DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Revision as of 17:29, 4 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations
ML17125A237
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/05/2017
From: Gerfen P
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-17-042, RIS-17-003
Download: ML17125A237 (3)


Text

Pacific Gas and Electric C:ompany.r-Paula Gerfen lliablo Canyon Power Plant Station llirector Mail code 104/5/502 P.O. Box 56 Avila Beach, CA 93424 805.545.4596 Internal: 691.4596 Fax: 805.545.4234 May 5, 2017 PG&E Letter DCL-17-042 U.S. Nuclear Regulatory Commission 10 CFR Part 55 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations

Dear Commissioners and Staff:

Pursuant to the request for voluntary information identified in NRC Regulatory Issue Summary 2017-03, a completed NRC Form 536, "Operator Licensing Examination Data," is enclosed. This completed form provides Proposed Examination Preparation Schedules and Initial Operator License Examination data for years 2019 through 2022.

Pacific Gas and Electric Company makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions, please contact Mr. Bobby Simpson, Operations Training Manager, at (805) 545-3576.

8]2 Paula~~7f-bnsm/4540 Enclosure cc/enc: John M. Becerra, Simulator and Exam Support Supervisor Kriss M. Kennedy, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Bobby Simpson, Operations Training Manager Balwant K. Singal, NRC Senior Project Manager A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Enclosure PG&E Letter DCL-17-042 NRC Form 536, "Operator Licensing Examination Data"

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)

Estimated burden per response to comply v~th this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This tJ

!i ~~~

l;;.

'1~:

~

OPERATOR LICENSING infonnation collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to

~...,~....,_,.,

"/. . ~

EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of lnfonnation and Regulatory Affairs,

'~--? ~0 NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means

        • "" used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonnation collection.

FACILITY NRC REGION Diablo Canyon Power Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2019 CY2020 CY2021 CY2022 PROPOSED NUMBER ESTIMATED NUMBER OF

  • 0 LICENSEE-PREPARED 2 1 1 I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY20I9 CY2020 CY2021 CY2022 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS II & 8 8 8 8 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 5&8 8 8 8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0&0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0&0 0 0 0 PROPOSED DATES PRIMARY DATE l/I4/19 & 12/16/19 12/14/20 12/13/21 12/12/22 ALTERNATE DATE 1/28/19 & 12/09/19 12/07/20 12/06/21 12/05/22 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY N/A CY N/A PROPOSED NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF CANDIDATES NRC FORM 536 (05-2016)