete7111115Operability DeterminationsAnnually1715Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3723Complete7111118Plant ModificationsAnnually43Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually22Complete7111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually1814Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually41Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Completecompleted in previous year(s)7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Complete71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 24 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Wolf Creek (WC)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Complete71124.04Occupational Dose AssessmentBiennial11Complete71124.05Radiation Monitoring InstrumentationBiennial11Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Completecompleted in previous year(s)71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually86Complete71152BPI&R (Biennial)Biennial11Completecompleted in previous year(s)71153Followup of Events and NOEDAnnually51CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 25 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Columbia Generating Station (WNP)7111101Adverse Weather ProtectionAnnually44Complete7111104Equipment Alignment (Quarterly)Annually1212Complete7111104SEquipment AlignmentSemiannually22Complete7111105AFire Protection - AnnualAnnually11Complete7111105QFire Protection - QuarterlyAnnually1616Complete7111105TFire Protection [Triennial]Triennial74Complete7111105XFire Protection - NFPA 805 (Triennial)Triennial03Completeby reference iaw IMC 03067111106Flood Protection MeasuresAnnually43Complete7111107AHeat Sink PerformanceAnnually11Complete7111107THeat Sink PerformanceTriennial02Not Applicablecompletion not required during this inspection cycle7111108GInservice Inspection Activities - BWRAnnually11Complete7111111AAnnual ReviewAnnually01Completeopportunity to apply full procedure not available7111111BLicensed Operator RequalificationBiennial11Completecompleted in previous year(s)7111111QLicensed Operator RequalificationAnnually88Complete7111112QMaintenance EffectivenessAnnually88Complete7111113Maint Risk Assessments & Emer Wk ControlAnnually1514Complete7111115Operability DeterminationsAnnually1715Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3923Completecompleted in previous year(s)7111118Plant ModificationsAnnually53Complete7111119Post Maintenance TestingAnnually2020Complete7111120Refueling and Other Outage ActivitiesAnnually12Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial015Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06Not Applicablecompletion not required during this inspection cycle7111122Surveillance TestingAnnually1614Complete7111401Exercise EvaluationBiennial01Completeby reference iaw IMC 03067111402Alert and Notification System TestingBiennial11Complete7111403EP Organizational Staffing/AugmentationBiennial11Complete7111404Emrgcy Act Lvl & Emrgcy Pln ChngsAnnually51Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11Complete7111406Drill EvaluationAnnually33Complete7111408Exercise Evaluation - Scenario ReviewBiennial11Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure ControlsAnnually11CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
Page:Page 26 of 2602/25/2016 15:35:12IR Report 8aBaseline Inspection Completion By SiteInspection Cycle: 45 (01/01/2015 - 12/31/2015)ProcedureTitleFrequencyStatusNoteSampleCompletedMinimumSampleRegion No:4Site:Columbia Generating Station (WNP)71124.02Occupational ALARABiennial21Complete71124.03Airbore RadioactivityBiennial11Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11Complete71124.06Rad Gas & Liquid TreatmentBiennial11Complete71124.07Rad. Environ. Monitoring Prog.Biennial11Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11Complete71151Performance Indicator VerficationAnnually1313Complete71151Performance Indicator VerficationAnnually33Complete71151Performance Indicator VerficationNot Applicable11Complete71152PI&RAnnually66Complete71152BPI&R (Biennial)Biennial11Complete71153Followup of Events and NOEDAnnually71CompleteNote: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.