July 2004 Monthly Operating Report for R E Ginna
ML042310552
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/10/2004
From: Widay J
Constellation Energy Group
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML042310552 (2)


Text

' ~J' 1503 Lake Road Ontario, New York 14519-9364 585.771.3000 Constellation Energy R.E. Ginna Nuclear Power Plant, LLC August 10, 2004 US Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate 1-1 Washington, DC 20555

Subject:

Monthly Report for July 2004 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of July 2004.

Very truly yours, h A. Widay 7J Plant Manager xc: U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

wr OPERATING DATA REPORT DOCKET NO. 50-244 UNIT NAME Gi nna I DATE Auigust 09, 2004 COMPLETED BY Xihn Walden., m . .

TELEPHONE (51i5) 771-3588 REPORTING PERIOD: July 2004

1. Design Electrical Rating 470.00
2. Maximum Dependable Capacity (MWe-Net) 480.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 5,111.00 252,109.22
4. Numberof Hours GeneratorOn-line 744.00 5,111.00 248,896.70
6. Reserve Shutdown Hours 0.00 0.00 8.50
6. Net Electrical Energy Generated (MWHrs) 363,554.00 2,529,134.00 113,726,635.0 UNIT SHUTDOWNS Type Method of N F: Forced Duration Shutting Cause & Corrective Action No. Date S Scheduled (Hours) Reason1 Down 2 Comments

SUMMARY

The unit operated at full power for the entire month of July. Average power for the month was 99.7%.

1 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 6 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of 1