Text
- w VpIM-4 Perry Nuclear Power Plant 10 Center Road MO. Box97 FrstEnergy Nuclear Operating Cornpary Perry. Ohio 4408 May 13, 2003 PY-CEI/NRR-2710L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant-Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the April 2003 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Vemon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
.,.'r I ~~~~~~~~y0
.. . . 1* ~e~
iWf - ;
OPERATING DATA REPORT UNIT: Perry DATE: 5/8/03
- 1. Docket: 50-440
- 2. Unit Name: Perry Nuclear Power Plant
- 3. Reporting Period: April 2003
- 4. Utility
Contact:
T. Phelps
- 5. Telephone: 440-280-7660
- 6. Design Electrical Rating (Net MWe): 1260
- 7. Maximum Dependable Capacity (Net MWe): 1235 This Month Yr-to-Date Cumulative
- 8. Hours Reactor was Critical 98.3 2.258.3 107,161.8
- 9. Hours Generator On-Line 96.0 2.256.0 104.526.3
- 10. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 11. Net Electrical Energy (MWeH) 82.043.0 2.565.708.0 119,140,919.0 Page 1
1',
UNIT SHUTDOWNS REPORT MONTH - APRIL 2003 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 5/8/03 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No. Date Type Duration Reason Method Cause and Correctve Action to Prevent Recurrence 1 Hours 2 3 03-01 4/5/03 S 623.0 C 1 The Perry Plant entered refuel outage #9 at 0601 on 4/5/03 and remained shutdownthrough months end.
_ __ I_
_ ___ I _ _ _ _ _
SUMMARY
- 1. TYPE: 2. REASON: 3. METHOD:
F: Forced A - Equipment Failure (explain) 1 - Manual S: Scheduled B - Maintenance or Test 2 - Manual Scram C - Refueling 3 -Automatic Scram D - Regulatory 4 - Continuation E - Operating Training & 5 - Other License Examination F - Administrative G - Operational Error (ekplain)
H - Other (explain)
Page 2 I