ML16088A331
| ML16088A331 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 03/23/2016 |
| From: | Chisum M R Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16088A324 | List: |
| References | |
| W3F1-2016-0012 | |
| Download: ML16088A331 (2) | |
Text
- *===-Entergy W3F1-2016-0012 March 23, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) Docket No. 50-382 License No. NPF-38
Dear Sir or Madam:
Entergy Operations, Inc. 17265 River Road Killona, LA 70057-3093 Tel 504-739-6660 Fax 504-739-6698 mchisum@entergy.com Michael R. Chisum Site Vice President Waterford 3 Pursuant to 1 O CFR 51 and 10 CFR 54, Entergy Operations, Inc. (EOI) hereby applies for renewal of the operating license for the Waterford Steam Electric Station Unit 3 (Waterford 3) to extend the license for an additional 20 years beyond the current expiration date. With renewal, the Waterford 3 operating license would be extended from midnight on December 18, 2024, to midnight on December 18, 2044. The enclosed License Renewal Application and related Appendices contain the information required by 10 CFR 54 for the contents of an application. As required by 10 CFR 54.21 (b), current licensing basis changes which have a material effect on the contents of this application, including the Final Safety Analysis Report (FSAR) Supplement (Appendix A), will be identified at least annually while the application is under NRC review and at least three months prior to the scheduled completion of the NRC review. This application is submitted in accordance with 10 CFR 2 Subpart A, 10 CFR 50.4, and 10 CFR 50.30. EOI hereby submits the original of the application pursuant to 10 CFR 50.4(b), 10 CFR 51.55(a), and 10 CFR 54.17(a). Commitments contained in this application are listed in Appendix A, Section A.4. If you require additional information, please contact the Regulatory Assurance Manager, John Jarrell at 504-739-6685.
W3F1-2016-0012 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on March 23, 2016. Sincerely, MRC/LEM
Enclosure:
- 1. License Renewal Application 2. Appendix A -Final Safety Analysis Report Supplement 3. Appendix B -Aging Management Programs and Activities 4. Appendix C -Response to Selected Applicant/Licensee Action Items for Inspection and Evaluation Guidelines for PWR 5. Appendix D -Technical Specification Changes 6. Appendix E -Applicant's Environmental Report, Operating License Renewal Stage cc: with Enclosure Project Manager, License Renewal cc: without Enclosure Marc L. Dapas Regional Administrator, Region IV NRC Senior Resident Inspector Project Manager, Waterford 3 Project Manager, Lice.nse Renewal -Environmental Louisiana Department of Environmental Quality Phyllis.Clark@nrc.gov RidsRgn4MailCenter@nrc.gov Frances.Ramirez@nrc.gov Chris.Speer@nrc.gov April.Pulvirenti@nrc.gov Elaine.Keegan@nrc.gov Ji.Wiley@LA.gov
- *===-Entergy W3F1-2016-0012 March 23, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
License Renewal Application Waterford Steam Electric Station, Unit 3 (Waterford 3) Docket No. 50-382 License No. NPF-38
Dear Sir or Madam:
Entergy Operations, Inc. 17265 River Road Killona, LA 70057-3093 Tel 504-739-6660 Fax 504-739-6698 mchisum@entergy.com Michael R. Chisum Site Vice President Waterford 3 Pursuant to 1 O CFR 51 and 10 CFR 54, Entergy Operations, Inc. (EOI) hereby applies for renewal of the operating license for the Waterford Steam Electric Station Unit 3 (Waterford 3) to extend the license for an additional 20 years beyond the current expiration date. With renewal, the Waterford 3 operating license would be extended from midnight on December 18, 2024, to midnight on December 18, 2044. The enclosed License Renewal Application and related Appendices contain the information required by 10 CFR 54 for the contents of an application. As required by 10 CFR 54.21 (b), current licensing basis changes which have a material effect on the contents of this application, including the Final Safety Analysis Report (FSAR) Supplement (Appendix A), will be identified at least annually while the application is under NRC review and at least three months prior to the scheduled completion of the NRC review. This application is submitted in accordance with 10 CFR 2 Subpart A, 10 CFR 50.4, and 10 CFR 50.30. EOI hereby submits the original of the application pursuant to 10 CFR 50.4(b), 10 CFR 51.55(a), and 10 CFR 54.17(a). Commitments contained in this application are listed in Appendix A, Section A.4. If you require additional information, please contact the Regulatory Assurance Manager, John Jarrell at 504-739-6685.
W3F1-2016-0012 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on March 23, 2016. Sincerely, MRC/LEM
Enclosure:
- 1. License Renewal Application 2. Appendix A -Final Safety Analysis Report Supplement 3. Appendix B -Aging Management Programs and Activities 4. Appendix C -Response to Selected Applicant/Licensee Action Items for Inspection and Evaluation Guidelines for PWR 5. Appendix D -Technical Specification Changes 6. Appendix E -Applicant's Environmental Report, Operating License Renewal Stage cc: with Enclosure Project Manager, License Renewal cc: without Enclosure Marc L. Dapas Regional Administrator, Region IV NRC Senior Resident Inspector Project Manager, Waterford 3 Project Manager, Lice.nse Renewal -Environmental Louisiana Department of Environmental Quality Phyllis.Clark@nrc.gov RidsRgn4MailCenter@nrc.gov Frances.Ramirez@nrc.gov Chris.Speer@nrc.gov April.Pulvirenti@nrc.gov Elaine.Keegan@nrc.gov Ji.Wiley@LA.gov