December 11, 2003 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station, Unit 1
SUBJECT:
SUMMARY
OF THE OCTOBER 7, 2003, PUBLIC MEETINGS TO DISCUSS THE MANUAL CHAPTER 0350 PROCESS AT DAVIS-BESSE On October 7, 2003, the Nuclear Regulatory Commission (NRC) held two public meetings at the Camp Perry Clubhouse in Port Clinton, Ohio. The first meeting was between the NRC Davis-Besse Oversight Panel and FirstEnergy Nuclear Operating Company (FENOC) to discuss recent inspection results and the licensees Return to Service Plan for Davis-Besse Nuclear Power Station. The meeting notice, transcript, NRC Handout including the agenda, and the FENOC presentation can be found in ADAMS as ML032671130, ML033360405, ML032890584, and ML032830235; respectively. A list of NRC and licensee meeting participants can be found in the attached Enclosure.
The second meeting was between the NRC and members of the public. During the meeting, the NRC summarized the discussion from the earlier meeting between the NRC and FENOC.
A public question and answer session followed the summary. The meeting notice, transcript, and NRC handout including agenda can be found in ADAMS as ML032671147, ML033290297, and ML032890601; respectively.
These documents and many others related to the reactor vessel head degradation can also be found on the NRCs website at http://www.nrc.gov/reactors/operating/ops-experience/vessel-head-degradation.html.
/RA/
Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3
Enclosure:
As Stated See Attached Distribution DOCUMENT NAME: C:\ORPCheckout\FileNET\ML033490130.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy
OFFICE RIII RIII NAME CLipa for CLipa DPassehl/trn DATE 12/11/03 12/11/03 OFFICIAL RECORD COPY
FirstEnergy Nuclear Operating Company cc w/encls: The Honorable Dennis Kucinich G. Leidich, President - FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, FirstEnergy Ohio State Liaison Officer R. Owen, Ohio Department of Health Public Utilities Commission of Ohio D. Lochbaum, Union Of Concerned Scientists J. Riccio, Greenpeace P. Gunter, Nuclear Information & Resource Service S. Arndt, President, Ottawa County Board of Commissioners C. Emahiser, Ottawa County Sheriff J. P. Greer, Director, Ottawa County Emergency Management Agency H. Barlos, President, Lucas County Board of Commissioners J. Telb, Lucas County Sheriff B. Halsey, Director, Lucas County Emergency Management Agency G. Adams, Village Administrator, Genoa The Honorable John Weber The Honorable Lowell C. Krumnow The Honorable Joseph Verkin The Honorable Thomas Leaser The Honorable Jack Ford The Honorable Thomas Brown The Honorable Joe Ihnat, Jr.
FirstEnergy Nuclear Operating Company ADAMS Distribution:
AJM DFT DWW Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG HBC RML2 SRI Davis-Besse DRPIII DRSIII PLB1 JRK1 DB0350
Enclosure Meeting Participants NRC J. Grobe, Chairman, Davis-Besse Oversight Panel W. Ruland, Director, Project Directorate III C. Lipa, Branch Chief, RIII C. Thomas, Senior Resident Inspector, Davis-Besse J. Rutkowski, Resident Inspector, Davis-Besse M. Salter-Williams, Resident Inspector, Davis-Besse FirstEnergy Nuclear Operating Company L. Myers, Chief Operating Officer M. Bezilla, Site Vice President/Plant Manager M. Roder, Plant Manager/Operations G. Dunn, Manager - Outage Management and Work Control S. Loehlein, Manager - Nuclear Quality Assessment R. Dame, Reliability Unit Supervisor