ML17331A051
| ML17331A051 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 02/24/1993 |
| From: | Fitzpatrick E INDIANA MICHIGAN POWER CO. |
| To: | Cook D NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17331A052 | List: |
| References | |
| AEP:NRC:0968C, AEP:NRC:968C, NUDOCS 9303010141 | |
| Download: ML17331A051 (8) | |
Text
' ACCEI.ERATRi9 DOCUMENT DIST UTION SYSTEM
. "~!, REGULAT~ INFORMATION DISTRIBUTION STEM (RIDS)
ACCESSION ~NBR:930301014'1 -'DOC.DATE: 93/02/24 'NOTARIZED: NO DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316-Donald C. Cook Nuclear Power'lant, Unit 2, Indiana M 05000316 AUTH. NAME 'UTHOR AFFILIATION FITZPATRICK,E; Indiana Michigan Power Co.
RECIP.NAME" .'. RECIPIENT AFFILIATION, COOK,D.C. Document Control Branch (Document Control Desk),
1
SUBJECT:
Forwards "Reactor Containment Bldg Integrated Leakage Rate
-Unit 1," dtd Sept 1992 S "Reactor Containment Integrated Leakage Rate Unit 2," dtd May 1992. D DISTRIBUTION CODE: R017D COPIES RECEIVED:LTR' TITLE: OR Submittal: Append J Containment Leak Rate Testing ENCL SIZE 3 P NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTRENCL ID CODE/NAME LTTR ENCL PD3-1 PD 1 - 1 DEANFW 2 2 INTERNAL: NRR/DSSA/SPLB 1 1 O~ . 1 0 OGC/HDS2 1 1 ~~EG F . 01 1 1 RES/DE/SEB 1 1 RES/DSIR/SAIB 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 R'
-S'OTE TO ALL "RIDS" RECIPIENTS:
S I'LEASE HELP US TO REDUCE WASTE! CONTACI'HE DOCUMEN'I'O !'I'l
- > ~
AEP:NRC:0968C 10 CFR 50, App. J Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 INTEGRATED LEAK RATE TESTS U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Attn: T. E. Murley February 24, 1993 Dear Dr. Murleys Pursuant to the provisions of 10 CFR 50, Appendix J, Section Vg Paragraph B, attached are copies of the Reactor Containment Building Integrated Leakage Rate Test (ILRT) Reports for Donald C. Cook Nuclear Plant Units 1 and 2. The Unit 1 ILRT was successfully completed on October 1, 1992. The Unit 2 ILRT was successfully completed on May 12, 1992. The tests were performed as specified in surveillance test procedure **1 EHP and 2 EHP 4030 STP.202 and in accordance with the requirements of American National Standard Institute (ANSI) N45.4-1972, ANSI/ANS 56.8-1987, Bechtel Corporation Topical Report BN-TOP-1, the Code of Federal Regulations, the plant FSAR, and Technical Specification 4.6.1.2. Please note that a copy of the Unit 2 ILRT was provided to the NRC Region III office on October 12, 1992.~
Sincerely, E. E. Fit atrick Vice President Attachment VS0SOXolel iaohke ("l PDR ADOCK 05000315 P PDR
r 4 1l II l
i J
Dr. T. E. Murley AEP NRC:0968C cc: A. A. Blind Bridgman J. R. Padgett G. Charnoff A. B. Davis Region NRC Resident InsPector III Bridgman NFEM Section Chief
~
/
4
Dr. T. E. Murley AEP:NRC:0968C bc: S. J. Brewer D. H. Malin/K. J. Toth W. G. Smith, Jr.
M. L. Horvath Bridgman J.'B. Shinnock W. M. Dean, NRC Washington, D.C.