April 2003 Monthly Operating Report for Perry Unit 1
ML031410050
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/13/2003
From: Higaki V
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PY-CEI/NRR-2710L
Download: ML031410050 (3)


Text

FENOC

  • w VpIM-4 Perry Nuclear Power Plant 10 Center Road MO. Box97 FrstEnergy Nuclear Operating Cornpary Perry. Ohio 4408 May 13, 2003 PY-CEI/NRR-2710L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant-Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the April 2003 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Vemon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

.,.'r I ~~~~~~~~y0

.. . . 1* ~e~

iWf - ;

OPERATING DATA REPORT UNIT: Perry DATE: 5/8/03

1. Docket: 50-440
2. Unit Name: Perry Nuclear Power Plant
3. Reporting Period: April 2003
4. Utility

Contact:

T. Phelps

5. Telephone: 440-280-7660
6. Design Electrical Rating (Net MWe): 1260
7. Maximum Dependable Capacity (Net MWe): 1235 This Month Yr-to-Date Cumulative
8. Hours Reactor was Critical 98.3 2.258.3 107,161.8
9. Hours Generator On-Line 96.0 2.256.0 104.526.3
10. Unit Reserve Shutdown Hours 0.0 0.0 0.0
11. Net Electrical Energy (MWeH) 82.043.0 2.565.708.0 119,140,919.0 Page 1

1',

UNIT SHUTDOWNS REPORT MONTH - APRIL 2003 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 5/8/03 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No. Date Type Duration Reason Method Cause and Correctve Action to Prevent Recurrence 1 Hours 2 3 03-01 4/5/03 S 623.0 C 1 The Perry Plant entered refuel outage #9 at 0601 on 4/5/03 and remained shutdownthrough months end.

_ __ I_

_ ___ I _ _ _ _ _

SUMMARY

1. TYPE: 2. REASON: 3. METHOD:

F: Forced A - Equipment Failure (explain) 1 - Manual S: Scheduled B - Maintenance or Test 2 - Manual Scram C - Refueling 3 -Automatic Scram D - Regulatory 4 - Continuation E - Operating Training & 5 - Other License Examination F - Administrative G - Operational Error (ekplain)

H - Other (explain)

Page 2 I