ML042960360
| ML042960360 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/01/2004 |
| From: | - No Known Affiliation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2004-0307 | |
| Download: ML042960360 (2) | |
Text
J e.( No. fdff 3 3 -MB-- SYS CM- LCM PRIORITY: 6 WO #: 2719090 SEQUENCE: 3 LEAD WORK CENTER: EMS LEAD DISCP: PR&C DUE:
COMPONENT: 3EMBNC01**CKTBRK COMP DESC: VOLTAGE REGULATOR CABINET LOCATION: ZJ3A PROBLEM DESC:
Following the U3 trip of 6-14-2004, it was discovered through evaluation that the MEl/Fix Field circuits did not response correctly. Troubleshoot the casue of this problem, WORK DESC:
.. END WORK DESC TECH SPEC: N WX QR: N SAFETY REQD: N MATLS REQD: -BLANK-SEISMIC CAT:3 SPECIAL CONCERNS:N V CAT: N RCS PERT: SCFD REQD: N INSL REQD:N EQ MODE:
COATING: CRDL #:
PERMIT #:
POSTED PERMITS REP REQD: N REP #:
OTHER LEADS (DISCP):
OTHER SUPPORT (DISCP):
PREPARER DATE TECHNICAL APPROVAL DATE NOT REQUIRED TEAM LEADER DATE RELEASING ORGANIZATION DATE PLANNER BACKEND REVIEW REQUIRED []
U Page I of 2 Report Date: 01-JUL-2004
(WORK ORDER CLOSING INFORMATION) 3 3 -MB -SYS CM - LCM PRIORITY: 6 WO #: 2719090 SEQUENCE: 3 LEAD WORK CENTER EMS LEAD DISCP: PR&C DUE:
COMPONENT: 3EMBNC01**CKTBRK COMP DESC: VOLTAGE REGULATOR CABINET LOCATION: ZJ3A
. END WORK DESC WORK STARTDATE/TIME: WORK COMPLETE DATE/TIME:
JOB SUMATION:
BADGE # EMPLOYEE NAME TOTAL ACTUAL HOURS MATERIAL REQUESTS # S TEAM LEADER / DATE:
RETEST REFERENCE DOCUMENT:
Page 2 of 2 Report Date: 01-JUL-2004