ML111250159
| ML111250159 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/05/2011 |
| From: | Brian Bonser NRC/RGN-II/DRS/PSB1 |
| To: | Franke J FirstEnergy Nuclear Operating Co, Florida Power & Light Co |
| References | |
| IR-11-003 | |
| Download: ML111250159 (6) | |
See also: IR 05000302/2011003
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
May 5, 2011
Mr. Jon A. Franke
Vice President, Crystal River Nuclear Plant
Crystal River Nuclear Plant (NA2C)
15760 W. Power Line Street
Crystal River, FL 34428-6708
SUBJECT: CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NOTIFICATION
OF INSPECTION AND REQUEST FOR INFORMATION 05000302/2011003
Dear Mr. Franke:
During the period of June 13 -17, 2011, the NRC will conduct baseline radiation safety
inspection activities at the Crystal River 3 Nuclear Plant. The inspection will focus on the Public
Radiation Safety Inspection cornerstone using NRC Inspection Procedure (IP) 71124. 07.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your on-site resources and to conduct a
productive inspection, we have enclosed a request for documents needed for this inspection. It
is important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection. The lead inspector has requested that the subject informational material be
made available to the NRC staff by June 6, 2011, to allow preparation for the upcoming
inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory on-site contact for this inspection will be Mr. Dennis Herrin of your
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector, George B. Kuzo at (404) 997-4658.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
FPC 2
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Brian Bonser, Chief
Plant Support Branch 1
Division of Reactor Safety
Docket No.: 50-302
License No.: DPR-72
Enclosure:
Public Radiation Protection Inspection Document Request
cc w/encl.: (See page 3)
FPC 3
cc w/encl: Daniel R. Westcott
Kelvin Henderson Supervisor
General Manager Licensing & Regulatory Programs
Nuclear Fleet Operations Crystal River Nuclear Plant (NA1B)
Progress Energy Electronic Mail Distribution
Electronic Mail Distribution
Joseph W. Donahue
Brian C. McCabe Vice President
Manager, Nuclear Oversight Nuclear Oversight
Shearon Harris Nuclear Power Plant Progress Energy
Progress Energy Electronic Mail Distribution
Electronic Mail Distribution
Jack E. Huegel
James W. Holt Manager, Nuclear Oversight
Plant General Manager Crystal River Nuclear Plant
Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
Electronic Mail Distribution
David T. Conley
Stephen J. Cahill Senior Counsel
Director - Engineering Nuclear Legal Department
Crystal River Nuclear Plant (NA2C) Progress Energy
Electronic Mail Distribution Electronic Mail Distribution
R. Alexander Glenn Mark Rigsby
General Counsel Manager, Support Services - Nuclear
Progress Energy Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Electronic Mail Distribution
Jeffrey R. Swartz Senior Resident Inspector
Director Site Operations U.S. Nuclear Regulatory Commission
Crystal River Nuclear Plant Crystal River Nuclear Generating Plant
Electronic Mail Distribution U.S. NRC
6745 N Tallahassee Rd
Donna B. Alexander Crystal River, FL 34428
Manager, Nuclear Regulatory Affairs
(interim) Attorney General
Progress Energy Department of Legal Affairs
Electronic Mail Distribution The Capitol PL-01
Tallahassee, FL 32399-1050
Thomas Sapporito
Consulting Associate Bryan Koon
(Public Correspondence Only) Director
Post Office Box 8413 Florida Division of Emergency Management
Jupiter, FL 33468 Electronic Mail Distribution
William A. Passetti Chairman
Chief Board of County Commissioners
Florida Bureau of Radiation Control Citrus County
Department of Health 110 N. Apopka Avenue
Electronic Mail Distribution Inverness, FL 36250
ML111250159 X SUNSI REVIEW COMPLETE
OFFICE RII: DRS RII:DRS
NAME G. KUZO B. BONSER
DATE 05/05/2011 05/05/2011
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
PUBLIC RADIATION PROTECTION INSPECTION
DOCUMENT REQUEST
SITE: Crystal River Unit 3 (CR3) Report Number: 05000302/2011003
INSPECTION DATES: June 13 - 17, 2011
NRC INSPECTOR: George B. Kuzo George.Kuzo@NRC.GOV (404) 997-4658
PRELIMINARY LICENSEE CONTACTS: Radiation Controls - Bryan Akins at (352) 464-
7964(c); Effluents/Process Monitors/Radiological Environmental Monitoring Program - Lee
Hughes at (352) 563-4715 or (352) 464-7421(c) and/or Rudy Pinner at (352) 795-6486 ext.
3141; and Licensing - D. Herrin at (352) 563-4633.
Inspection Procedure (IP): IP 71124.07 Radiological Environmental Monitoring Program
Exposure Controls
Note: This is a broad list of the documents the lead NRC inspector will be interested in
reviewing and obtaining during the pre-inspection visit. The current version of these documents
is expected unless specified otherwise. Electronic media is preferred, if readily available. (The
preferred file format is Word, WordPerfect, or searchable pdf files on electronic media, e.g.
CD-ROM. Please provide 3 copies of each electronic device that is submitted.) Information in
the document lists should contain enough information to be easily understood by someone
who has knowledge of the subject. During the inspection, the inspectors may request additional
documents.
GENERAL INFORMATION NEEDED
Organization Charts and Contact Phone Numbers for:
Radiation Protection
Chemistry
Procedure for issuing Condition Report (CR) documents and assessing issues for risk
significance and follow-up actions.
Updated Final Safety Analysis Report Chapter 11, Effluents/Radwaste; and Chapter 12
Radiation Protection.
Current version/revision of the Offsite Dose Calculation Manual (ODCM).
Annual Radiological Environmental Operating Report (AREOR) for Calendar Year (CY)
Annual Radiological Effluent Release Report (ARERR) documents for CY 2008, CY 2009,
and CY 2010.
RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM [IP 71124.07]
Site and corporate procedures associated with radiological environmental monitoring
including:
Collection, preparation, and analysis of environmental samples including air samples,
TLD stations, ground and surface water, sediment, vegetation, milk, fish, etc.;
Enclosure
2
Calibration and maintenance of air/water sampling equipment;
Calibration and QC activities for sample counting instruments;
Sampling and monitoring program to detect leaks from contaminated or potentially
contaminated systems, structures, or components;
Meteorological instrument calibration, operation, and routine surveillances;
AREOR CYs 2008, 2009 and CY 2010. [Note: provided as part of the General Information
Request and do not need to be duplicated].
List of structures, systems, or components that contain or could contain licensed material for
which there is a credible mechanism for the radioactive material to reach ground water.
Summary of leaks and/or spills since October 1, 2008, i.e. additions to the 50.75(g) file.
Calibration and maintenance records for REMP air and composite water samplers since
October 1, 2008.
Inter-laboratory comparison program results for the past two years (in-house or vendor
laboratory).
Last two calibration /surveillance/maintenance records for the meteorological monitoring
instruments since October 1, 2008.
List of CAP CR and audit documents generated since October 1, 2008, related to
Radiological Environmental Monitoring Program and meteorological monitoring activities.
Enclosure